Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-39040
Well Classification: OW Status: PR - 6/1/2015
Well Name/No:CHESNUT #28R-243
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/1/2015
FacilityID:436286LocationID:436284
County:WELD #123Location:NENE 28 5N64W 6
Field:WATTENBERG - #90750Elevation:4620 ft.
Planned Location:466FNL  1260 FELLat/Long: 40.376260 / -104.549770Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.376260 / -104.549770Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/23/2015
End Date: 4/28/2015
Reported: 3/2/2016
Days to report: 309
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 6/1/2015             Measured TD: 13668 ft.    Vertical TD: 6594 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 6/1/2015
Wellbore PermitHORIZONTAL
Permit #:Expiration Date:2/26/2016
Proposed Top PZ Location:Sec:28 Twp: 5N 64W Footage: 818 FNL  1564 FEL
Bottom Hole Location:Sec:33 Twp: 5N 64W Footage: 2133 FNL  1589 FEL
Proposed Depth/Form:13728 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 480, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 875 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 830, Top: 0 ft., Bottom: 875 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7133 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 650, Top: 500 ft., Bottom: 7133 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 5930 ft., Depth: 13733 ft., Weight: 13.5 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:9/30/2014
Spud Date:9/21/2014Spud Date Is:ACTUAL
Measured TD:13668 ft.Measured PB depth:13660 ft.
True Vertical TD:6594 ft.True Vertical PB depth:6594 ft.
Top PZ Location:Sec:28 Twp: 5N 64WFootage: 962 FNL  1568 FEL
Bottom Hole Location:Sec:33 Twp: 5N 64WFootage: 2133 N  1575 E
Log Types:CBL, MWD (DIL in 123-18364, 123-18468, 123-23412, 123-15253 and 123-15254)
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 904 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 810, Top: 0 ft., Bottom: 904 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7175 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 551, Top: 460 ft., Bottom: 7175 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7032 ft., Depth: 13664 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
SUSSEX4340 ft.
PARKMAN6475 ft.
SHARON SPRINGS6545 ft.
NIOBRARA6706 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 6/22/2015                 Interval Top: 7238 ft.    Interval Bottom: 13668 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:6/11/2015Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/23/2015Treatment End Date:4/28/2015
Treatment Summary:28 Stage Sliding Sleeve, Swell Packer set at 7238' Total Fluid: 110,718 bbls Gel Fluid: 86,595 bbls Slickwater Fluid: 24,123 bbls Total Proppant: 5,826,000 lbs Silica Proppant: 5,826,000 lbs Method for determining flowback: measuring flowback tank volumes.
Total fluid used in treatment (bbls):110718Max pressure during treatment (psi):5928
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:28
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.99
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):3797
Fresh water used in treatment (bbls):110718Disposition method For flowback:DISPOSAL
Total proppant used (lbs):5826000Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6806 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/22/2015Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 149
BBLS_OIL 384
BTU_GAS 1258
CALC_BBLS_H2O 149
CALC_BBLS_OIL 384
CALC_GOR 2643
CALC_MCF_GAS 1015
CASING_PRESS 2381
GRAVITY_OIL 49
MCF_GAS 1015
TUBING_PRESS 1608
Perforation Data:
Interval Top:7238 ft.# Of Holes:
Interval Bottom:13668 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)3322
Total Gas Produced (MCF)60912
GOR18335
GOR DeterminationMCFE
Average BOE per Day37.690
Average MCFE per Day218.635

 Federal Financial Assurance  i 

 Tribal Well  i No