Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-38866
Well Classification: OW Status: PR - 4/11/2022
Well Name/No:TAHOMA E #22-69HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/11/2022
FacilityID:435932LocationID:435930
County:WELD #123Location:SWSW 14 6N65W 6
Field:WATTENBERG - #90750Elevation:4739 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:293FSL  530 FWLLat/Long: 40.479600 / -104.638160Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.479599 / -104.638172Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/3/2014
End Date: 9/5/2014
Reported: 10/28/2014
Days to report: 53
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 4/11/2022             Measured TD: 11989 ft.    Vertical TD: 7089 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 4/11/2022
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:1/20/2016
Proposed Top PZ Location:Sec:22 Twp: 6N 65W Footage: 50 FNL  2000 FEL
Bottom Hole Location:Sec:22 Twp: 6N 65W Footage: 109 FNL  77 FWL
Proposed Depth/Form:11989 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CARL , Formation: CARLILE , Order: , Unit Acreage: 400, Drill Unit: GWA
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 400, Drill Unit: GWA
Formation And Spacing:Code: FTHYS , Formation: FORT HAYS , Order: , Unit Acreage: 400, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 18.5 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 6, Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 590 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 290, Top: 0 ft., Bottom: 590 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7509 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 500, Top: , Bottom: 7509 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7359 ft., Depth: 11989 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:6/14/2014
Spud Date:6/7/2014Spud Date Is:ACTUAL
Measured TD:11989 ft.Measured PB depth:11973 ft.
True Vertical TD:7089 ft.True Vertical PB depth:7089 ft.
Top PZ Location:Sec:22 Twp: 6N 65WFootage: 50 FNL  2000 FEL
Bottom Hole Location:Sec:22 Twp: 6N 65WFootage: 109 FNL  77 FWL
Log Types:USIT, MUD, GR COGCC: Res log well is 05-123-38867 Eagle E14-62-1HN
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 620 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 358, Top: 0 ft., Bottom: 620 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7549 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 617, Top: 575 ft., Bottom: 7549 ft., Determination Method: CALC
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7310 ft., Depth: 11974 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PIERRE955 ft.
PARKMAN3616 ft.
SUSSEX4184 ft.
SHANNON4965 ft.
TEEPEE BUTTES6084 ft.
NIOBRARA6836 ft.
CODELL7394 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 4/11/2022                 Interval Top: 10403 ft.    Interval Bottom: 10557 ft.

 Completed Information for Formation CARLILE
1st Production Date:9/9/2014Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:4/11/2022Treatment End Date:N/A
Treatment Summary:Intervals: 10403'-10557'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:10403 ft.# Of Holes:0
Interval Bottom:10557 ft.Hole Size:

Formation CODL                     Formation Classification:  OW                     Status:  CM - 3/11/2022                 Interval Top: 8878 ft.    Interval Bottom: 11891 ft.

 Completed Information for Formation CODELL
1st Production Date:9/9/2014Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:4/11/2022Treatment End Date:N/A
Treatment Summary:Intervals: 8878'-9315', 9436'-10402', 10558'-11891'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/30/2014Treatment End Date:9/5/2014
Treatment Summary:FRAC'D W/2459634 GALS SILVERSTIM AND SLICK WATER AND 2343883# OTTAWA SAND
Total fluid used in treatment (bbls):58562Max pressure during treatment (psi):6140
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:6
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.79
Recycled water used in treatment (bbls):2537Total flowback volume recovered (bbls):1077
Fresh water used in treatment (bbls):56025Disposition method For flowback:RECYCLE
Total proppant used (lbs):2343883Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 20
BBLS_OIL 182
BTU_GAS 1256
CALC_BBLS_H2O 20
CALC_BBLS_OIL 182
CALC_GOR 2362
CALC_MCF_GAS 430
CASING_PRESS 1840
GRAVITY_OIL 40
MCF_GAS 430
TUBING_PRESS 1160
Perforation Data:
Interval Top:8878 ft.# Of Holes:0
Interval Bottom:11891 ft.Hole Size:

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 4/11/2022                 Interval Top: 7680 ft.    Interval Bottom: 11891 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:9/9/2014Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CLCDFH.
Perforation Data:
Interval Top:7680 ft.# Of Holes:22
Interval Bottom:11891 ft.Hole Size:

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 4/11/2022                 Interval Top: 7680 ft.    Interval Bottom: 9435 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:9/9/2014Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:4/11/2022Treatment End Date:N/A
Treatment Summary:Intervals: 7680'-8877', 9316'-9435'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:7680 ft.# Of Holes:0
Interval Bottom:9435 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)6081
Total Gas Produced (MCF)61458
GOR10106
GOR DeterminationBOE
Average BOE per Day45.628
Average MCFE per Day264.626

 Federal Financial Assurance  i 

 Tribal Well  i No