|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 8/1/2022 Measured TD: 7100 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 8/1/2022 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 12/2/2015 | | Proposed Depth/Form: | 7100 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: DSND , Formation: D SAND , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 600 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 275, Top: 0 ft., Bottom: 600 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 7100 ft., Weight: 15.5 , Citings Type: PLANNED | | Cement: | Sacks: 850, Top: 0 ft., Bottom: 7100 ft. |
| | |
| Wellbore Completed | | Completion Date: | 6/3/2014 | | Spud Date: | 5/27/2014 | Spud Date Is: | ACTUAL | | Measured TD: | 7100 ft. | Measured PB depth: | 7037 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | induction, gamma, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 624 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 215, Top: 0 ft., Bottom: 624 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 7068 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 255, Top: 5068 ft., Bottom: 7068 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 6974 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 255, Top: 5075 ft., Bottom: 6974 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.2, Hole Size: 7.875 in., Size: 5.5 in., Top: 5073 ft., Depth: 5075 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 530, Top: 134 ft., Bottom: 5075 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 134 ft., Depth: 5068 ft., Bottom: 5068 ft., Sacks: 530, Method: DV TOOL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 6095 ft. | | | | | FORT HAYS | 6342 ft. | | | | | CODELL | 6394 ft. | | | | | D SAND | 6840 ft. | | | | | J SAND | 6910 ft. | | | |
Formation DSND Formation Classification: OW Status: PR - 8/1/2022 Interval Top: 6845 ft. Interval Bottom: 6854 ft.| Completed Information for Formation D SAND | | 1st Production Date: | 9/17/2014 | Choke Size: | | | Formation Name: | D SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 9/9/2014 | Treatment End Date: | 9/9/2014 | | Treatment Summary: | 4 Stages. 41,700# 20/40 sand, 8,100# 18/40 sand, breakdown = 2220 psi, ISIP = 3500 psi, 10 min = 2630 psi / 15 min = 4300 psi average flow rate = 20 BPM | | Total fluid used in treatment (bbls): | 695 | Max pressure during treatment (psi): | 3728 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.60 | | Type Of gas: | | Number Of staged intervals: | 4 | | Total acid used in treatment (bbls): | 12 | Min frac gradient (psi/ft): | 0.51 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 0 | | Fresh water used in treatment (bbls): | 683 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 49800 | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: PRESSURE |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/17/2014 | Test Method: | Swab | | Hours Tested: | 8 | Gas Type: | WET | | Gas Disposal: | VENTED | |
| Test Type | Measure |
|---|
| BBLS_H2O | 20 | | BBLS_OIL | 7 | | BTU_GAS | 1370 | | CALC_BBLS_H2O | 60 | | CALC_BBLS_OIL | 21 | | CALC_GOR | 5000 | | CALC_MCF_GAS | 105 | | CASING_PRESS | 120 | | GRAVITY_OIL | 40 | | MCF_GAS | 35 |
| | Perforation Data: | | Interval Top: | 6845 ft. | # Of Holes: | 36 | | Interval Bottom: | 6854 ft. | Hole Size: | 0.375 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 32 |
| Total Gas Produced (MCF) | 481 |
| GOR | 15031 |
| GOR Determination | MCFE |
| Average BOE per Day | 0.316 |
| Average MCFE per Day | 1.834 |
| Federal Financial Assurance | i | |
|
|