|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 12/1/2025 Measured TD: 13560 ft. Vertical TD: 7763 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 12/1/2025 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 4/21/2018 | | Proposed Top PZ Location: | Sec:32 Twp: 2N 68W | Footage: 580 FSL 2282 FEL | | Bottom Hole Location: | Sec:5 Twp: 1N 68W | Footage: 465 FSL 2347 FEL | | Proposed Depth/Form: | 13023 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CD-FH , Formation: CODELL-FORT HAYS , Order: , Unit Acreage: 400, Drill Unit: GWA | | Casing: | String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED | | Cement: | Sacks: 80, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1687 ft., Weight: 40 , Citings Type: PLANNED | | Cement: | Sacks: 736, Top: 0 ft., Bottom: 1687 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 13612 ft., Weight: 20 , Citings Type: PLANNED | | Cement: | Sacks: 2220, Top: , Bottom: 13612 ft. |
| | |
| Wellbore Completed | | Completion Date: | 5/10/2017 | | Spud Date: | 3/28/2017 | Spud Date Is: | ACTUAL | | Measured TD: | 13560 ft. | Measured PB depth: | 13481 ft. | | True Vertical TD: | 7763 ft. | True Vertical PB depth: | 7764 ft. | | Top PZ Location: | Sec:32 Twp: 2N 68W | Footage: 580 FSL 2282 FEL | | Bottom Hole Location: | Sec:5 Twp: 1N 68W | Footage: 465 FSL 2347 FEL | | Log Types: | Mud, MWD/LWD, CBL, (Resistivity in 123-38246) | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 16 in., Top: 0 ft., Depth: 112 ft., Weight: 65 , Citings Type: ACTUAL | | Cement: | Sacks: 190, Top: 0 ft., Bottom: 112 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1677 ft., Weight: 40 , Citings Type: ACTUAL | | Cement: | Sacks: 636, Top: 0 ft., Bottom: 1677 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 13530 ft., Weight: 20 , Citings Type: ACTUAL | | Cement: | Sacks: 1920, Top: 1690 ft., Bottom: 13530 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4329 ft. | | | | | SHANNON | 4987 ft. | | | | | SHARON SPRINGS | 7312 ft. | | | | | NIOBRARA | 7422 ft. | | | | | FORT HAYS | 7971 ft. | | | | | CODELL | 8141 ft. | | | |
Formation CODL Formation Classification: OW Status: CM - 10/23/2018 Interval Top: 8141 ft. Interval Bottom: 13430 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 10/23/2018 | Treatment End Date: | N/A | | Treatment Summary: | 8141'-8890', 11339'-13429' | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 8141 ft. | # Of Holes: | 433 | | Interval Bottom: | 13430 ft. | Hole Size: | |
|
Formation CD-FH Formation Classification: OW Status: PR - 12/1/2025 Interval Top: 8082 ft. Interval Bottom: 13429 ft.| Completed Information for Formation CODELL-FORT HAYS | | 1st Production Date: | 7/4/2018 | Choke Size: | 14.000 in. | | Formation Name: | CODELL-FORT HAYS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 3/23/2018 | Treatment End Date: | 3/26/2018 | | Treatment Summary: | 121795 bbl water, 15 bbls produced brine water and 91 bbl additives (FRP-4K) in a 19 stage frac with 3,205,740 lbs of silica quartz proppant
| | Total fluid used in treatment (bbls): | 121901 | Max pressure during treatment (psi): | 8525 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.33 | | Type Of gas: | | Number Of staged intervals: | 19 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.86 | | Recycled water used in treatment (bbls): | 15 | Total flowback volume recovered (bbls): | 4650 | | Fresh water used in treatment (bbls): | 121795 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 3205740 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7769 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/3/2018 | Test Method: | flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 205 | | BBLS_OIL | 328 | | BTU_GAS | 1257 | | CALC_BBLS_H2O | 205 | | CALC_BBLS_OIL | 328 | | CALC_GOR | 1591 | | CALC_MCF_GAS | 522 | | CASING_PRESS | 2552 | | GRAVITY_OIL | 45 | | MCF_GAS | 522 | | TUBING_PRESS | 1501 |
| | Perforation Data: | | Interval Top: | 8082 ft. | # Of Holes: | 433 | | Interval Bottom: | 13429 ft. | Hole Size: | 0.42 in. |
|
Formation FTHYS Formation Classification: OW Status: CM - 10/23/2018 Interval Top: 8082 ft. Interval Bottom: 11290 ft.| Completed Information for Formation FORT HAYS | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | FORT HAYS | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 10/23/2018 | Treatment End Date: | N/A | | Treatment Summary: | 8082'-8140', 8939'-11290'
| | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation FTHYS. |
| | Perforation Data: | | Interval Top: | 8082 ft. | # Of Holes: | 433 | | Interval Bottom: | 11290 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 20 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.011 |
| Average MCFE per Day | 0.056 |
| Federal Financial Assurance | i | |
|
|