Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-38268
Well Classification: OW Status: PR - 3/1/2026
Well Name/No:HWY 52 #4B-32H-O268
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/1/2026
FacilityID:434579LocationID:434554
Municipality/County:FREDERICK / WELD #123Location:SWSE 32 2N68W 6
Field:WATTENBERG - #90750Elevation:4992 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:598FSL  2114 FELLat/Long: 40.089356 / -105.025250Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.089356 / -105.025249Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/23/2018
End Date: 3/26/2018
Reported: 4/11/2018
Days to report: 16
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 3/1/2026             Measured TD: 13560 ft.    Vertical TD: 7763 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 3/1/2026
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:4/21/2018
Proposed Top PZ Location:Sec:32 Twp: 2N 68W Footage: 580 FSL  2282 FEL
Bottom Hole Location:Sec:5 Twp: 1N 68W Footage: 465 FSL  2347 FEL
Proposed Depth/Form:13023 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CD-FH , Formation: CODELL-FORT HAYS , Order: , Unit Acreage: 400, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED
Cement:Sacks: 80, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1687 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 736, Top: 0 ft., Bottom: 1687 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 13612 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2220, Top: , Bottom: 13612 ft.

Wellbore Completed
Completion Date:5/10/2017
Spud Date:3/28/2017Spud Date Is:ACTUAL
Measured TD:13560 ft.Measured PB depth:13481 ft.
True Vertical TD:7763 ft.True Vertical PB depth:7764 ft.
Top PZ Location:Sec:32 Twp: 2N 68WFootage: 580 FSL  2282 FEL
Bottom Hole Location:Sec:5 Twp: 1N 68WFootage: 465 FSL  2347 FEL
Log Types:Mud, MWD/LWD, CBL, (Resistivity in 123-38246)
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 16 in., Top: 0 ft., Depth: 112 ft., Weight: 65 , Citings Type: ACTUAL
Cement:Sacks: 190, Top: 0 ft., Bottom: 112 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1677 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 636, Top: 0 ft., Bottom: 1677 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 13530 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 1920, Top: 1690 ft., Bottom: 13530 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4329 ft.
SHANNON4987 ft.
SHARON SPRINGS7312 ft.
NIOBRARA7422 ft.
FORT HAYS7971 ft.
CODELL8141 ft.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 10/23/2018                Interval Top: 8141 ft.    Interval Bottom: 13430 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/23/2018Treatment End Date:N/A
Treatment Summary:8141'-8890', 11339'-13429'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8141 ft.# Of Holes:433
Interval Bottom:13430 ft.Hole Size:

Formation CD-FH                   Formation Classification:  OW                   Status:  PR - 3/1/2026                  Interval Top: 8082 ft.    Interval Bottom: 13429 ft.

 Completed Information for Formation CODELL-FORT HAYS
1st Production Date:7/4/2018Choke Size:14.000 in.
Formation Name:CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/23/2018Treatment End Date:3/26/2018
Treatment Summary:121795 bbl water, 15 bbls produced brine water and 91 bbl additives (FRP-4K) in a 19 stage frac with 3,205,740 lbs of silica quartz proppant
Total fluid used in treatment (bbls):121901Max pressure during treatment (psi):8525
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:19
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.86
Recycled water used in treatment (bbls):15Total flowback volume recovered (bbls):4650
Fresh water used in treatment (bbls):121795Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3205740Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7769 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/3/2018Test Method:flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 205
BBLS_OIL 328
BTU_GAS 1257
CALC_BBLS_H2O 205
CALC_BBLS_OIL 328
CALC_GOR 1591
CALC_MCF_GAS 522
CASING_PRESS 2552
GRAVITY_OIL 45
MCF_GAS 522
TUBING_PRESS 1501
Perforation Data:
Interval Top:8082 ft.# Of Holes:433
Interval Bottom:13429 ft.Hole Size:0.42 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 10/23/2018                Interval Top: 8082 ft.    Interval Bottom: 11290 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/23/2018Treatment End Date:N/A
Treatment Summary:8082'-8140', 8939'-11290'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8082 ft.# Of Holes:433
Interval Bottom:11290 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
03/2025 - 02/2026

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
March 2025 - February 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)24
GOR
GOR DeterminationMCFE
Average BOE per Day0.014
Average MCFE per Day0.066

 Federal Financial Assurance  i 

 Tribal Well  i No