|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 6/1/2024 Measured TD: 15519 ft. Vertical TD: 6094 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 6/1/2024 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 1/9/2016 | Prop Depth/Form: | 15646 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 535-376 , Unit Acreage: 1920, Drill Unit: Sec. 20, 28, 29: All | Casing: | String Type: CONDUCTOR, Hole Size: 18.5 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 0 , Citings Type: PLANNED | Cement: | Sacks: 6, Top: 0 ft., Bottom: 100 ft. | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 550 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 270, Top: 0 ft., Bottom: 550 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6601 ft., Weight: 26 , Citings Type: PLANNED | Cement: | Sacks: 450, Top: 0 ft., Bottom: 6601 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6451 ft., Depth: 15646 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: , Top: , Bottom: |
| | |
Wellbore Completed | Completion Date: | 4/23/2014 | Spud Date: | 4/7/2014 | Spud Date Is: | ACTUAL | Measured TD: | 15519 ft. | Measured PB depth: | 15519 ft. | True Vertical TD: | 6094 ft. | True Vertical PB depth: | 6094 ft. | Top PZ Location: | Sec:29 Twp: 9N 59W | Footage: 985 FSL 1614 FWL | Depth | Bottom Hole Location: | Sec:20 Twp: 9N 59W | Footage: 675 FNL 1653 FWL | Depth | Log Types: | USIT, MUD, GR | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 130 ft., Weight: 42.09 , Citings Type: ACTUAL | Cement: | Sacks: 80, Top: 0 ft., Bottom: 130 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 607 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 282, Top: 0 ft., Bottom: 607 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6503 ft., Weight: 26 , Citings Type: ACTUAL | Cement: | Sacks: 531, Top: 1538 ft., Bottom: 6503 ft., Determination Method: CBL | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6363 ft., Depth: 15504 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: , Determination Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | PIERRE | 2426 ft. | | N | N | PARKMAN | 3329 ft. | | N | N | SUSSEX | 4070 ft. | | N | N | SHANNON | 4532 ft. | | N | N | TEEPEE BUTTES | 5325 ft. | | N | N | NIOBRARA | 6238 ft. | | N | N |
Formation NBRR Formation Classification: OW Status: SI - 6/1/2024 Interval Top: 6581 ft. Interval Bottom: 15420 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 8/27/2014 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 7/11/2014 | Treatment End Date: | 7/17/2014 | Treatment Summary: | 7/14/2014 PERF'D 6581-7706'. FRAC'D W/6255148 GALS SOLVERSTIM AND SLICK WATER AND 8323914# OTTAWA SAND | Total fluid used in treatment (bbls): | 148932 | Max pressure during treatment (psi): | 7673 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | Type Of gas: | | Number Of staged intervals: | 45 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.78 | Recycled water used in treatment (bbls): | 19091 | Total flowback volume recovered (bbls): | 9401 | Fresh water used in treatment (bbls): | 129841 | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 8323914 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6290 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 9/5/2014 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 807 | BBLS_OIL | 78 | BTU_GAS | 1265 | CALC_BBLS_H2O | 807 | CALC_BBLS_OIL | 78 | CALC_GOR | 705 | CALC_MCF_GAS | 55 | CASING_PRESS | 927 | GRAVITY_OIL | 40 | MCF_GAS | 55 | TUBING_PRESS | 502 |
| Perforation Data: | Interval Top: | 6581 ft. | # Of Holes: | 168 | Interval Bottom: | 15420 ft. | Hole Size: | 0.72 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | Y | Production Period 08/2023 - 07/2024 |
Total Oil Produced (Barrels) | 108 |
Total Gas Produced (MCF) | 388 |
GOR | 3592 |
GOR Determination | BOE |
Average BOE per Day | 0.470 |
Average MCFE per Day | 2.728 |
Federal Financial Assurance | i | |
|
|