Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-38997
Well Classification: OW Status: PR - 1/1/2019
Well Name/No:NRC #27C-4HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/1/2019
FacilityID:436224LocationID:318806
County:WELD #123Location:SESE 9 1N67W 6
Field:WATTENBERG - #90750Elevation:5046 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:295FSL  690 FELLat/Long: 40.059078 / -104.888783Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.059077 / -104.888786Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 10/14/2014
End Date: 10/26/2014
Reported: 12/9/2014
Days to report: 44
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 1/1/2019             Measured TD: 17383 ft.    Vertical TD: 7712 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 1/1/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:2/22/2016
Proposed Top PZ Location:Sec:9 Twp: 1N 67W Footage: 862 FSL  1079 FEL
Bottom Hole Location:Sec:4 Twp: 1N 67W Footage: 484 FNL  1078 FEL
Proposed Depth/Form:17373 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 640, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1000 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 380, Top: 0 ft., Bottom: 1000 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8040 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 850, Top: 0 ft., Bottom: 8040 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7040 ft., Depth: 17373 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:5/3/2014
Spud Date:3/8/2014Spud Date Is:ACTUAL
Measured TD:17383 ft.Measured PB depth:17322 ft.
True Vertical TD:7712 ft.True Vertical PB depth:7713 ft.
Top PZ Location:Sec:9 Twp: 1N 67WFootage: 862 FSL  1079 FEL
Bottom Hole Location:Sec:4 Twp: 1N 67WFootage: 484 FNL  1078 FEL
Log Types:CBL, GR, MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1066 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 380, Top: 0 ft., Bottom: 1066 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8067 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 820, Top: 32 ft., Bottom: 8067 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7017 ft., Depth: 17371 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 690, Top: 7017 ft., Bottom: 17371 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SUSSEX4745 ft.
SHARON SPRINGS7342 ft.
NIOBRARA7387 ft.
FORT HAYS7895 ft.
CODELL8009 ft.

Formation CODL                     Formation Classification:  OW                     Status:  PR - 1/1/2019                  Interval Top: 8076 ft.    Interval Bottom: 17246 ft.

 Completed Information for Formation CODELL
1st Production Date:10/30/2014Choke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/14/2014Treatment End Date:10/26/2014
Treatment Summary:"PERF AND FRAC FROM 8076-17,246. 174,211 BBL SLICKWATER, 9,597 BBL WATER, - 183,808 BBL TOTAL FLUID 5,057,247# 40/70 GENOA/SAND HILLS, - 5,057,247# TOTAL SAND."
Total fluid used in treatment (bbls):183808Max pressure during treatment (psi):7520
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:46
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.71
Recycled water used in treatment (bbls):13050Total flowback volume recovered (bbls):496
Fresh water used in treatment (bbls):170758Disposition method For flowback:RECYCLE
Total proppant used (lbs):5057247Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/7/2014Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 158
BBLS_OIL 131
BTU_GAS 1250
CALC_BBLS_H2O 158
CALC_BBLS_OIL 131
CALC_GOR 1389
CALC_MCF_GAS 182
CASING_PRESS 1450
GRAVITY_OIL 49
MCF_GAS 182
Perforation Data:
Interval Top:8076 ft.# Of Holes:1090
Interval Bottom:17246 ft.Hole Size:0.37 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)4272
Total Gas Produced (MCF)80306
GOR18798
GOR DeterminationMCFE
Average BOE per Day49.451
Average MCFE per Day286.813

 Federal Financial Assurance  i 

 Tribal Well  i No