Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-38303
Well Classification: OW Status: PA - 5/19/2025
Well Name/No:Guttersen #31T-441
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date5/19/2025
FacilityID:434735LocationID:434585
County:WELD #123Location:SWSE 31 3N63W 6
Field:WATTENBERG - #90750Elevation:4823 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:75FSL  2119 FELLat/Long: 40.174870 / -104.478500Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.174885 / -104.478471Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/5/2014
End Date: 11/10/2014
Reported: 2/21/2019
Days to report: 1564
Disclosure: Sidetrack #00
Start Date: 11/6/2014
End Date: 11/14/2014
Reported: 11/26/2014
Days to report: 12
Disclosure: Sidetrack #00
Start Date: 11/7/2014
End Date: 11/8/2014
Reported: 12/10/2014
Days to report: 32
Disclosure: Sidetrack #00
Start Date: 11/8/2014
End Date: 11/10/2014
Reported: 12/10/2014
Days to report: 30
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 5/19/2025             Measured TD: 11127 ft.    Vertical TD: 6824 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 5/19/2025
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:10/16/2015
Proposed Top PZ Location:Sec:31 Twp: 3N 63W Footage: 734 FSL  1857 FEL
Bottom Hole Location:Sec:31 Twp: 3N 63W Footage: 500 FNL  1849 FEL
Proposed Depth/Form:11229 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 875 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 830, Top: 0 ft., Bottom: 875 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7376 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 650, Top: 500 ft., Bottom: 7376 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6068 ft., Depth: 11229 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:6/13/2014
Spud Date:6/4/2014Spud Date Is:ACTUAL
Measured TD:11127 ft.Measured PB depth:10909 ft.
True Vertical TD:6824 ft.True Vertical PB depth:6824 ft.
Top PZ Location:Sec:31 Twp: 3N 63WFootage: 737 FSL  1853 FEL
Bottom Hole Location:Sec:31 Twp: 3N 63WFootage: 500 FNL  1843 FEL
Log Types:CBL, MWD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 929 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 830, Top: 0 ft., Bottom: 929 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: , Top: 0 ft., Depth: 7234 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 636, Top: 0 ft., Bottom: 7234 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6913 ft., Depth: 10913 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PARKMAN3598 ft.
SUSSEX4033 ft.
SHARON SPRINGS6436 ft.
NIOBRARA6553 ft.
FORT HAYS7064 ft.
CODELL7077 ft.
CARLILE7396 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 4/23/2019                 Interval Top: 7396 ft.    Interval Bottom: 9867 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:
Treatment Date:4/23/2019Treatment End Date:N/A
Treatment Summary:Completed Depths: 7,396'-7,832' 8,167'-9,867'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:7396 ft.# Of Holes:
Interval Bottom:9867 ft.Hole Size:

Formation CD-CRL                 Formation Classification:  OW                 Status:  AB - 5/19/2025                 Interval Top: 7077 ft.    Interval Bottom: 11127 ft.

 Completed Information for Formation CODELL-CARLILE
1st Production Date:11/28/2014Choke Size: 
Formation Name:CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/5/2014Treatment End Date:11/10/2014
Treatment Summary:15 Stage Sliding Sleeve, Swell Packer set at 7,077' Total Fluid: 70,079 bbls Gel Fluid: 55,882 bbls Slickwater Fluid: 14,197 bbls Total Proppant: 3,615,260 lbs Silican Proppant: 3,615,260 lbs Method for determining flowback: measuring flowback tank volumes.
Total fluid used in treatment (bbls):70079Max pressure during treatment (psi):3889
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:15
Total acid used in treatment (bbls):Min frac gradient (psi/ft):1.00
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):8255
Fresh water used in treatment (bbls):70079Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3615260Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6895 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/6/2014Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 301
BBLS_OIL 244
BTU_GAS 1285
CALC_BBLS_H2O 301
CALC_BBLS_OIL 244
CALC_GOR 1078
CALC_MCF_GAS 263
CASING_PRESS 1277
GRAVITY_OIL 45
MCF_GAS 263
TUBING_PRESS 843
Perforation Data:
Interval Top:7077 ft.# Of Holes:
Interval Bottom:11127 ft.Hole Size:

Formation CODL                     Formation Classification:  OW                     Status:  CM - 4/23/2019                 Interval Top: 7077 ft.    Interval Bottom: 11127 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:
Treatment Date:4/23/2019Treatment End Date:N/A
Treatment Summary:Completed Depths: 7,077'-7,396' 7,832'-8,167' 9,867'-11,127'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7077 ft.# Of Holes:
Interval Bottom:11127 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY05/19/2025
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
03/31/2029
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No