Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-38943
Well Classification: OW Status: PR - 11/17/2014
Well Name/No:HOUSTON #34N-8HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/17/2014
FacilityID:436133LocationID:329740
County:WELD #123Location:NESE 8 3N67W 6
Field:WATTENBERG - #90750Elevation:4806 ft.
Planned Location:1719FSL  543 FELLat/Long: 40.237800 / -104.906719Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.237801 / -104.906725Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/12/2014
End Date: 9/14/2014
Reported: 10/21/2014
Days to report: 37
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 11/17/2014             Measured TD: 11931 ft.    Vertical TD: 6933 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 11/17/2014
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:2/13/2016
Proposed Top PZ Location:Sec:8 Twp: 3N 67W Footage: 381 FSL  624 FEL
Bottom Hole Location:Sec:8 Twp: 3N 67W Footage: 350 FSL  50 FWL
Proposed Depth/Form:11957 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 400, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 758 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 290, Top: 0 ft., Bottom: 758 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7467 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 790, Top: 0 ft., Bottom: 7467 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6465 ft., Depth: 11957 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:5/10/2014
Spud Date:3/15/2014Spud Date Is:ACTUAL
Measured TD:11931 ft.Measured PB depth:11931 ft.
True Vertical TD:6933 ft.True Vertical PB depth:6933 ft.
Top PZ Location:Sec:8 Twp: 3N 67WFootage: 347 FSL  665 FEL
Bottom Hole Location:Sec:8 Twp: 3N 67WFootage: 352 S  75 W
Log Types:CBL, GR, MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 821 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 391, Top: 0 ft., Bottom: 821 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7511 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 780, Top: 60 ft., Bottom: 7511 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6533 ft., Depth: 11921 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SUSSEX4235 ft.
SHARON SPRINGS7117 ft.
NIOBRARA7201 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 11/17/2014                Interval Top: 7565 ft.    Interval Bottom: 11921 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:11/7/2014Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/9/2014Treatment End Date:9/14/2014
Treatment Summary:"COMPLETED THROUGH AN OPEN HOLE LINER FROM 7565-11,921. 6660 BBL CROSSLINK GEL, 1,197 BBL LINEAR GEL, 80,120 BBL SLICKWATER, - 87,977 BBL TOTAL FLUID 192,261# 30/50 OTTAWA/ST. PETERS, 2,051,768# 40/70 GENOA/SAND HILLS, - 2,244,029# TOTAL SAND."
Total fluid used in treatment (bbls):87977Max pressure during treatment (psi):7309
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:35
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.94
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):2362
Fresh water used in treatment (bbls):87977Disposition method For flowback:DISPOSAL
Total proppant used (lbs):2244029Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/17/2014Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 296
BTU_GAS 1350
CALC_BBLS_OIL 296
CALC_GOR 1456
CALC_MCF_GAS 431
CASING_PRESS 1200
GRAVITY_OIL 48
MCF_GAS 431
Perforation Data:
Interval Top:7565 ft.# Of Holes:0
Interval Bottom:11921 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)2568
Total Gas Produced (MCF)35536
GOR13838
GOR DeterminationBOE
Average BOE per Day23.727
Average MCFE per Day137.637

 Federal Financial Assurance  i 

 Tribal Well  i No