Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-38946
Well Classification: OW Status: PR - 2/1/2022
Well Name/No:HOUSTON #12C-8HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/1/2022
FacilityID:436136LocationID:329740
County:WELD #123Location:NESE 8 3N67W 6
Field:WATTENBERG - #90750Elevation:4808 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1765FSL  620 FELLat/Long: 40.237928 / -104.906995Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.237931 / -104.907001Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/17/2014
End Date: 9/18/2014
Reported: 10/29/2014
Days to report: 41
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 2/1/2022             Measured TD: 11894 ft.    Vertical TD: 7132 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 2/1/2022
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:2/13/2016
Proposed Top PZ Location:Sec:8 Twp: 3N 67W Footage: 2127 FSL  742 FEL
Bottom Hole Location:Sec:8 Twp: 3N 67W Footage: 2135 FSL  76 FWL
Proposed Depth/Form:12008 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 200, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 758 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 290, Top: 0 ft., Bottom: 758 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7523 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 800, Top: 0 ft., Bottom: 7523 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6523 ft., Depth: 12008 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:6/8/2014
Spud Date:3/18/2014Spud Date Is:ACTUAL
Measured TD:11894 ft.Measured PB depth:11894 ft.
True Vertical TD:7132 ft.True Vertical PB depth:7132 ft.
Top PZ Location:Sec:8 Twp: 3N 67WFootage: 2127 FSL  742 FEL
Bottom Hole Location:Sec:8 Twp: 3N 67WFootage: 2135 FSL  76 FWL
Log Types:CBL, GR, MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 832 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 327, Top: 0 ft., Bottom: 832 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7562 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 675, Top: 470 ft., Bottom: 7562 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6597 ft., Depth: 11894 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SUSSEX4155 ft.
SHARON SPRINGS6894 ft.
NIOBRARA6957 ft.
FORT HAYS7378 ft.
CODELL7439 ft.

Formation CODL                     Formation Classification:  OW                     Status:  PR - 2/1/2022                  Interval Top: 7618 ft.    Interval Bottom: 11872 ft.

 Completed Information for Formation CODELL
1st Production Date:11/26/2014Choke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/17/2014Treatment End Date:9/18/2014
Treatment Summary:"COMPLETED THROUGH AN OPEN HOLE LINER FROM 7618-11,872. 6,438 BBL CROSSLINK GEL, 1,394 BBL LINEAR GEL, 78,013 BBL SLICKWATER, - 85,845 BBL TOTAL FLUID 185,267# 30/50 OTTAWA/ST. PETERS, 1,993,957# 40/70 GENOA/SAND HILLS, - 2,179,224# TOTAL SAND."
Total fluid used in treatment (bbls):85845Max pressure during treatment (psi):7170
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:35
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.67
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):3018
Fresh water used in treatment (bbls):85845Disposition method For flowback:DISPOSAL
Total proppant used (lbs):2179224Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7104 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/2/2014Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 133
BBLS_OIL 214
BTU_GAS 1350
CALC_BBLS_H2O 133
CALC_BBLS_OIL 214
CALC_GOR 1977
CALC_MCF_GAS 423
CASING_PRESS 1880
GRAVITY_OIL 53
MCF_GAS 423
TUBING_PRESS 994
Perforation Data:
Interval Top:7618 ft.# Of Holes:0
Interval Bottom:11872 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)1188
Total Gas Produced (MCF)26167
GOR22026
GOR DeterminationMCFE
Average BOE per Day15.562
Average MCFE per Day90.231

 Federal Financial Assurance  i 

 Tribal Well  i No