Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-38950
Well Classification: OW Status: PR - 11/1/2018
Well Name/No:SPURLING #35N-34HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/1/2018
FacilityID:436143LocationID:436137
County:WELD #123Location:NWNW 34 2N67W 6
Field:WATTENBERG - #90750Elevation:5015 ft.
Planned Location:377FNL  1088 FWLLat/Long: 40.100998 / -104.882530Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.100997 / -104.882527Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/30/2014
End Date: 1/1/2015
Reported: 2/23/2015
Days to report: 53
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 11/1/2018             Measured TD: 11951 ft.    Vertical TD: 7448 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 11/1/2018
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:2/13/2016
Proposed Top PZ Location:Sec:34 Twp: 2N 67W Footage: 628 FNL  1070 FWL
Bottom Hole Location:Sec:34 Twp: 2N 67W Footage: 460 FSL  1070 FWL
Proposed Depth/Form:11993 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1000 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 380, Top: 0 ft., Bottom: 1000 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7794 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 820, Top: 0 ft., Bottom: 7794 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6795 ft., Depth: 11993 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:5/21/2014
Spud Date:4/10/2014Spud Date Is:ACTUAL
Measured TD:11951 ft.Measured PB depth:11926 ft.
True Vertical TD:7448 ft.True Vertical PB depth:7447 ft.
Top PZ Location:Sec:34 Twp: 2N 67WFootage: 702 FNL  1101 FWL
Bottom Hole Location:Sec:34 Twp: 2N 67WFootage: 486 S  1136 W
Log Types:CBL, GR. MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1067 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 367, Top: 0 ft., Bottom: 1067 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7851 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 810, Top: 30 ft., Bottom: 7851 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6834 ft., Depth: 11936 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
SUSSEX4712 ft.
SHARON SPRINGS7370 ft.
NIOBRARA7488 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 11/1/2018                 Interval Top: 7916 ft.    Interval Bottom: 11951 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:1/27/2015Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/30/2014Treatment End Date:1/1/2015
Treatment Summary:"COMPLETED THROUGH AN OPEN HOLE LINER FROM 7916-11,951. 24 BBLS 7.5% HCL ACID, 37,293 BBL CROSSLINK GEL, 3,407 BBL LINEAR GEL, 11,050 BBL SLICKWATER, - 51,774 BBL TOTAL FLUID 2,315,226# 20/40 PROPSTAR, - 2,315,226# TOTAL SAND."
Total fluid used in treatment (bbls):51774Max pressure during treatment (psi):8676
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:30
Total acid used in treatment (bbls):24Min frac gradient (psi/ft):0.86
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):3014
Fresh water used in treatment (bbls):51750Disposition method For flowback:DISPOSAL
Total proppant used (lbs):2315226Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/3/2015Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 190
BBLS_OIL 115
BTU_GAS 1230
CALC_BBLS_H2O 190
CALC_BBLS_OIL 115
CALC_GOR 1826
CALC_MCF_GAS 210
CASING_PRESS 1000
GRAVITY_OIL 50
MCF_GAS 210
Perforation Data:
Interval Top:7916 ft.# Of Holes:0
Interval Bottom:11951 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)1011
Total Gas Produced (MCF)22151
GOR21909
GOR DeterminationMCFE
Average BOE per Day13.196
Average MCFE per Day76.540

 Federal Financial Assurance  i 

 Tribal Well  i No