|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 4/1/2023 Measured TD: 11265 ft. Vertical TD: 6818 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 4/1/2023 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 10/8/2015 | Proposed Top PZ Location: | Sec:31 Twp: 3N 63W | Footage: 734 FSL 1148 FEL | Bottom Hole Location: | Sec:31 Twp: 3N 63W | Footage: 500 FNL 1140 FEL | Proposed Depth/Form: | 11262 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 875 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 830, Top: 0 ft., Bottom: 875 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7420 ft., Weight: 26 , Citings Type: PLANNED | Cement: | Sacks: 650, Top: 500 ft., Bottom: 7420 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6104 ft., Depth: 11262 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: , Top: , Bottom: |
| | |
Wellbore Completed | Completion Date: | 3/13/2014 | Spud Date: | 3/2/2014 | Spud Date Is: | ACTUAL | Measured TD: | 11265 ft. | Measured PB depth: | 11257 ft. | True Vertical TD: | 6818 ft. | True Vertical PB depth: | 6818 ft. | Top PZ Location: | Sec:31 Twp: 3N 63W | Footage: 877 FSL 1157 FEL | Bottom Hole Location: | Sec:31 Twp: 3N 63W | Footage: 506 N 1155 E | Log Types: | MWD, CBL, DIL | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 923 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 830, Top: 0 ft., Bottom: 935 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7315 ft., Weight: 26 , Citings Type: ACTUAL | Cement: | Sacks: 639, Top: 470 ft., Bottom: 7315 ft., Determination Method: CBL | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7197 ft., Depth: 11261 ft., Weight: 13.5 , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: , Determination Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 3770 ft. | | | | SUSSEX | 4261 ft. | | | | SHARON SPRINGS | 6426 ft. | | | | NIOBRARA | 6642 ft. | | | | FORT HAYS | 7120 ft. | | | | CODELL | 7193 ft. | | | | CARLILE | 7361 ft. | | | |
Formation FTHYS Formation Classification: OW Status: CM - 5/2/2019 Interval Top: 9975 ft. Interval Bottom: 11265 ft. Completed Information for Formation FORT HAYS | 1st Production Date: | N/A | Choke Size: | | Formation Name: | FORT HAYS | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Type: | | Treatment Date: | 5/2/2019 | Treatment End Date: | N/A | Treatment Summary: | Completed Depths: 9,975'-10,337' 10,630'-11,265' | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation FTHYS. |
| Perforation Data: | Interval Top: | 9975 ft. | # Of Holes: | | Interval Bottom: | 11265 ft. | Hole Size: | |
|
Formation CODL Formation Classification: OW Status: CM - 5/2/2019 Interval Top: 7999 ft. Interval Bottom: 9975 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Type: | | Treatment Date: | 5/2/2019 | Treatment End Date: | N/A | Treatment Summary: | Completed Depths: 7,999'-9,975' | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7999 ft. | # Of Holes: | | Interval Bottom: | 9975 ft. | Hole Size: | |
|
Formation CARL Formation Classification: OW Status: CM - 5/2/2019 Interval Top: 7361 ft. Interval Bottom: 10630 ft. Completed Information for Formation CARLILE | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CARLILE | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Type: | | Treatment Date: | 5/2/2019 | Treatment End Date: | N/A | Treatment Summary: | Completed Depths: 7,361'-7,999' 10,337'-10,630' | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CARL. |
| Perforation Data: | Interval Top: | 7361 ft. | # Of Holes: | | Interval Bottom: | 10630 ft. | Hole Size: | |
|
Formation CLCDFH Formation Classification: OW Status: SI - 4/1/2023 Interval Top: 7361 ft. Interval Bottom: 11265 ft. Completed Information for Formation CARLILE-CODELL-FORT HAYS | 1st Production Date: | 11/17/2014 | Choke Size: | | Formation Name: | CARLILE-CODELL-FORT HAYS | Commingled: | No | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 10/31/2014 | Treatment End Date: | 11/1/2014 | Treatment Summary: | 16 Sliding Sleeve, Swell Packer set @ 7,361'
Total Fluid: 66,017 bbls
Gel Fluid: 47,515 bbls
Slickwater Fluid: 18,502 bbls
Total Proppant: 3,679,410 lbs
Silica Proppant: 3,679,410 lbs
Method for determining flowback: measuring flowback tank volumes. | Total fluid used in treatment (bbls): | 66017 | Max pressure during treatment (psi): | 3604 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | 16 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.96 | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 5561 | Fresh water used in treatment (bbls): | 66017 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 3679410 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6887 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 12/2/2014 | Test Method: | Flowing | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 194 | BBLS_OIL | 238 | BTU_GAS | 1284 | CALC_BBLS_H2O | 194 | CALC_BBLS_OIL | 238 | CALC_GOR | 1151 | CALC_MCF_GAS | 274 | CASING_PRESS | 1089 | GRAVITY_OIL | 44 | MCF_GAS | 274 | TUBING_PRESS | 730 |
| Perforation Data: | Interval Top: | 7361 ft. | # Of Holes: | | Interval Bottom: | 11265 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | Y | Noticed Date 07/26/2024 |
Defined Inactive (SI ) | Y | Defined Inactive 03/31/2023 |
Low Producing | Y | Production Period 12/2023 - 11/2024 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|