Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-38866
Well Classification: OW Status: PR - 4/11/2022
Well Name/No:TAHOMA E #22-69HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/11/2022
FacilityID:435932LocationID:435930
County:WELD #123Location:SWSW 14 6N65W 6
Field:WATTENBERG - #90750Elevation:4739 ft.
Planned Location:293FSL  530 FWLLat/Long: 40.479600 / -104.638160Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.479599 / -104.638172Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/3/2014
End Date: 9/5/2014
Reported: 10/28/2014
Days to report: 53
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 4/11/2022             Measured TD: 11989 ft.    Vertical TD: 7089 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 4/11/2022
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:1/20/2016
Proposed Top PZ Location:Sec:22 Twp: 6N 65W Footage: 50 FNL  2000 FEL
Bottom Hole Location:Sec:22 Twp: 6N 65W Footage: 109 FNL  77 FWL
Proposed Depth/Form:11989 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CARL , Formation: CARLILE , Order: , Unit Acreage: 400, Drill Unit: GWA
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 400, Drill Unit: GWA
Formation And Spacing:Code: FTHYS , Formation: FORT HAYS , Order: , Unit Acreage: 400, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 18.5 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 6, Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 590 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 290, Top: 0 ft., Bottom: 590 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7509 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 500, Top: , Bottom: 7509 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7359 ft., Depth: 11989 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:6/14/2014
Spud Date:6/7/2014Spud Date Is:ACTUAL
Measured TD:11989 ft.Measured PB depth:11973 ft.
True Vertical TD:7089 ft.True Vertical PB depth:7089 ft.
Top PZ Location:Sec:22 Twp: 6N 65WFootage: 50 FNL  2000 FEL
Bottom Hole Location:Sec:22 Twp: 6N 65WFootage: 109 FNL  77 FWL
Log Types:USIT, MUD, GR COGCC: Res log well is 05-123-38867 Eagle E14-62-1HN
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 620 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 358, Top: 0 ft., Bottom: 620 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7549 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 617, Top: 575 ft., Bottom: 7549 ft., Determination Method: CALC
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7310 ft., Depth: 11974 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PIERRE955 ft.
PARKMAN3616 ft.
SUSSEX4184 ft.
SHANNON4965 ft.
TEEPEE BUTTES6084 ft.
NIOBRARA6836 ft.
CODELL7394 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 4/11/2022                 Interval Top: 10403 ft.    Interval Bottom: 10557 ft.

 Completed Information for Formation CARLILE
1st Production Date:9/9/2014Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:4/11/2022Treatment End Date:N/A
Treatment Summary:Intervals: 10403'-10557'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:10403 ft.# Of Holes:0
Interval Bottom:10557 ft.Hole Size:

Formation CODL                     Formation Classification:  OW                     Status:  CM - 3/11/2022                 Interval Top: 8878 ft.    Interval Bottom: 11891 ft.

 Completed Information for Formation CODELL
1st Production Date:9/9/2014Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:4/11/2022Treatment End Date:N/A
Treatment Summary:Intervals: 8878'-9315', 9436'-10402', 10558'-11891'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/30/2014Treatment End Date:9/5/2014
Treatment Summary:FRAC'D W/2459634 GALS SILVERSTIM AND SLICK WATER AND 2343883# OTTAWA SAND
Total fluid used in treatment (bbls):58562Max pressure during treatment (psi):6140
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:6
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.79
Recycled water used in treatment (bbls):2537Total flowback volume recovered (bbls):1077
Fresh water used in treatment (bbls):56025Disposition method For flowback:RECYCLE
Total proppant used (lbs):2343883Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 20
BBLS_OIL 182
BTU_GAS 1256
CALC_BBLS_H2O 20
CALC_BBLS_OIL 182
CALC_GOR 2362
CALC_MCF_GAS 430
CASING_PRESS 1840
GRAVITY_OIL 40
MCF_GAS 430
TUBING_PRESS 1160
Perforation Data:
Interval Top:8878 ft.# Of Holes:0
Interval Bottom:11891 ft.Hole Size:

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 4/11/2022                 Interval Top: 7680 ft.    Interval Bottom: 11891 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:9/9/2014Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CLCDFH.
Perforation Data:
Interval Top:7680 ft.# Of Holes:22
Interval Bottom:11891 ft.Hole Size:

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 4/11/2022                 Interval Top: 7680 ft.    Interval Bottom: 9435 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:9/9/2014Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:4/11/2022Treatment End Date:N/A
Treatment Summary:Intervals: 7680'-8877', 9316'-9435'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:7680 ft.# Of Holes:0
Interval Bottom:9435 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
April 2024 - March 2025i
Total Oil Produced (Barrels)4849
Total Gas Produced (MCF)59471
GOR12264
GOR DeterminationBOE
Average BOE per Day41.978
Average MCFE per Day243.453

 Federal Financial Assurance  i 

 Tribal Well  i No