|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 7/25/2025 Measured TD: 17238 ft. Vertical TD: 7486 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 7/25/2025 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 10/21/2015 | | Proposed Top PZ Location: | Sec:21 Twp: 2N 68W | Footage: 839 FSL 2268 FEL | | Bottom Hole Location: | Sec:16 Twp: 2N 68W | Footage: 460 FNL 2200 FEL | | Proposed Depth/Form: | 17283 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 640, Drill Unit: GWA | | Casing: | String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED | | Cement: | Sacks: 80, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 800 ft., Weight: 40 , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 800 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7952 ft., Weight: 26 , Citings Type: PLANNED | | Cement: | Sacks: 451, Top: 500 ft., Bottom: 7952 ft. | | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 17282 ft., Weight: 13.5 , Citings Type: PLANNED | | Cement: | Sacks: 365, Top: 7652 ft., Bottom: 17282 ft. |
| | |
| Wellbore Completed | | Completion Date: | 8/9/2014 | | Spud Date: | 3/24/2014 | Spud Date Is: | ACTUAL | | Measured TD: | 17238 ft. | Measured PB depth: | 17123 ft. | | True Vertical TD: | 7486 ft. | True Vertical PB depth: | 7486 ft. | | Top PZ Location: | Sec:21 Twp: 2N 68W | Footage: 819 FSL 2158 FEL | | Bottom Hole Location: | Sec:16 Twp: 2N 68W | Footage: 5247 FNL 2221 FEL | | Log Types: | CBL, MWD, Resistivty on 05-123-38081. | | Casing: | String Type: CONDUCTOR, Hole Size: , Size: , Top: 0 ft., Depth: 113 ft., Weight: 42 , Citings Type: ACTUAL | | Cement: | Sacks: 110, Top: 0 ft., Bottom: 113 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 897 ft., Weight: 40 , Citings Type: ACTUAL | | Cement: | Sacks: 370, Top: 0 ft., Bottom: 907 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: , Top: 0 ft., Depth: 7932 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 670, Top: 1480 ft., Bottom: 7946 ft., Determination Method: CBL | | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 17223 ft., Weight: 13.5 , Citings Type: ACTUAL | | Cement: | Sacks: 750, Top: 6010 ft., Bottom: 17238 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4305 ft. | | | | | SHANNON | 4847 ft. | | | | | TEEPEE BUTTES | 6180 ft. | | | | | SHARON SPRINGS | 7240 ft. | | | | | NIOBRARA | 7340 ft. | | | | | FORT HAYS | 7800 ft. | | | | | CODELL | 7983 ft. | | | |
Formation CODL Formation Classification: OW Status: CM - 4/7/2025 Interval Top: 8003 ft. Interval Bottom: 17123 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 1/14/2015 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 10/29/2014 | Treatment End Date: | 11/8/2014 | | Treatment Summary: | Codell 8152-17123'. | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 8003 ft. | # Of Holes: | 1611 | | Interval Bottom: | 17123 ft. | Hole Size: | 0.38 in. |
|
Formation CD-FH Formation Classification: OW Status: AB - 7/25/2025 Interval Top: 7957 ft. Interval Bottom: 17123 ft.| Completed Information for Formation CODELL-FORT HAYS | | 1st Production Date: | 1/14/2015 | Choke Size: | | | Formation Name: | CODELL-FORT HAYS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 10/29/2014 | Treatment End Date: | 11/8/2014 | | Treatment Summary: | Stages 1-51 treated with a total of 126,828 bbls of fresh water, 615 bbls of Slickwater, and 5,529,580 lbs of 40/70 sand proppant. | | Total fluid used in treatment (bbls): | 127443 | Max pressure during treatment (psi): | 8628 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 51 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.89 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 3980 | | Fresh water used in treatment (bbls): | 126828 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 5529580 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 262 | | BTU_GAS | 1298 | | CALC_BBLS_OIL | 262 | | CALC_GOR | 2126 | | CALC_MCF_GAS | 557 | | GRAVITY_OIL | 50 | | MCF_GAS | 557 |
| | Perforation Data: | | Interval Top: | 7957 ft. | # Of Holes: | 1620 | | Interval Bottom: | 17123 ft. | Hole Size: | 0.38 in. |
|
Formation FTHYS Formation Classification: OW Status: CM - 4/7/2025 Interval Top: 7957 ft. Interval Bottom: 7959 ft.| Completed Information for Formation FORT HAYS | | 1st Production Date: | 1/14/2015 | Choke Size: | | | Formation Name: | FORT HAYS | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 10/29/2014 | Treatment End Date: | 11/8/2014 | | Treatment Summary: | Fort Hays 7957-8104'. | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation FTHYS. |
| | Perforation Data: | | Interval Top: | 7957 ft. | # Of Holes: | 9 | | Interval Bottom: | 7959 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 07/25/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 02/02/2028 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|