Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-39138
Well Classification: OW Status: PR - 3/1/2025
Well Name/No:REYNOLDS CATTLE #5C-23HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/1/2025
FacilityID:436451LocationID:436452
Municipality/County:MEAD / WELD #123Location:SENE 23 3N68W 6
Field:WATTENBERG - #90750Elevation:4956 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2011FNL  339 FELLat/Long: 40.213399 / -104.962001Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.213404 / -104.962001Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/2/2014
End Date: 12/9/2014
Reported: 1/20/2015
Days to report: 42
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 3/1/2025             Measured TD: 13401 ft.    Vertical TD: 7325 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 3/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/16/2016
Proposed Top PZ Location:Sec:24 Twp: 3N 68W Footage: 1732 FNL  360 FWL
Bottom Hole Location:Sec:23 Twp: 3N 68W Footage: 1732 FNL  50 FWL
Proposed Depth/Form:13409 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 480, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1323 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 500, Top: 0 ft., Bottom: 1323 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7851 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 830, Top: 0 ft., Bottom: 7851 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6847 ft., Depth: 13409 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:6/9/2014
Spud Date:4/20/2014Spud Date Is:ACTUAL
Measured TD:13401 ft.Measured PB depth:13340 ft.
True Vertical TD:7325 ft.True Vertical PB depth:7324 ft.
Top PZ Location:Sec:24 Twp: 3N 68WFootage: 1695 FNL  314 FWL
Bottom Hole Location:Sec:23 Twp: 3N 68WFootage: 1696 FNL  50 FWL
Log Types:CBL,GR,MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1381 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 514, Top: 0 ft., Bottom: 1381 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7884 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 810, Top: 31 ft., Bottom: 7884 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6837 ft., Depth: 13394 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 440, Top: 6837 ft., Bottom: 13394 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4294 ft.
SHARON SPRINGS7213 ft.
NIOBRARA7293 ft.
FORT HAYS7688 ft.
CODELL7759 ft.
CARLILE7969 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 8/17/2016                 Interval Top: 7969 ft.    Interval Bottom: 8262 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:7969 ft.# Of Holes:624
Interval Bottom:8262 ft.Hole Size:

Formation CD-CRL                 Formation Classification:  OW                 Status:  PR - 3/1/2025                  Interval Top: 7903 ft.    Interval Bottom: 13252 ft.

 Completed Information for Formation CODELL-CARLILE
1st Production Date:1/31/2015Choke Size: 
Formation Name:CODELL-CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/2/2014Treatment End Date:12/9/2014
Treatment Summary:PERF AND FRAC FROM 7903-13252. 101132 BBL SLICKWATER, 5950 BBL WATER, 107082 BBL TOTAL FLUID. 2853216# 100 MESH OTTAWA/ST. PETERS, 2853216# TOTAL SAND.
Total fluid used in treatment (bbls):107082Max pressure during treatment (psi):7264
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:27
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.76
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):112
Fresh water used in treatment (bbls):107082Disposition method For flowback:DISPOSAL
Total proppant used (lbs):2853216Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/9/2015Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 93
BBLS_OIL 178
BTU_GAS 1290
CALC_BBLS_H2O 93
CALC_BBLS_OIL 178
CALC_GOR 1674
CALC_MCF_GAS 298
CASING_PRESS 500
GRAVITY_OIL 49
MCF_GAS 298
Perforation Data:
Interval Top:7903 ft.# Of Holes:648
Interval Bottom:13252 ft.Hole Size:0.37 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 8/17/2016                 Interval Top: 7903 ft.    Interval Bottom: 13252 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7903 ft.# Of Holes:624
Interval Bottom:13252 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)1241
Total Gas Produced (MCF)8528
GOR6871
GOR DeterminationBOE
Average BOE per Day7.390
Average MCFE per Day42.849

 Federal Financial Assurance  i 

 Tribal Well  i No