Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-38945
Well Classification: OW Status: PR - 2/1/2020
Well Name/No:NRC #3C-8HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/1/2020
FacilityID:436135LocationID:436145
County:WELD #123Location:SESW 8 1N67W 6
Field:WATTENBERG - #90750Elevation:5052 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:376FSL  2259 FWLLat/Long: 40.059373 / -104.915875Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.059380 / -104.915857Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/17/2014
End Date: 8/18/2014
Reported: 10/2/2014
Days to report: 45
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 2/1/2020             Measured TD: 12929 ft.    Vertical TD: 7734 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 2/1/2020
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:2/13/2016
Proposed Top PZ Location:Sec:8 Twp: 1N 67W Footage: 1 FSL  1935 FWL
Bottom Hole Location:Sec:8 Twp: 1N 67W Footage: 460 FNL  1935 FWL
Proposed Depth/Form:12978 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 200, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1161 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 440, Top: 0 ft., Bottom: 1161 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8156 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 860, Top: 0 ft., Bottom: 8156 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7052 ft., Depth: 12978 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:4/1/2014
Spud Date:3/5/2014Spud Date Is:ACTUAL
Measured TD:12929 ft.Measured PB depth:12929 ft.
True Vertical TD:7734 ft.True Vertical PB depth:7734 ft.
Top PZ Location:Sec:8 Twp: 1N 67WFootage: 48 FSL  2150 FWL
Bottom Hole Location:Sec:8 Twp: 1N 67WFootage: 482 FNL  2083 FWL
Log Types:CBL, GR, MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1258 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 386, Top: 0 ft., Bottom: 1258 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8174 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 830, Top: 415 ft., Bottom: 8174 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7106 ft., Depth: 12914 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SUSSEX4799 ft.
SHARON SPRINGS7447 ft.
NIOBRARA7492 ft.
FORT HAYS7952 ft.
CODELL8014 ft.

Formation CODL                     Formation Classification:  OW                     Status:  PR - 2/1/2020                  Interval Top: 8227 ft.    Interval Bottom: 12929 ft.

 Completed Information for Formation CODELL
1st Production Date:9/8/2014Choke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/17/2014Treatment End Date:8/18/2014
Treatment Summary:"COMPLETED THROUGH AN OPEN HOLE LINER FROM 8227-12929. 9,439 BBL CROSSLINK GEL, 2,316 BBL LINEAR GEL, 80,379 BBL SLICKWATER, - 92,134 BBL TOTAL FLUID 293,706# 30/50 GENOA/SAND HILLS, 2,042,959# 40/70 GENOA/SAND HILLS, 2,336,665# TOTAL SAND."
Total fluid used in treatment (bbls):92134Max pressure during treatment (psi):7233
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:37
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.79
Recycled water used in treatment (bbls):3300Total flowback volume recovered (bbls):483
Fresh water used in treatment (bbls):88834Disposition method For flowback:RECYCLE
Total proppant used (lbs):2336665Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/13/2014Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 219
BBLS_OIL 176
BTU_GAS 1328
CALC_BBLS_H2O 219
CALC_BBLS_OIL 176
CALC_GOR 2023
CALC_MCF_GAS 356
CASING_PRESS 1350
GRAVITY_OIL 51
MCF_GAS 356
Perforation Data:
Interval Top:8227 ft.# Of Holes:0
Interval Bottom:12929 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)2380
Total Gas Produced (MCF)52392
GOR22013
GOR DeterminationMCFE
Average BOE per Day31.175
Average MCFE per Day180.812

 Federal Financial Assurance  i 

 Tribal Well  i No