Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-38348
Well Classification: OW Status: PA - 7/25/2025
Well Name/No:Edith Ann-Duckworth #4B-21H O268
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date7/25/2025
FacilityID:434816LocationID:434300
County:WELD #123Location:SWSE 21 2N68W 6
Field:WATTENBERG - #90750Elevation:4925 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:284FSL  1368 FELLat/Long: 40.117670 / -105.003680Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.117667 / -105.003675Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 10/29/2014
End Date: 11/8/2014
Reported: 12/22/2014
Days to report: 44
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 7/25/2025             Measured TD: 17238 ft.    Vertical TD: 7486 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 7/25/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:10/21/2015
Proposed Top PZ Location:Sec:21 Twp: 2N 68W Footage: 839 FSL  2268 FEL
Bottom Hole Location:Sec:16 Twp: 2N 68W Footage: 460 FNL  2200 FEL
Proposed Depth/Form:17283 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 640, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED
Cement:Sacks: 80, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 800 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 800 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7952 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 451, Top: 500 ft., Bottom: 7952 ft.
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 17282 ft., Weight: 13.5 , Citings Type: PLANNED
Cement:Sacks: 365, Top: 7652 ft., Bottom: 17282 ft.

Wellbore Completed
Completion Date:8/9/2014
Spud Date:3/24/2014Spud Date Is:ACTUAL
Measured TD:17238 ft.Measured PB depth:17123 ft.
True Vertical TD:7486 ft.True Vertical PB depth:7486 ft.
Top PZ Location:Sec:21 Twp: 2N 68WFootage: 819 FSL  2158 FEL
Bottom Hole Location:Sec:16 Twp: 2N 68WFootage: 5247 FNL  2221 FEL
Log Types:CBL, MWD, Resistivty on 05-123-38081.
Casing:String Type: CONDUCTOR, Hole Size: , Size: , Top: 0 ft., Depth: 113 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 110, Top: 0 ft., Bottom: 113 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 897 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 370, Top: 0 ft., Bottom: 907 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: , Top: 0 ft., Depth: 7932 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 670, Top: 1480 ft., Bottom: 7946 ft., Determination Method: CBL
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 17223 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: 750, Top: 6010 ft., Bottom: 17238 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4305 ft.
SHANNON4847 ft.
TEEPEE BUTTES6180 ft.
SHARON SPRINGS7240 ft.
NIOBRARA7340 ft.
FORT HAYS7800 ft.
CODELL7983 ft.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 4/7/2025                  Interval Top: 8003 ft.    Interval Bottom: 17123 ft.

 Completed Information for Formation CODELL
1st Production Date:1/14/2015Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/29/2014Treatment End Date:11/8/2014
Treatment Summary:Codell 8152-17123'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8003 ft.# Of Holes:1611
Interval Bottom:17123 ft.Hole Size:0.38 in.

Formation CD-FH                   Formation Classification:  OW                   Status:  AB - 7/25/2025                 Interval Top: 7957 ft.    Interval Bottom: 17123 ft.

 Completed Information for Formation CODELL-FORT HAYS
1st Production Date:1/14/2015Choke Size: 
Formation Name:CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/29/2014Treatment End Date:11/8/2014
Treatment Summary:Stages 1-51 treated with a total of 126,828 bbls of fresh water, 615 bbls of Slickwater, and 5,529,580 lbs of 40/70 sand proppant.
Total fluid used in treatment (bbls):127443Max pressure during treatment (psi):8628
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:51
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.89
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):3980
Fresh water used in treatment (bbls):126828Disposition method For flowback:DISPOSAL
Total proppant used (lbs):5529580Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_OIL 262
BTU_GAS 1298
CALC_BBLS_OIL 262
CALC_GOR 2126
CALC_MCF_GAS 557
GRAVITY_OIL 50
MCF_GAS 557
Perforation Data:
Interval Top:7957 ft.# Of Holes:1620
Interval Bottom:17123 ft.Hole Size:0.38 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 4/7/2025                  Interval Top: 7957 ft.    Interval Bottom: 7959 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:1/14/2015Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/29/2014Treatment End Date:11/8/2014
Treatment Summary:Fort Hays 7957-8104'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:7957 ft.# Of Holes:9
Interval Bottom:7959 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY07/25/2025
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
02/02/2028
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No