|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 10/1/2017 Measured TD: 12005 ft. Vertical TD: 7433 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 10/1/2017 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 3/16/2016 | Proposed Top PZ Location: | Sec:34 Twp: 2N 67W | Footage: 630 FNL 150 FWL | Bottom Hole Location: | Sec:34 Twp: 2N 67W | Footage: 460 FSL 150 FWL | Proposed Depth/Form: | 12049 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1000 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 380, Top: 0 ft., Bottom: 1000 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7855 ft., Weight: 26 , Citings Type: PLANNED | Cement: | Sacks: 830, Top: 0 ft., Bottom: 7855 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6856 ft., Depth: 12049 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: , Top: , Bottom: |
| | |
Wellbore Completed | Completion Date: | 6/7/2014 | Spud Date: | 4/12/2014 | Spud Date Is: | ACTUAL | Measured TD: | 12005 ft. | Measured PB depth: | 12005 ft. | True Vertical TD: | 7433 ft. | True Vertical PB depth: | 7433 ft. | Top PZ Location: | Sec:34 Twp: 2N 67W | Footage: 690 FNL 165 FWL | Bottom Hole Location: | Sec:34 Twp: 2N 67W | Footage: 486 S 146 W | Log Types: | CBL, GR, MUD | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1063 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 364, Top: 0 ft., Bottom: 1063 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7895 ft., Weight: 26 , Citings Type: ACTUAL | Cement: | Sacks: 820, Top: 778 ft., Bottom: 7895 ft., Determination Method: CBL | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6933 ft., Depth: 11990 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: , Determination Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4746 ft. | | | | SHARON SPRINGS | 7455 ft. | | | | NIOBRARA | 7606 ft. | | | |
Formation NBRR Formation Classification: OW Status: PR - 10/1/2017 Interval Top: 7931 ft. Interval Bottom: 12005 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 1/27/2015 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 1/1/2015 | Treatment End Date: | 1/3/2015 | Treatment Summary: | "COMPLETED THROUGH AN OPEN HOLE LINER FROM 7931-12,005.
37,822 BBL CROSSLINK GEL, 1,934 BBL LINEAR GEL, 11,647 BBL SLICKWATER, - 51,403 BBL TOTAL FLUID
2,523,060# 20/40 PROPSTAR, - 2,523,060# TOTAL SAND."
| Total fluid used in treatment (bbls): | 51403 | Max pressure during treatment (psi): | 6961 | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | Type Of gas: | | Number Of staged intervals: | 30 | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.86 | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 3047 | Fresh water used in treatment (bbls): | 51403 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 2523060 | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 2/2/2015 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 217 | BBLS_OIL | 127 | BTU_GAS | 1230 | CALC_BBLS_H2O | 217 | CALC_BBLS_OIL | 127 | CALC_GOR | 1811 | CALC_MCF_GAS | 230 | CASING_PRESS | 1100 | GRAVITY_OIL | 50 | MCF_GAS | 230 |
| Perforation Data: | Interval Top: | 7931 ft. | # Of Holes: | 0 | Interval Bottom: | 12005 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 1565 |
Total Gas Produced (MCF) | 37421 |
GOR | 23911 |
GOR Determination | MCFE |
Average BOE per Day | 21.898 |
Average MCFE per Day | 127.033 |
Federal Financial Assurance | i | |
|
|