Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-38576
Well Classification: OW Status: SI - 1/1/2026
Well Name/No:Wickstrom #6-4
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:STRACHAN EXPLORATION INC - 83130
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date1/1/2026
FacilityID:435305LocationID:435306
County:WELD #123Location:LOT4 6 7N59W 6
Field:CROW - #13600Elevation:4957 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:660FNL  660 FWLLat/Long: 40.609774 / -104.028382Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.609774 / -104.028382Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/9/2014
End Date: 9/9/2014
Reported: 9/18/2014
Days to report: 9
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 1/1/2026             Measured TD: 7100 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 1/1/2026
Wellbore Permit
Permit #: Expiration Date:12/2/2015
Proposed Depth/Form:7100 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: DSND , Formation: D SAND , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 600 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 275, Top: 0 ft., Bottom: 600 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 7100 ft., Weight: 15.5 , Citings Type: PLANNED
Cement:Sacks: 850, Top: 0 ft., Bottom: 7100 ft.

Wellbore Completed
Completion Date:6/3/2014
Spud Date:5/27/2014Spud Date Is:ACTUAL
Measured TD:7100 ft.Measured PB depth:7037 ft.
True Vertical TD:True Vertical PB depth:
Log Types:induction, gamma, CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 624 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 215, Top: 0 ft., Bottom: 624 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 7068 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 255, Top: 5068 ft., Bottom: 7068 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 6974 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 255, Top: 5075 ft., Bottom: 6974 ft., Determination Method: CBL
Casing:String Type: S.C. 1.2, Hole Size: 7.875 in., Size: 5.5 in., Top: 5073 ft., Depth: 5075 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 530, Top: 134 ft., Bottom: 5075 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 134 ft., Depth: 5068 ft., Bottom: 5068 ft., Sacks: 530, Method: DV TOOL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA6095 ft.
FORT HAYS6342 ft.
CODELL6394 ft.
D SAND6840 ft.
J SAND6910 ft.

Formation DSND                     Formation Classification:  OW                     Status:  SI - 1/1/2026                  Interval Top: 6845 ft.    Interval Bottom: 6854 ft.

 Completed Information for Formation D SAND
1st Production Date:9/17/2014Choke Size: 
Formation Name:D SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/9/2014Treatment End Date:9/9/2014
Treatment Summary:4 Stages. 41,700# 20/40 sand, 8,100# 18/40 sand, breakdown = 2220 psi, ISIP = 3500 psi, 10 min = 2630 psi / 15 min = 4300 psi average flow rate = 20 BPM
Total fluid used in treatment (bbls):695Max pressure during treatment (psi):3728
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.60
Type Of gas:Number Of staged intervals:4
Total acid used in treatment (bbls):12Min frac gradient (psi/ft):0.51
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):683Disposition method For flowback:DISPOSAL
Total proppant used (lbs):49800Green completions techniques utilized:--
Reason green techniques Not utilized: PRESSURE
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/17/2014Test Method:Swab
Hours Tested:8Gas Type:WET
Gas Disposal:VENTED
Test TypeMeasure
BBLS_H2O 20
BBLS_OIL 7
BTU_GAS 1370
CALC_BBLS_H2O 60
CALC_BBLS_OIL 21
CALC_GOR 5000
CALC_MCF_GAS 105
CASING_PRESS 120
GRAVITY_OIL 40
MCF_GAS 35
Perforation Data:
Interval Top:6845 ft.# Of Holes:36
Interval Bottom:6854 ft.Hole Size:0.375 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
02/2025 - 01/2026

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)27
Total Gas Produced (MCF)468
GOR17333
GOR DeterminationMCFE
Average BOE per Day0.295
Average MCFE per Day1.721

 Federal Financial Assurance  i 

 Tribal Well  i No