|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 10/1/2025 Measured TD: 10368 ft. Vertical TD: 6102 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 10/1/2025 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 1/19/2016 | | Proposed Top PZ Location: | Sec:28 Twp: 9N 59W | Footage: 765 FSL 1317 FWL | | Bottom Hole Location: | Sec:28 Twp: 9N 59W | Footage: 675 FNL 1320 FWL | | Proposed Depth/Form: | 10207 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 535-376 , Unit Acreage: 1920, Drill Unit: S.20,28,&29:All | | Casing: | String Type: CONDUCTOR, Hole Size: 18.5 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 6, Top: 0 ft., Bottom: 100 ft. | | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 550 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 270, Top: 0 ft., Bottom: 550 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6455 ft., Weight: 26 , Citings Type: PLANNED | | Cement: | Sacks: 440, Top: , Bottom: 6455 ft. | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6305 ft., Depth: 10347 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 9/2/2014 | | Spud Date: | 8/28/2014 | Spud Date Is: | ACTUAL | | Measured TD: | 10368 ft. | Measured PB depth: | 10368 ft. | | True Vertical TD: | 6102 ft. | True Vertical PB depth: | 6102 ft. | | Top PZ Location: | Sec:28 Twp: 9N 59W | Footage: 905 FSL 1310 FWL | | Bottom Hole Location: | Sec:28 Twp: 9N 59W | Footage: 682 FNL 1317 FWL | | Log Types: | USIT, MUD, GR/RESISTIVITY | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 130 ft., Weight: 42.09 , Citings Type: ACTUAL | | Cement: | Sacks: 80, Top: 0 ft., Bottom: 130 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 596 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 335, Top: 0 ft., Bottom: 596 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6475 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 576, Top: 880 ft., Bottom: 6475 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6373 ft., Depth: 10353 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PIERRE | 2500 ft. | | | | | PARKMAN | 3530 ft. | | | | | SUSSEX | 4218 ft. | | | | | SHANNON | 4529 ft. | | | | | TEEPEE BUTTES | 5323 ft. | | | | | NIOBRARA | 6108 ft. | | | |
Formation NBRR Formation Classification: OW Status: PR - 10/1/2025 Interval Top: 6610 ft. Interval Bottom: 10272 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 11/29/2014 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | Yes |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 11/2/2014 | Treatment End Date: | 11/5/2014 | | Treatment Summary: | FRAC'D W/2655010 GALS SILVERSTIM AND SLICK WATER AND 3355653# OTTAWA SAND | | Total fluid used in treatment (bbls): | 63214 | Max pressure during treatment (psi): | 4940 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 19 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.79 | | Recycled water used in treatment (bbls): | 3731 | Total flowback volume recovered (bbls): | 11357 | | Fresh water used in treatment (bbls): | 59483 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 3355653 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6381 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/7/2014 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 825 | | BBLS_OIL | 192 | | BTU_GAS | 1324 | | CALC_BBLS_H2O | 825 | | CALC_BBLS_OIL | 192 | | CALC_GOR | 458 | | CALC_MCF_GAS | 88 | | CASING_PRESS | 982 | | GRAVITY_OIL | 40 | | MCF_GAS | 88 | | TUBING_PRESS | 516 |
| | Perforation Data: | | Interval Top: | 6610 ft. | # Of Holes: | | | Interval Bottom: | 10272 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 429 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | BOE |
| Average BOE per Day | 1.167 |
| Average MCFE per Day | 6.770 |
| Federal Financial Assurance | i | |
|
|