Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-38744
Well Classification: OW Status: PR - 4/1/2018
Well Name/No:Horsetail #30F-1945
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:FUNDARE RESOURCES OPERATING COMPANY LLC - 10773
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/1/2018
FacilityID:435695LocationID:435694
County:WELD #123Location:SENW 30 10N57W 6
Field:DJ HORIZONTAL NIOBRARA - #16950Elevation:4782 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2323FNL  1980 FWLLat/Long: 40.810683 / -103.796247Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.810687 / -103.796247Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/23/2015
End Date: 3/2/2015
Reported: 3/17/2015
Days to report: 15
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 4/1/2018             Measured TD: 13647 ft.    Vertical TD: 5552 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 4/1/2018
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:12/29/2015
Proposed Top PZ Location:Sec:30 Twp: 10N 57W Footage: 1495 FNL  2023 FWL
Bottom Hole Location:Sec:19 Twp: 10N 57W Footage: 100 FNL  1980 FWL
Proposed Depth/Form:12517 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 535-369 , Unit Acreage: 960, Drill Unit: S.19:ALL,S.30:N/2
Casing:String Type: CONDUCTOR, Hole Size: 16.063 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 65 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1550 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 689, Top: 0 ft., Bottom: 1550 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 5821 ft., Weight: 29 , Citings Type: PLANNED
Cement:Sacks: 391, Top: 0 ft., Bottom: 5821 ft.
Casing:String Type: 1ST LINER, Hole Size: 6 in., Size: 4.5 in., Top: 5039 ft., Depth: 12517 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:9/17/2014
Spud Date:9/8/2014Spud Date Is:ACTUAL
Measured TD:13647 ft.Measured PB depth:13588 ft.
True Vertical TD:5552 ft.True Vertical PB depth:5553 ft.
Top PZ Location:Sec:30 Twp: 10N 57WFootage: 2327 FNL  1919 FWL
Bottom Hole Location:Sec:19 Twp: 10N 57WFootage: 41 FNL  1970 FWL
Log Types:LWD, Mud, CBL, TRIPLE COMBO, CALIPER, Density-Porosity, DENSITY, INDUCTION, GAMMA
Casing:String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 97 ft., Weight: 84 , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 97 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1577 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 461, Top: 0 ft., Bottom: 1577 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6016 ft., Weight: 29 , Citings Type: ACTUAL
Cement:Sacks: 794, Top: 0 ft., Bottom: 6016 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 4880 ft., Depth: 13630 ft., Weight: 11.60 , Citings Type: ACTUAL
Cement:Sacks: 582, Top: 4880 ft., Bottom: 13630 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
PIERRE1435 ft.NN
HYGIENE3182 ft.NN
SHARON SPRINGS5524 ft.NN
NIOBRARA5527 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 4/1/2018                  Interval Top: 6039 ft.    Interval Bottom: 13497 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/31/2015Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/23/2015Treatment End Date:3/2/2015
Treatment Summary:Cemented Liner 40 staged intervals: 84747 bbl pHaserFrac 22 XL Gel; 13137 bbl 22# Linear Gel; 214 bbl 15% HCl; 26736 bbl SlickWater; 7341 bbl Fresh Water. 6691566# Proppant Ottawa 20/40; 115672# Proppant Ottawa 40/70 See attached wellbore diagram for details.
Total fluid used in treatment (bbls):132175Max pressure during treatment (psi):6897
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:40
Total acid used in treatment (bbls):214Min frac gradient (psi/ft):0.81
Recycled water used in treatment (bbls):124620Total flowback volume recovered (bbls):18489
Fresh water used in treatment (bbls):7341Disposition method For flowback:DISPOSAL
Total proppant used (lbs):6807238Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:5540 ft.
Tubing Packer Depth:5526 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/6/2015Test Method:Separator
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 359
BBLS_OIL 593
BTU_GAS 1320
CALC_BBLS_H2O 359
CALC_BBLS_OIL 593
CALC_GOR 445
CALC_MCF_GAS 264
CASING_PRESS 900
GRAVITY_OIL 33
MCF_GAS 264
TUBING_PRESS 450
Perforation Data:
Interval Top:6039 ft.# Of Holes:1440
Interval Bottom:13497 ft.Hole Size:0.4285714 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
September 2024 - August 2025i
Total Oil Produced (Barrels)2328
Total Gas Produced (MCF)15500
GOR6658
GOR DeterminationBOE
Average BOE per Day13.682
Average MCFE per Day79.348

 Federal Financial Assurance  i 

 Tribal Well  i No