Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-38608
Well Classification: OW Status: PR - 11/1/2018
Well Name/No:NRC #3N-4HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/1/2018
FacilityID:435427LocationID:435425
County:WELD #123Location:SESW 9 1N67W 6
Field:WATTENBERG - #90750Elevation:5053 ft.
Planned Location:350FSL  1950 FWLLat/Long: 40.059228 / -104.898127Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.059241 / -104.898128Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/26/2014
End Date: 10/13/2014
Reported: 11/17/2014
Days to report: 35
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 11/1/2018             Measured TD: 17000 ft.    Vertical TD: 7459 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 11/1/2018
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:12/12/2015
Proposed Top PZ Location:Sec:9 Twp: 1N 67W Footage: 460 FSL  1850 FWL
Bottom Hole Location:Sec:4 Twp: 1N 67W Footage: 460 FNL  1850 FWL
Proposed Depth/Form:17574 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1000 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 380, Top: 0 ft., Bottom: 1000 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7823 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 830, Top: 0 ft., Bottom: 7823 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6823 ft., Depth: 17574 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 650, Top: 6823 ft., Bottom: 10848 ft.

Wellbore Completed
Completion Date:2/27/2014
Spud Date:1/24/2014Spud Date Is:ACTUAL
Measured TD:17000 ft.Measured PB depth:16896 ft.
True Vertical TD:7459 ft.True Vertical PB depth:7461 ft.
Top PZ Location:Sec:9 Twp: 1N 67WFootage: 1001 FSL  1846 FWL
Bottom Hole Location:Sec:4 Twp: 1N 67WFootage: 479 N  1865 W
Log Types:CBL, GR, MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1081 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 175, Top: 0 ft., Bottom: 1081 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7799 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 800, Top: 77 ft., Bottom: 7799 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6771 ft., Depth: 16990 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 678, Top: 6771 ft., Bottom: 16990 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SUSSEX4729 ft.
SHARON SPRINGS7387 ft.
NIOBRARA7764 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 11/1/2018                 Interval Top: 7818 ft.    Interval Bottom: 16804 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/18/2014Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/26/2014Treatment End Date:10/13/2014
Treatment Summary:"PERF AND FRAC FROM 7818-16,804. 535 BBL ACID, 172,217 BBL SLICKWATER, 8,229 BBL WATER, - 180,981 BBL TOTAL FLUID 221,881# 30/50 OTTAWA/ST. PETERS, 4,759,407# 40/70 GENOA/SAND HILLS, - 4,981,288# TOTAL SAND."
Total fluid used in treatment (bbls):180981Max pressure during treatment (psi):7508
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:45
Total acid used in treatment (bbls):536Min frac gradient (psi/ft):0.73
Recycled water used in treatment (bbls):8770Total flowback volume recovered (bbls):2095
Fresh water used in treatment (bbls):171676Disposition method For flowback:RECYCLE
Total proppant used (lbs):4981288Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/30/2014Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 175
BBLS_OIL 176
BTU_GAS 1215
CALC_BBLS_H2O 175
CALC_BBLS_OIL 176
CALC_GOR 2813
CALC_MCF_GAS 495
CASING_PRESS 1400
GRAVITY_OIL 52
MCF_GAS 495
Perforation Data:
Interval Top:7818 ft.# Of Holes:1032
Interval Bottom:16804 ft.Hole Size:0.46 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)2145
Total Gas Produced (MCF)71850
GOR33496
GOR DeterminationMCFE
Average BOE per Day39.739
Average MCFE per Day230.440

 Federal Financial Assurance  i 

 Tribal Well  i No