|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 3/1/2025 Measured TD: 13401 ft. Vertical TD: 7325 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 3/1/2025 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 3/16/2016 | | Proposed Top PZ Location: | Sec:24 Twp: 3N 68W | Footage: 1732 FNL 360 FWL | | Bottom Hole Location: | Sec:23 Twp: 3N 68W | Footage: 1732 FNL 50 FWL | | Proposed Depth/Form: | 13409 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 480, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1323 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 500, Top: 0 ft., Bottom: 1323 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7851 ft., Weight: 26 , Citings Type: PLANNED | | Cement: | Sacks: 830, Top: 0 ft., Bottom: 7851 ft. | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6847 ft., Depth: 13409 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 6/9/2014 | | Spud Date: | 4/20/2014 | Spud Date Is: | ACTUAL | | Measured TD: | 13401 ft. | Measured PB depth: | 13340 ft. | | True Vertical TD: | 7325 ft. | True Vertical PB depth: | 7324 ft. | | Top PZ Location: | Sec:24 Twp: 3N 68W | Footage: 1695 FNL 314 FWL | | Bottom Hole Location: | Sec:23 Twp: 3N 68W | Footage: 1696 FNL 50 FWL | | Log Types: | CBL,GR,MUD | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1381 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 514, Top: 0 ft., Bottom: 1381 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7884 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 810, Top: 31 ft., Bottom: 7884 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6837 ft., Depth: 13394 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 440, Top: 6837 ft., Bottom: 13394 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4294 ft. | | | | | SHARON SPRINGS | 7213 ft. | | | | | NIOBRARA | 7293 ft. | | | | | FORT HAYS | 7688 ft. | | | | | CODELL | 7759 ft. | | | | | CARLILE | 7969 ft. | | | |
Formation CARL Formation Classification: OW Status: CM - 8/17/2016 Interval Top: 7969 ft. Interval Bottom: 8262 ft.| Completed Information for Formation CARLILE | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CARLILE | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CARL. |
| | Perforation Data: | | Interval Top: | 7969 ft. | # Of Holes: | 624 | | Interval Bottom: | 8262 ft. | Hole Size: | |
|
Formation CD-CRL Formation Classification: OW Status: PR - 3/1/2025 Interval Top: 7903 ft. Interval Bottom: 13252 ft.| Completed Information for Formation CODELL-CARLILE | | 1st Production Date: | 1/31/2015 | Choke Size: | | | Formation Name: | CODELL-CARLILE | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 12/2/2014 | Treatment End Date: | 12/9/2014 | | Treatment Summary: | PERF AND FRAC FROM 7903-13252.
101132 BBL SLICKWATER, 5950 BBL WATER, 107082 BBL TOTAL FLUID.
2853216# 100 MESH OTTAWA/ST. PETERS, 2853216# TOTAL SAND. | | Total fluid used in treatment (bbls): | 107082 | Max pressure during treatment (psi): | 7264 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 27 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.76 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 112 | | Fresh water used in treatment (bbls): | 107082 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 2853216 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/9/2015 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 93 | | BBLS_OIL | 178 | | BTU_GAS | 1290 | | CALC_BBLS_H2O | 93 | | CALC_BBLS_OIL | 178 | | CALC_GOR | 1674 | | CALC_MCF_GAS | 298 | | CASING_PRESS | 500 | | GRAVITY_OIL | 49 | | MCF_GAS | 298 |
| | Perforation Data: | | Interval Top: | 7903 ft. | # Of Holes: | 648 | | Interval Bottom: | 13252 ft. | Hole Size: | 0.37 in. |
|
Formation CODL Formation Classification: OW Status: CM - 8/17/2016 Interval Top: 7903 ft. Interval Bottom: 13252 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7903 ft. | # Of Holes: | 624 | | Interval Bottom: | 13252 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 1241 |
| Total Gas Produced (MCF) | 8528 |
| GOR | 6871 |
| GOR Determination | BOE |
| Average BOE per Day | 7.390 |
| Average MCFE per Day | 42.849 |
| Federal Financial Assurance | i | |
|
|