|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 10/1/2024 Measured TD: 16790 ft. Vertical TD: 6987 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 10/1/2024 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 11/22/2015 | | Proposed Top PZ Location: | Sec:22 Twp: 6N 67W | Footage: 825 FSL 460 FEL | | Bottom Hole Location: | Sec:21 Twp: 6N 67W | Footage: 825 FSL 460 FWL | | Proposed Depth/Form: | 11679 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 640, Drill Unit: GWA | | Casing: | String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 60 ft., Weight: 65 , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 750 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 398, Top: 0 ft., Bottom: 750 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7383 ft., Weight: 26 , Citings Type: PLANNED | | Cement: | Sacks: 698, Top: 3000 ft., Bottom: 7383 ft. | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7183 ft., Depth: 16844 ft., Weight: 13.5 , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 10/3/2014 | | Spud Date: | 8/11/2014 | Spud Date Is: | ACTUAL | | Measured TD: | 16790 ft. | Measured PB depth: | 16786 ft. | | True Vertical TD: | 6987 ft. | True Vertical PB depth: | 6987 ft. | | Top PZ Location: | Sec:22 Twp: 6N 67W | Footage: 833 FSL 602 FEL | | Bottom Hole Location: | Sec:21 Twp: 6N 67W | Footage: 888 FSL 511 FWL | | Log Types: | CBL, Mudlog, GR | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 65 , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 798 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 297, Top: 0 ft., Bottom: 798 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7418 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 729, Top: 733 ft., Bottom: 7418 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7227 ft., Depth: 16786 ft., Weight: 13.5 , Citings Type: ACTUAL | | Cement: | Sacks: 765, Top: 7227 ft., Bottom: 16786 ft., Determination Method: CALC | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3520 ft. | | N | N | | SUSSEX | 4229 ft. | | N | N | | SHANNON | 4557 ft. | | N | N | | SHARON SPRINGS | 6900 ft. | | N | N | | NIOBRARA | 6952 ft. | | N | N |
Formation NBRR Formation Classification: OW Status: PR - 10/1/2024 Interval Top: 7524 ft. Interval Bottom: 16728 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 5/24/2015 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 7/12/2015 | Treatment End Date: | 7/15/2015 | | Treatment Summary: | 26 stage plug and perf; only heel half of lateral completed (7524'-11242'), toe half was completed on an earlier date. 7 hours of flowback before well was turned over to production. | | Total fluid used in treatment (bbls): | 49578 | Max pressure during treatment (psi): | 8272 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.32 | | Type Of gas: | | Number Of staged intervals: | 26 | | Total acid used in treatment (bbls): | 307 | Min frac gradient (psi/ft): | 1.04 | | Recycled water used in treatment (bbls): | 10825 | Total flowback volume recovered (bbls): | 113 | | Fresh water used in treatment (bbls): | 38446 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 5206841 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 4/28/2015 | Treatment End Date: | 5/7/2015 | | Treatment Summary: | 37 stage plug and perf; only toe half of lateral completed (11435'-16728') | | Total fluid used in treatment (bbls): | 92299 | Max pressure during treatment (psi): | 9114 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.32 | | Type Of gas: | | Number Of staged intervals: | 37 | | Total acid used in treatment (bbls): | 133 | Min frac gradient (psi/ft): | 0.95 | | Recycled water used in treatment (bbls): | 20249 | Total flowback volume recovered (bbls): | 3472 | | Fresh water used in treatment (bbls): | 71917 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 7608787 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/26/2015 | Test Method: | | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 987 | | BBLS_OIL | 122 | | BTU_GAS | 1297 | | CALC_BBLS_H2O | 987 | | CALC_BBLS_OIL | 122 | | CALC_GOR | 1098 | | CALC_MCF_GAS | 134 | | CASING_PRESS | 1050 | | GRAVITY_OIL | 43 | | MCF_GAS | 134 | | TUBING_PRESS | 1050 |
| | Perforation Data: | | Interval Top: | 7524 ft. | # Of Holes: | 2268 | | Interval Bottom: | 16728 ft. | Hole Size: | 0.44 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 3920 |
| Total Gas Produced (MCF) | 79045 |
| GOR | 20164 |
| GOR Determination | MCFE |
| Average BOE per Day | 48.121 |
| Average MCFE per Day | 279.111 |
| Federal Financial Assurance | i | |
|
|