Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-38983
Well Classification: OW Status: PR - 7/1/2023
Well Name/No:KERR #35N-25HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/1/2023
FacilityID:436208LocationID:336189
County:WELD #123Location:SESW 13 2N67W 6
Field:WATTENBERG - #90750Elevation:4886 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:577FSL  1906 FWLLat/Long: 40.132331 / -104.841780Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.132333 / -104.841780Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/17/2015
End Date: 5/30/2015
Reported: 7/24/2015
Days to report: 55
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 7/1/2023             Measured TD: 17709 ft.    Vertical TD: 7318 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 7/1/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:2/22/2016
Proposed Top PZ Location:Sec:24 Twp: 2N 67W Footage: 516 FNL  1415 FWL
Bottom Hole Location:Sec:25 Twp: 2N 67W Footage: 1 FSL  1464 FWL
Proposed Depth/Form:17619 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 720, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1000 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 380, Top: 0 ft., Bottom: 1000 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7574 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 800, Top: 0 ft., Bottom: 7574 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6627 ft., Depth: 17619 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:11/29/2014
Spud Date:10/8/2014Spud Date Is:ACTUAL
Measured TD:17709 ft.Measured PB depth:17657 ft.
True Vertical TD:7318 ft.True Vertical PB depth:7316 ft.
Top PZ Location:Sec:24 Twp: 2N 67WFootage: 516 FNL  1415 FWL
Bottom Hole Location:Sec:25 Twp: 2N 67WFootage: 1 FSL  1464 FWL
Log Types:CBL, LWD with GR, (IND in API# 05-123-21506)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1079 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 425, Top: 0 ft., Bottom: 1079 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7722 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 750, Top: 30 ft., Bottom: 7722 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6457 ft., Depth: 17705 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 750, Top: 6457 ft., Bottom: 17705 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4406 ft.
SHARON SPRINGS7218 ft.
NIOBRARA7368 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 7/1/2023                  Interval Top: 7732 ft.    Interval Bottom: 17534 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:6/19/2015Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/17/2015Treatment End Date:5/30/2015
Treatment Summary:"PERF AND FRAC FROM 7732-17,534. 1,167 BBL ACID, 277,311 BBL SLICKWATER, 11,237 BBL WATER, - 289,715 BBL TOTAL FLUID 8,579,450# 40/70 GENOA/SAND HILLS, - 8,579,450# TOTAL SAND."
Total fluid used in treatment (bbls):289715Max pressure during treatment (psi):7455
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:49
Total acid used in treatment (bbls):1167Min frac gradient (psi/ft):0.84
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):951
Fresh water used in treatment (bbls):288548Disposition method For flowback:DISPOSAL
Total proppant used (lbs):8579450Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/27/2015Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 30
BBLS_OIL 110
BTU_GAS 1408
CALC_BBLS_H2O 30
CALC_BBLS_OIL 110
CALC_GOR 2991
CALC_MCF_GAS 329
CASING_PRESS 425
GRAVITY_OIL 48
MCF_GAS 329
Perforation Data:
Interval Top:7732 ft.# Of Holes:1152
Interval Bottom:17534 ft.Hole Size:0.37 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)5389
Total Gas Produced (MCF)105642
GOR19603
GOR DeterminationMCFE
Average BOE per Day64.722
Average MCFE per Day375.370

 Federal Financial Assurance  i 

 Tribal Well  i No