|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 5/1/2019 Measured TD: 17817 ft. Vertical TD: 7485 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 5/1/2019 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 2/22/2016 | | Proposed Top PZ Location: | Sec:24 Twp: 2N 67W | Footage: 460 FNL 1935 FWL | | Bottom Hole Location: | Sec:25 Twp: 2N 67W | Footage: 1 FSL 1935 FWL | | Proposed Depth/Form: | 17840 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 360, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1000 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 380, Top: 0 ft., Bottom: 1000 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7796 ft., Weight: 26 , Citings Type: PLANNED | | Cement: | Sacks: 820, Top: 0 ft., Bottom: 7796 ft. | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6846 ft., Depth: 17840 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 12/17/2015 | | Spud Date: | 10/11/2014 | Spud Date Is: | ACTUAL | | Measured TD: | 17817 ft. | Measured PB depth: | 17765 ft. | | True Vertical TD: | 7485 ft. | True Vertical PB depth: | 7487 ft. | | Top PZ Location: | Sec:24 Twp: 2N 67W | Footage: 532 FNL 1944 FWL | | Bottom Hole Location: | Sec:25 Twp: 2N 67W | Footage: 27 FSL 2011 FWL | | Log Types: | CBL, LWD with GR, MUD, (IND in API# 05-123-21506) | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1041 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 410, Top: 0 ft., Bottom: 1041 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7866 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 760, Top: 0 ft., Bottom: 7866 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6647 ft., Depth: 17813 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 750, Top: 6647 ft., Bottom: 17813 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4397 ft. | | | | | SHARON SPRINGS | 7131 ft. | | | | | NIOBRARA | 7217 ft. | | | | | FORT HAYS | 7697 ft. | | | | | CODELL | 7812 ft. | | | |
Formation FTHYS Formation Classification: OW Status: CM - 4/21/2017 Interval Top: 7953 ft. Interval Bottom: 16642 ft.| Completed Information for Formation FORT HAYS | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | FORT HAYS | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 4/21/2017 | Treatment End Date: | N/A | | Treatment Summary: | FORT HAYS : 7953-8416; 15,459-16,642 | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation FTHYS. |
| | Perforation Data: | | Interval Top: | 7953 ft. | # Of Holes: | 788 | | Interval Bottom: | 16642 ft. | Hole Size: | 0.37 in. |
|
Formation CD-FH Formation Classification: OW Status: PR - 5/1/2019 Interval Top: 7876 ft. Interval Bottom: 17689 ft.| Completed Information for Formation CODELL-FORT HAYS | | 1st Production Date: | 6/19/2015 | Choke Size: | | | Formation Name: | CODELL-FORT HAYS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 5/17/2015 | Treatment End Date: | 5/30/2015 | | Treatment Summary: | "PERF AND FRAC FROM 7876-17,689.
488 BBL ACID, 181,526 BBL SLICKWATER, 7,916 BBL TREATED WATER, - 189,930 BBL TOTAL FLUID
5,668,750# 40/70 GENOA, - 5,668,750# TOTAL SAND.
ENTERED CODELL: 7820-7953; 8416-15,459; 16,642-17,689
FORT HAYS : 7953-8416; 15,459-16,642;
THIS IS A DESIGNATED SOURCE OF SUPPLY WELL;
(SEE ATTACHMENT)
| | Total fluid used in treatment (bbls): | 189930 | Max pressure during treatment (psi): | 7390 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 33 | | Total acid used in treatment (bbls): | 488 | Min frac gradient (psi/ft): | 0.78 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 981 | | Fresh water used in treatment (bbls): | 189442 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 5668750 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/26/2015 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 44 | | BBLS_OIL | 21 | | BTU_GAS | 1408 | | CALC_BBLS_H2O | 44 | | CALC_BBLS_OIL | 21 | | CALC_GOR | 3810 | | CALC_MCF_GAS | 80 | | CASING_PRESS | 400 | | GRAVITY_OIL | 49 | | MCF_GAS | 80 |
| | Perforation Data: | | Interval Top: | 7876 ft. | # Of Holes: | 788 | | Interval Bottom: | 17689 ft. | Hole Size: | 0.37 in. |
|
Formation CODL Formation Classification: OW Status: CM - 4/21/2017 Interval Top: 7820 ft. Interval Bottom: 17689 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 4/21/2017 | Treatment End Date: | N/A | | Treatment Summary: | ENTERED CODELL: 7820-7953; 8416-15,459; 16,642-17,689
| | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7820 ft. | # Of Holes: | 788 | | Interval Bottom: | 17689 ft. | Hole Size: | 0.37 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 501 |
| Total Gas Produced (MCF) | 27067 |
| GOR | 54025 |
| GOR Determination | MCFE |
| Average BOE per Day | 14.155 |
| Average MCFE per Day | 82.097 |
| Federal Financial Assurance | i | |
|
|