Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-38966
Well Classification: OW Status: SI - 2/1/2025
Well Name/No:Becker Ranch #5M-423
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date2/1/2025
FacilityID:436184LocationID:436185
County:WELD #123Location:NWNE 5 3N64W 6
Field:WATTENBERG - #90750Elevation:4782 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:211FNL  1875 FELLat/Long: 40.261180 / -104.572080Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.261180 / -104.572080Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 10/26/2015
End Date: 10/27/2015
Reported: 11/11/2015
Days to report: 15
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 2/1/2025             Measured TD: 11441 ft.    Vertical TD: 6974 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 2/1/2025
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:2/20/2016
Proposed Top PZ Location:Sec:5 Twp: 3N 64W Footage: 734 FNL  2319 FEL
Bottom Hole Location:Sec:5 Twp: 3N 64W Footage: 500 FSL  2297 FEL
Proposed Depth/Form:11453 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.25 in., Size: 9.625 in., Top: 0 ft., Depth: 875 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 830, Top: 0 ft., Bottom: 875 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7556 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 650, Top: 500 ft., Bottom: 7556 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6243 ft., Depth: 11438 ft., Weight: 13.5 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:3/28/2015
Spud Date:3/19/2015Spud Date Is:ACTUAL
Measured TD:11441 ft.Measured PB depth:11434 ft.
True Vertical TD:6974 ft.True Vertical PB depth:6974 ft.
Top PZ Location:Sec:5 Twp: 3N 64WFootage: 890 FNL  2318 FEL
Bottom Hole Location:Sec:5 Twp: 3N 64WFootage: 501 FSL  2293 FEL
Log Types:CBL, MWD (DIL in 123-16974)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 925 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 770, Top: 0 ft., Bottom: 925 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7418 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 570, Top: 0 ft., Bottom: 7418 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6998 ft., Depth: 11437 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PARKMAN3720 ft.
SUSSEX4255 ft.
SHARON SPRINGS6656 ft.
NIOBRARA6866 ft.
FORT HAYS7254 ft.
CODELL7492 ft.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 9/11/2019                 Interval Top: 8750 ft.    Interval Bottom: 9440 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:
Treatment Date:9/11/2019Treatment End Date:N/A
Treatment Summary:Completed Depths: 8,750'-9,440'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8750 ft.# Of Holes:
Interval Bottom:9440 ft.Hole Size:

Formation CD-FH                   Formation Classification:  OW                   Status:  SI - 2/1/2025                  Interval Top: 7492 ft.    Interval Bottom: 11441 ft.

 Completed Information for Formation CODELL-FORT HAYS
1st Production Date:11/6/2015Choke Size: 
Formation Name:CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/26/2015Treatment End Date:10/27/2015
Treatment Summary:20 Stage Sliding Sleeve, Swell Packer set @ 7,492' Total Fluid: 76,232 bbls Gel Fluid: 56,784 bbls Slickwater Fluid: 19,448 bbls Total Proppant: 4,041,340 lbs Silica Proppant: 4,041,340 lbs Method for determining flowback: measuring flowback tank volumes.
Total fluid used in treatment (bbls):76232Max pressure during treatment (psi):4229
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:20
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.96
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):12027
Fresh water used in treatment (bbls):76232Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4041340Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7046 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/17/2015Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 216
BBLS_OIL 188
BTU_GAS 1283
CALC_BBLS_H2O 216
CALC_BBLS_OIL 188
CALC_GOR 5096
CALC_MCF_GAS 958
CASING_PRESS 2299
GRAVITY_OIL 54
MCF_GAS 958
TUBING_PRESS 1621
Perforation Data:
Interval Top:7492 ft.# Of Holes:
Interval Bottom:11441 ft.Hole Size:

Formation CODL                     Formation Classification:  OW                     Status:  CM - 9/11/2019                 Interval Top: 7492 ft.    Interval Bottom: 11441 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:
Treatment Date:9/11/2019Treatment End Date:N/A
Treatment Summary:Completed Depths: 7,492'-8,750' 9,440'-11,441'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7492 ft.# Of Holes:
Interval Bottom:11441 ft.Hole Size:
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
01/2025 - 12/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)1
Total Gas Produced (MCF)15
GOR15000
GOR DeterminationBOE
Average BOE per Day0.011
Average MCFE per Day0.056

 Federal Financial Assurance  i 

 Tribal Well  i No