|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 11/1/2020 Measured TD: 10339 ft. Vertical TD: 6043 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 11/1/2020 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 1/19/2016 | Proposed Top PZ Location: | Sec:28 Twp: 9N 59W | Footage: 765 FSL 987 FWL | Bottom Hole Location: | Sec:28 Twp: 9N 59W | Footage: 675 FNL 990 FWL | Proposed Depth/Form: | 9760 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 535-376 , Unit Acreage: 1920, Drill Unit: S.20,28,&29:All | Casing: | String Type: CONDUCTOR, Hole Size: 18.5 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: , Citings Type: PLANNED | Cement: | Sacks: 6, Top: 0 ft., Bottom: 100 ft. | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 550 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 270, Top: 0 ft., Bottom: 550 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6429 ft., Weight: 26 , Citings Type: PLANNED | Cement: | Sacks: 440, Top: , Bottom: 6429 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6279 ft., Depth: 10322 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: , Top: , Bottom: |
| | |
Wellbore Completed | Completion Date: | 8/26/2014 | Spud Date: | 8/21/2014 | Spud Date Is: | ACTUAL | Measured TD: | 10339 ft. | Measured PB depth: | 10339 ft. | True Vertical TD: | 6043 ft. | True Vertical PB depth: | 6043 ft. | Top PZ Location: | Sec:28 Twp: 9N 59W | Footage: 844 FSL 973 FWL | Bottom Hole Location: | Sec:28 Twp: 9N 59W | Footage: 675 FNL 997 FWL | Log Types: | USIT, MUD, GR | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 130 ft., Weight: 42.09 , Citings Type: ACTUAL | Cement: | Sacks: 80, Top: 0 ft., Bottom: 130 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 630 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 314, Top: 0 ft., Bottom: 630 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6432 ft., Weight: 26 , Citings Type: ACTUAL | Cement: | Sacks: 531, Top: 890 ft., Bottom: 6432 ft., Determination Method: CBL | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6321 ft., Depth: 10324 ft., Weight: 11.5 , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: , Determination Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | PIERRE | 2515 ft. | | | | PARKMAN | 3442 ft. | | | | SUSSEX | 4225 ft. | | | | SHANNON | 4548 ft. | | | | TEEPEE BUTTES | 5367 ft. | | | | NIOBRARA | 6234 ft. | | | |
Formation NBRR Formation Classification: OW Status: PR - 11/1/2020 Interval Top: 6560 ft. Interval Bottom: 10244 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 12/6/2014 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 11/5/2014 | Treatment End Date: | 11/6/2014 | Treatment Summary: | FRAC'D 19 STAGES W/2444920 GALS SILVERSTIM AND SLICK WATER AND 3346742# OTTAWA SAND | Total fluid used in treatment (bbls): | 58212 | Max pressure during treatment (psi): | 5836 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | Type Of gas: | | Number Of staged intervals: | 19 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.78 | Recycled water used in treatment (bbls): | 5069 | Total flowback volume recovered (bbls): | 11809 | Fresh water used in treatment (bbls): | 53143 | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 3346742 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6333 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 12/9/2014 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 595 | BBLS_OIL | 334 | BTU_GAS | 1291 | CALC_BBLS_H2O | 595 | CALC_BBLS_OIL | 334 | CALC_GOR | 443 | CALC_MCF_GAS | 148 | CASING_PRESS | 914 | GRAVITY_OIL | 41 | MCF_GAS | 148 | TUBING_PRESS | 322 |
| Perforation Data: | Interval Top: | 6560 ft. | # Of Holes: | | Interval Bottom: | 10244 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 1857 |
Total Gas Produced (MCF) | 21713 |
GOR | 11692 |
GOR Determination | BOE |
Average BOE per Day | 15.314 |
Average MCFE per Day | 88.842 |
Federal Financial Assurance | i | |
|
|