|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 4/6/2014 Measured TD: 12343 ft. Vertical TD: 7656 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 4/6/2014 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 3/16/2016 | | Proposed Top PZ Location: | Sec:34 Twp: 2N 67W | Footage: 631 FNL 2450 FWL | | Bottom Hole Location: | Sec:34 Twp: 2N 67W | Footage: 460 FSL 2450 FWL | | Proposed Depth/Form: | 12339 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1000 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 380, Top: 0 ft., Bottom: 1000 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8141 ft., Weight: 26 , Citings Type: PLANNED | | Cement: | Sacks: 860, Top: 0 ft., Bottom: 8141 ft. | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7143 ft., Depth: 12339 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 4/26/2014 | | Spud Date: | 4/7/2014 | Spud Date Is: | ACTUAL | | Measured TD: | 12343 ft. | Measured PB depth: | 12318 ft. | | True Vertical TD: | 7656 ft. | True Vertical PB depth: | 7655 ft. | | Top PZ Location: | Sec:34 Twp: 2N 67W | Footage: 526 FNL 2423 FWL | | Bottom Hole Location: | Sec:34 Twp: 2N 67W | Footage: 485 FSL 2471 FWL | | Log Types: | CBL, GR, MUD | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1076 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 402, Top: 0 ft., Bottom: 1076 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8064 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 860, Top: 290 ft., Bottom: 8064 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7136 ft., Depth: 12328 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4795 ft. | | | | | SHARON SPRINGS | 7408 ft. | | | | | NIOBRARA | 7486 ft. | | | | | FORT HAYS | 7858 ft. | | | | | CODELL | 7925 ft. | | | |
Formation FTHYS Formation Classification: OW Status: CM - 8/3/2016 Interval Top: 10755 ft. Interval Bottom: 11214 ft.| Completed Information for Formation FORT HAYS | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | FORT HAYS | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 8/3/2016 | Treatment End Date: | N/A | | Treatment Summary: | FT HAYS ENTERED 10,755-11,214 | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation FTHYS. |
| | Perforation Data: | | Interval Top: | 10755 ft. | # Of Holes: | 0 | | Interval Bottom: | 11214 ft. | Hole Size: | |
|
Formation CD-FH Formation Classification: OW Status: PR - 2/4/2015 Interval Top: 8132 ft. Interval Bottom: 12343 ft.| Completed Information for Formation CODELL-FORT HAYS | | 1st Production Date: | 1/27/2015 | Choke Size: | | | Formation Name: | CODELL-FORT HAYS | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | Yes |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 1/2/2015 | Treatment End Date: | 1/9/2015 | | Treatment Summary: | "COMPLETED THROUGH AN OPEN HOLE LINER FROM 8132-12,343.
24 BBL ACID, 40,354 BBL CROSSLINK GEL, 1,782 BBL LINEAR GEL, 16,132 BBL SLICKWATER, - 58,293 BBL TOTAL FLUID
2,370,357# 20/40 ECONOPROP, - 2,370,357# TOTAL SAND."
| | Total fluid used in treatment (bbls): | 58293 | Max pressure during treatment (psi): | 8150 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 30 | | Total acid used in treatment (bbls): | 24 | Min frac gradient (psi/ft): | 0.91 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 1771 | | Fresh water used in treatment (bbls): | 58269 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 2370357 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/4/2015 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 199 | | BBLS_OIL | 115 | | BTU_GAS | 1230 | | CALC_BBLS_H2O | 199 | | CALC_BBLS_OIL | 115 | | CALC_GOR | 1826 | | CALC_MCF_GAS | 210 | | CASING_PRESS | 825 | | GRAVITY_OIL | 50 | | MCF_GAS | 210 |
| | Perforation Data: | | Interval Top: | 8132 ft. | # Of Holes: | 0 | | Interval Bottom: | 12343 ft. | Hole Size: | |
|
Formation CODL Formation Classification: OW Status: CM - 8/3/2016 Interval Top: 8132 ft. Interval Bottom: 12343 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 8/3/2016 | Treatment End Date: | N/A | | Treatment Summary: | CODELLL ENTERED 8132-10,755 & 11,214-12,3434 | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 8132 ft. | # Of Holes: | 0 | | Interval Bottom: | 12343 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 1254 |
| Total Gas Produced (MCF) | 30565 |
| GOR | 24374 |
| GOR Determination | MCFE |
| Average BOE per Day | 17.881 |
| Average MCFE per Day | 103.708 |
| Federal Financial Assurance | i | |
|
|