Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-38966
Well Classification: OW Status: SI - 2/1/2025
Well Name/No:Becker Ranch #5M-423
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date2/1/2025
FacilityID:436184LocationID:436185
County:WELD #123Location:NWNE 5 3N64W 6
Field:WATTENBERG - #90750Elevation:4782 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:211FNL  1875 FELLat/Long: 40.261180 / -104.572080Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.261180 / -104.572080Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 10/26/2015
End Date: 10/27/2015
Reported: 11/11/2015
Days to report: 15
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 2/1/2025             Measured TD: 11441 ft.    Vertical TD: 6974 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 2/1/2025
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:2/20/2016
Proposed Top PZ Location:Sec:5 Twp: 3N 64W Footage: 734 FNL  2319 FEL
Bottom Hole Location:Sec:5 Twp: 3N 64W Footage: 500 FSL  2297 FEL
Proposed Depth/Form:11453 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.25 in., Size: 9.625 in., Top: 0 ft., Depth: 875 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 830, Top: 0 ft., Bottom: 875 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7556 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 650, Top: 500 ft., Bottom: 7556 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6243 ft., Depth: 11438 ft., Weight: 13.5 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:3/28/2015
Spud Date:3/19/2015Spud Date Is:ACTUAL
Measured TD:11441 ft.Measured PB depth:11434 ft.
True Vertical TD:6974 ft.True Vertical PB depth:6974 ft.
Top PZ Location:Sec:5 Twp: 3N 64WFootage: 890 FNL  2318 FEL
Bottom Hole Location:Sec:5 Twp: 3N 64WFootage: 501 FSL  2293 FEL
Log Types:CBL, MWD (DIL in 123-16974)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 925 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 770, Top: 0 ft., Bottom: 925 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7418 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 570, Top: 0 ft., Bottom: 7418 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6998 ft., Depth: 11437 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PARKMAN3720 ft.
SUSSEX4255 ft.
SHARON SPRINGS6656 ft.
NIOBRARA6866 ft.
FORT HAYS7254 ft.
CODELL7492 ft.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 9/11/2019                 Interval Top: 8750 ft.    Interval Bottom: 9440 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:
Treatment Date:9/11/2019Treatment End Date:N/A
Treatment Summary:Completed Depths: 8,750'-9,440'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8750 ft.# Of Holes:
Interval Bottom:9440 ft.Hole Size:

Formation CD-FH                   Formation Classification:  OW                   Status:  SI - 2/1/2025                  Interval Top: 7492 ft.    Interval Bottom: 11441 ft.

 Completed Information for Formation CODELL-FORT HAYS
1st Production Date:11/6/2015Choke Size: 
Formation Name:CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/26/2015Treatment End Date:10/27/2015
Treatment Summary:20 Stage Sliding Sleeve, Swell Packer set @ 7,492' Total Fluid: 76,232 bbls Gel Fluid: 56,784 bbls Slickwater Fluid: 19,448 bbls Total Proppant: 4,041,340 lbs Silica Proppant: 4,041,340 lbs Method for determining flowback: measuring flowback tank volumes.
Total fluid used in treatment (bbls):76232Max pressure during treatment (psi):4229
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:20
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.96
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):12027
Fresh water used in treatment (bbls):76232Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4041340Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7046 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/17/2015Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 216
BBLS_OIL 188
BTU_GAS 1283
CALC_BBLS_H2O 216
CALC_BBLS_OIL 188
CALC_GOR 5096
CALC_MCF_GAS 958
CASING_PRESS 2299
GRAVITY_OIL 54
MCF_GAS 958
TUBING_PRESS 1621
Perforation Data:
Interval Top:7492 ft.# Of Holes:
Interval Bottom:11441 ft.Hole Size:

Formation CODL                     Formation Classification:  OW                     Status:  CM - 9/11/2019                 Interval Top: 7492 ft.    Interval Bottom: 11441 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:
Treatment Date:9/11/2019Treatment End Date:N/A
Treatment Summary:Completed Depths: 7,492'-8,750' 9,440'-11,441'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7492 ft.# Of Holes:
Interval Bottom:11441 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)570
Total Gas Produced (MCF)19134
GOR33568
GOR DeterminationMCFE
Average BOE per Day10.529
Average MCFE per Day61.050

 Federal Financial Assurance  i 

 Tribal Well  i No