|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 4/28/2023 Measured TD: 11472 ft. Vertical TD: 6928 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 4/28/2023 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 1/20/2016 | Prop Depth/Form: | 11404 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: GWA | Casing: | String Type: CONDUCTOR, Hole Size: 18.5 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 0 , Citings Type: PLANNED | Cement: | Sacks: 6, Top: 0 ft., Bottom: 100 ft. | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 590 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 290, Top: 0 ft., Bottom: 590 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7351 ft., Weight: 26 , Citings Type: PLANNED | Cement: | Sacks: 500, Top: , Bottom: 7351 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7201 ft., Depth: 11482 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: , Top: , Bottom: |
| | |
Wellbore Completed | Completion Date: | 6/23/2014 | Spud Date: | 6/17/2014 | Spud Date Is: | ACTUAL | Measured TD: | 11472 ft. | Measured PB depth: | 11406 ft. | True Vertical TD: | 6928 ft. | True Vertical PB depth: | 6926 ft. | Top PZ Location: | Sec:15 Twp: 6N 65W | Footage: 859 FSL 172 FEL | Depth | Bottom Hole Location: | Sec:15 Twp: 6N 65W | Footage: 536 FNL 150 FEL | Depth | Log Types: | CBL/Mud/Gamma | Casing: | String Type: CONDUCTOR, Hole Size: , Size: , Top: 0 ft., Depth: 96 ft., Weight: 42 , Citings Type: ACTUAL | Cement: | Sacks: 48, Top: 0 ft., Bottom: 96 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 655 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 375, Top: 0 ft., Bottom: 655 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: , Top: 0 ft., Depth: 7335 ft., Weight: 26 , Citings Type: ACTUAL | Cement: | Sacks: 604, Top: 1050 ft., Bottom: 7335 ft., Determination Method: CBL | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 7241 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: , Determination Method: | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7223 ft., Depth: 11462 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: , Determination Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | PIERRE | 1058 ft. | | | | PARKMAN | 3659 ft. | | | | SUSSEX | 4190 ft. | | | | SHANNON | 5017 ft. | | | | NIOBRARA | 6908 ft. | | | |
Formation NBRR Formation Classification: OW Status: AB - 4/28/2023 Interval Top: 7472 ft. Interval Bottom: 11396 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 9/21/2014 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 8/26/2014 | Treatment End Date: | 8/27/2014 | Treatment Summary: | Frac'd the Niobrara w/ 3380086 gals of Silverstim and Slick Water with 4473540#'s of Ottawa sand. | Total fluid used in treatment (bbls): | 80478 | Max pressure during treatment (psi): | 6171 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | Type Of gas: | | Number Of staged intervals: | 21 | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.96 | Recycled water used in treatment (bbls): | 4575 | Total flowback volume recovered (bbls): | 150 | Fresh water used in treatment (bbls): | 75902 | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 4473540 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 837 | BBLS_OIL | 309 | BTU_GAS | 1280 | CALC_BBLS_H2O | 837 | CALC_BBLS_OIL | 309 | CALC_GOR | 1323 | CALC_MCF_GAS | 409 | CASING_PRESS | 1863 | GRAVITY_OIL | 41 | MCF_GAS | 409 | TUBING_PRESS | 1234 |
| Perforation Data: | Interval Top: | 7472 ft. | # Of Holes: | 21 | Interval Bottom: | 11396 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|