|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 6/1/2023 Measured TD: 11540 ft. Vertical TD: 7119 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 6/1/2023 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 11/17/2015 | | Proposed Top PZ Location: | Sec:19 Twp: 3N 68W | Footage: 1891 FNL 745 FWL | | Bottom Hole Location: | Sec:19 Twp: 3N 68W | Footage: 1940 FNL 505 FEL | | Proposed Depth/Form: | 11684 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED | | Cement: | Sacks: 80, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 800 ft., Weight: 40 , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 800 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7469 ft., Weight: 26 , Citings Type: PLANNED | | Cement: | Sacks: 422, Top: 500 ft., Bottom: 7469 ft. | | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11684 ft., Weight: 13.5 , Citings Type: PLANNED | | Cement: | Sacks: 173, Top: 7169 ft., Bottom: 11684 ft. |
| | |
| Wellbore Completed | | Completion Date: | 6/21/2014 | | Spud Date: | 5/2/2014 | Spud Date Is: | ACTUAL | | Measured TD: | 11540 ft. | Measured PB depth: | 11516 ft. | | True Vertical TD: | 7119 ft. | True Vertical PB depth: | 7119 ft. | | Top PZ Location: | Sec:19 Twp: 3N 68W | Footage: 1891 FNL 745 FWL | | Bottom Hole Location: | Sec:19 Twp: 3N 68W | Footage: 1940 FNL 505 FEL | | Log Types: | CBL, MWD, IND & Triple Combo | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 16 in., Top: 0 ft., Depth: 112 ft., Weight: 30 , Citings Type: ACTUAL | | Cement: | Sacks: 114, Top: 0 ft., Bottom: 112 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 869 ft., Weight: 40 , Citings Type: ACTUAL | | Cement: | Sacks: 359, Top: 0 ft., Bottom: 869 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7545 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 654, Top: 820 ft., Bottom: 7545 ft., Determination Method: CBL | | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11540 ft., Weight: 13.5 , Citings Type: ACTUAL | | Cement: | Sacks: 435, Top: 5539 ft., Bottom: 11540 ft., Determination Method: CALC | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SHARON SPRINGS | 6719 ft. | | | | | NIOBRARA | 6848 ft. | | | | | FORT HAYS | 7336 ft. | | | | | CODELL | 7469 ft. | | | |
Formation CODL Formation Classification: OW Status: SI - 6/1/2023 Interval Top: 7541 ft. Interval Bottom: 11466 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 11/14/2014 | Choke Size: | | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 9/8/2014 | Treatment End Date: | 9/13/2014 | | Treatment Summary: | Stage 1-27 treated with 70,500 bbl fresh water and 356 bbl additives, and 5,132,894 lb. 40/70 sand proppant | | Total fluid used in treatment (bbls): | 70856 | Max pressure during treatment (psi): | 7731 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 27 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.89 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 650 | | Fresh water used in treatment (bbls): | 70856 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 5132894 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7152 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/21/2014 | Test Method: | flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 124 | | BBLS_OIL | 73 | | BTU_GAS | 1298 | | CALC_BBLS_H2O | 124 | | CALC_BBLS_OIL | 73 | | CALC_GOR | 2452 | | CALC_MCF_GAS | 179 | | CASING_PRESS | 2118 | | GRAVITY_OIL | 50 | | MCF_GAS | 179 | | TUBING_PRESS | 981 |
| | Perforation Data: | | Interval Top: | 7541 ft. | # Of Holes: | 729 | | Interval Bottom: | 11466 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2028 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI ) | Y | Defined Inactive 05/31/2023 |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|