Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-39039
Well Classification: OW Status: PR - 6/1/2015
Well Name/No:Chesnut #28M-323
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/1/2015
FacilityID:436283LocationID:436284
County:WELD #123Location:NENE 28 5N64W 6
Field:WATTENBERG - #90750Elevation:4620 ft.
Planned Location:423FNL  1300 FELLat/Long: 40.376390 / -104.549920Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.376395 / -104.549928Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/28/2015
End Date: 5/1/2015
Reported: 3/2/2016
Days to report: 306
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 6/1/2015             Measured TD: 13920 ft.    Vertical TD: 6669 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 6/1/2015
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:2/26/2016
Proposed Top PZ Location:Sec:28 Twp: 5N 64W Footage: 818 FNL  2090 FEL
Bottom Hole Location:Sec:33 Twp: 5N 64W Footage: 2135 FNL  2118 FEL
Proposed Depth/Form:13845 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 240, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 875 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 830, Top: 0 ft., Bottom: 875 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7263 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 650, Top: 500 ft., Bottom: 7263 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6058 ft., Depth: 13870 ft., Weight: 13.5 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:9/3/2014
Spud Date:8/26/2014Spud Date Is:ACTUAL
Measured TD:13920 ft.Measured PB depth:13872 ft.
True Vertical TD:6669 ft.True Vertical PB depth:6669 ft.
Top PZ Location:Sec:28 Twp: 5N 64WFootage: 639 FNL  2086 FEL
Bottom Hole Location:Sec:33 Twp: 5N 64WFootage: 2134 N  2109 E
Log Types:CBL, MWD (DIL in 123-18364, 123-18468, 123-23412, 123-15253 and 123-15254)
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 930 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 830, Top: 0 ft., Bottom: 930 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7132 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 551, Top: 280 ft., Bottom: 7132 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6899 ft., Depth: 13876 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PARKMAN3468 ft.
SUSSEX4308 ft.
SHARON SPRINGS6460 ft.
NIOBRARA6603 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 6/18/2015                 Interval Top: 7143 ft.    Interval Bottom: 13920 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:6/15/2015Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/28/2015Treatment End Date:5/1/2015
Treatment Summary:28 Stage Sliding Sleeve, Swell Packer set at 7143' Total Fluid: 117,356 bbls Gel Fluid: 92,100 bbls Slickwater Fluid: 25,256 bbls Total Proppant: 6,020,300 lbs Silica Proppant: 6,020,300 lbs Method for determining flowback: measuring flowback tank volumes.
Total fluid used in treatment (bbls):117356Max pressure during treatment (psi):4018
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:28
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.99
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):3832
Fresh water used in treatment (bbls):117356Disposition method For flowback:DISPOSAL
Total proppant used (lbs):6020300Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6841 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/18/2015Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 431
BBLS_OIL 387
BTU_GAS 1252
CALC_BBLS_H2O 431
CALC_BBLS_OIL 387
CALC_GOR 2695
CALC_MCF_GAS 1043
CASING_PRESS 2707
GRAVITY_OIL 53
MCF_GAS 1043
TUBING_PRESS 1919
Perforation Data:
Interval Top:7143 ft.# Of Holes:
Interval Bottom:13920 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)5065
Total Gas Produced (MCF)96685
GOR19088
GOR DeterminationMCFE
Average BOE per Day59.354
Average MCFE per Day344.266

 Federal Financial Assurance  i 

 Tribal Well  i No