Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-38948
Well Classification: OW Status: PR - 11/13/2014
Well Name/No:HOUSTON #33N-8HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/13/2014
FacilityID:436140LocationID:329740
County:WELD #123Location:NESE 8 3N67W 6
Field:WATTENBERG - #90750Elevation:4807 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1750FSL  594 FELLat/Long: 40.237885 / -104.906903Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.237892 / -104.906909Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/16/2014
End Date: 9/17/2014
Reported: 10/21/2014
Days to report: 34
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 11/13/2014             Measured TD: 11743 ft.    Vertical TD: 6933 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 11/13/2014
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:2/13/2016
Proposed Top PZ Location:Sec:8 Twp: 3N 67W Footage: 1492 FSL  627 FEL
Bottom Hole Location:Sec:8 Twp: 3N 67W Footage: 1460 FSL  50 FWL
Proposed Depth/Form:11793 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 400, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 758 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 290, Top: 0 ft., Bottom: 758 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7307 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 770, Top: 0 ft., Bottom: 7307 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6305 ft., Depth: 11793 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:5/31/2014
Spud Date:3/17/2014Spud Date Is:ACTUAL
Measured TD:11743 ft.Measured PB depth:11743 ft.
True Vertical TD:6933 ft.True Vertical PB depth:6933 ft.
Top PZ Location:Sec:8 Twp: 3N 67WFootage: 1477 FSL  724 FEL
Bottom Hole Location:Sec:8 Twp: 3N 67WFootage: 1454 FSL  76 FWL
Log Types:CBL, GR, MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 823 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 323, Top: 0 ft., Bottom: 823 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7383 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 739, Top: 35 ft., Bottom: 7383 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6378 ft., Depth: 11733 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SUSSEX4157 ft.
SHARON SPRINGS6980 ft.
NIOBRARA7111 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 11/13/2014                Interval Top: 7411 ft.    Interval Bottom: 11743 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:11/7/2014Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/16/2014Treatment End Date:9/17/2014
Treatment Summary:"COMPLETED THROUGH AN OPEN HOLE LINER FROM 7411-11,743. 6,757 BBL CROSSLINK GEL, 728 BBL LINEAR GEL, 78,297 BBL SLICKWATER, - 85,782 BBL TOTAL FLUID 195,579# 30/50 OTTAWA/ST. PETERS, 624,755# 40/70 GENOA/SAND HILLS, 1,446,236# 40/70 UNIMIN\PROPSTAR, 2,266,570# TOTAL SAND."
Total fluid used in treatment (bbls):85782Max pressure during treatment (psi):7412
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:35
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.94
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):801
Fresh water used in treatment (bbls):85782Disposition method For flowback:DISPOSAL
Total proppant used (lbs):2266570Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/13/2014Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1207
BBLS_OIL 80
BTU_GAS 1350
CALC_BBLS_H2O 1207
CALC_BBLS_OIL 80
CALC_GOR 4275
CALC_MCF_GAS 342
CASING_PRESS 1100
GRAVITY_OIL 48
MCF_GAS 342
Perforation Data:
Interval Top:7411 ft.# Of Holes:
Interval Bottom:11743 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)2811
Total Gas Produced (MCF)32968
GOR11728
GOR DeterminationBOE
Average BOE per Day23.252
Average MCFE per Day134.861

 Federal Financial Assurance  i 

 Tribal Well  i No