Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-38268
Well Classification: OW Status: PR - 12/1/2025
Well Name/No:HWY 52 #4B-32H-O268
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/1/2025
FacilityID:434579LocationID:434554
Municipality/County:FREDERICK / WELD #123Location:SWSE 32 2N68W 6
Field:WATTENBERG - #90750Elevation:4992 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:598FSL  2114 FELLat/Long: 40.089356 / -105.025250Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.089356 / -105.025249Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/23/2018
End Date: 3/26/2018
Reported: 4/11/2018
Days to report: 16
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 12/1/2025             Measured TD: 13560 ft.    Vertical TD: 7763 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 12/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:4/21/2018
Proposed Top PZ Location:Sec:32 Twp: 2N 68W Footage: 580 FSL  2282 FEL
Bottom Hole Location:Sec:5 Twp: 1N 68W Footage: 465 FSL  2347 FEL
Proposed Depth/Form:13023 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CD-FH , Formation: CODELL-FORT HAYS , Order: , Unit Acreage: 400, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED
Cement:Sacks: 80, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1687 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 736, Top: 0 ft., Bottom: 1687 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 13612 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2220, Top: , Bottom: 13612 ft.

Wellbore Completed
Completion Date:5/10/2017
Spud Date:3/28/2017Spud Date Is:ACTUAL
Measured TD:13560 ft.Measured PB depth:13481 ft.
True Vertical TD:7763 ft.True Vertical PB depth:7764 ft.
Top PZ Location:Sec:32 Twp: 2N 68WFootage: 580 FSL  2282 FEL
Bottom Hole Location:Sec:5 Twp: 1N 68WFootage: 465 FSL  2347 FEL
Log Types:Mud, MWD/LWD, CBL, (Resistivity in 123-38246)
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 16 in., Top: 0 ft., Depth: 112 ft., Weight: 65 , Citings Type: ACTUAL
Cement:Sacks: 190, Top: 0 ft., Bottom: 112 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1677 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 636, Top: 0 ft., Bottom: 1677 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 13530 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 1920, Top: 1690 ft., Bottom: 13530 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4329 ft.
SHANNON4987 ft.
SHARON SPRINGS7312 ft.
NIOBRARA7422 ft.
FORT HAYS7971 ft.
CODELL8141 ft.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 10/23/2018                Interval Top: 8141 ft.    Interval Bottom: 13430 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/23/2018Treatment End Date:N/A
Treatment Summary:8141'-8890', 11339'-13429'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8141 ft.# Of Holes:433
Interval Bottom:13430 ft.Hole Size:

Formation CD-FH                   Formation Classification:  OW                   Status:  PR - 12/1/2025                 Interval Top: 8082 ft.    Interval Bottom: 13429 ft.

 Completed Information for Formation CODELL-FORT HAYS
1st Production Date:7/4/2018Choke Size:14.000 in.
Formation Name:CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/23/2018Treatment End Date:3/26/2018
Treatment Summary:121795 bbl water, 15 bbls produced brine water and 91 bbl additives (FRP-4K) in a 19 stage frac with 3,205,740 lbs of silica quartz proppant
Total fluid used in treatment (bbls):121901Max pressure during treatment (psi):8525
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:19
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.86
Recycled water used in treatment (bbls):15Total flowback volume recovered (bbls):4650
Fresh water used in treatment (bbls):121795Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3205740Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7769 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/3/2018Test Method:flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 205
BBLS_OIL 328
BTU_GAS 1257
CALC_BBLS_H2O 205
CALC_BBLS_OIL 328
CALC_GOR 1591
CALC_MCF_GAS 522
CASING_PRESS 2552
GRAVITY_OIL 45
MCF_GAS 522
TUBING_PRESS 1501
Perforation Data:
Interval Top:8082 ft.# Of Holes:433
Interval Bottom:13429 ft.Hole Size:0.42 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 10/23/2018                Interval Top: 8082 ft.    Interval Bottom: 11290 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/23/2018Treatment End Date:N/A
Treatment Summary:8082'-8140', 8939'-11290'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8082 ft.# Of Holes:433
Interval Bottom:11290 ft.Hole Size:
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)20
GOR
GOR DeterminationMCFE
Average BOE per Day0.011
Average MCFE per Day0.056

 Federal Financial Assurance  i 

 Tribal Well  i No