Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-38278
Well Classification: OW Status: SI - 4/1/2023
Well Name/No:Guttersen #31T-401
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date4/1/2023
FacilityID:434638LocationID:434637
County:WELD #123Location:SESE 31 3N63W 6
Field:WATTENBERG - #90750Elevation:4836 ft.
Planned Location:75FSL  489 FELLat/Long: 40.174870 / -104.472670Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.174874 / -104.472627Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 10/31/2014
End Date: 11/1/2014
Reported: 4/29/2019
Days to report: 1640
Disclosure: Sidetrack #00
Start Date: 12/9/2014
End Date: 12/9/2014
Reported: 12/10/2014
Days to report: 1
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 4/1/2023             Measured TD: 11265 ft.    Vertical TD: 6818 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 4/1/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:10/8/2015
Proposed Top PZ Location:Sec:31 Twp: 3N 63W Footage: 734 FSL  1148 FEL
Bottom Hole Location:Sec:31 Twp: 3N 63W Footage: 500 FNL  1140 FEL
Proposed Depth/Form:11262 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 875 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 830, Top: 0 ft., Bottom: 875 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7420 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 650, Top: 500 ft., Bottom: 7420 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6104 ft., Depth: 11262 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:3/13/2014
Spud Date:3/2/2014Spud Date Is:ACTUAL
Measured TD:11265 ft.Measured PB depth:11257 ft.
True Vertical TD:6818 ft.True Vertical PB depth:6818 ft.
Top PZ Location:Sec:31 Twp: 3N 63WFootage: 877 FSL  1157 FEL
Bottom Hole Location:Sec:31 Twp: 3N 63WFootage: 506 N  1155 E
Log Types:MWD, CBL, DIL
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 923 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 830, Top: 0 ft., Bottom: 935 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7315 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 639, Top: 470 ft., Bottom: 7315 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7197 ft., Depth: 11261 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PARKMAN3770 ft.
SUSSEX4261 ft.
SHARON SPRINGS6426 ft.
NIOBRARA6642 ft.
FORT HAYS7120 ft.
CODELL7193 ft.
CARLILE7361 ft.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 5/2/2019                  Interval Top: 9975 ft.    Interval Bottom: 11265 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:
Treatment Date:5/2/2019Treatment End Date:N/A
Treatment Summary:Completed Depths: 9,975'-10,337' 10,630'-11,265'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:9975 ft.# Of Holes:
Interval Bottom:11265 ft.Hole Size:

Formation CODL                     Formation Classification:  OW                     Status:  CM - 5/2/2019                  Interval Top: 7999 ft.    Interval Bottom: 9975 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:
Treatment Date:5/2/2019Treatment End Date:N/A
Treatment Summary:Completed Depths: 7,999'-9,975'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7999 ft.# Of Holes:
Interval Bottom:9975 ft.Hole Size:

Formation CARL                     Formation Classification:  OW                     Status:  CM - 5/2/2019                  Interval Top: 7361 ft.    Interval Bottom: 10630 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:
Treatment Date:5/2/2019Treatment End Date:N/A
Treatment Summary:Completed Depths: 7,361'-7,999' 10,337'-10,630'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:7361 ft.# Of Holes:
Interval Bottom:10630 ft.Hole Size:

Formation CLCDFH                 Formation Classification:  OW                 Status:  SI - 4/1/2023                  Interval Top: 7361 ft.    Interval Bottom: 11265 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:11/17/2014Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/31/2014Treatment End Date:11/1/2014
Treatment Summary:16 Sliding Sleeve, Swell Packer set @ 7,361' Total Fluid: 66,017 bbls Gel Fluid: 47,515 bbls Slickwater Fluid: 18,502 bbls Total Proppant: 3,679,410 lbs Silica Proppant: 3,679,410 lbs Method for determining flowback: measuring flowback tank volumes.
Total fluid used in treatment (bbls):66017Max pressure during treatment (psi):3604
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:16
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.96
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):5561
Fresh water used in treatment (bbls):66017Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3679410Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6887 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/2/2014Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 194
BBLS_OIL 238
BTU_GAS 1284
CALC_BBLS_H2O 194
CALC_BBLS_OIL 238
CALC_GOR 1151
CALC_MCF_GAS 274
CASING_PRESS 1089
GRAVITY_OIL 44
MCF_GAS 274
TUBING_PRESS 730
Perforation Data:
Interval Top:7361 ft.# Of Holes:
Interval Bottom:11265 ft.Hole Size:
Primary Well Designation:
Noticed Inactive      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveYNoticed Date
07/26/2024
Defined Inactive (SI )YDefined Inactive
03/31/2023
Low ProducingYProduction Period
12/2023 - 11/2024

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No