|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 9/1/2018 Measured TD: 7926 ft. Vertical TD: 6950 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 9/1/2018 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 10/2/2015 | | Proposed Top PZ Location: | Sec:10 Twp: 2N 64W | Footage: 2104 FNL 75 FWL | | Bottom Hole Location: | Sec:3 Twp: 2N 64W | Footage: 75 FNL 75 FWL | | Proposed Depth/Form: | 14607 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 556, Drill Unit: GWA | | Casing: | String Type: CONDUCTOR, Hole Size: 18.5 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 6, Top: 0 ft., Bottom: 100 ft. | | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 1100 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 500, Top: 0 ft., Bottom: 1100 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7334 ft., Weight: 26 , Citings Type: PLANNED | | Cement: | Sacks: 500, Top: , Bottom: 7334 ft. | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7184 ft., Depth: 14607 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 3/30/2014 | | Spud Date: | 3/29/2014 | Spud Date Is: | ACTUAL | | Measured TD: | 7926 ft. | Measured PB depth: | 7926 ft. | | True Vertical TD: | 6950 ft. | True Vertical PB depth: | 6950 ft. | | Bottom Hole Location: | Sec:10 Twp: 2N 64W | Footage: 1992 FNL 47 FWL | | Log Types: | Logs will be submitted on the Oscar Y 10-79HNX sidetrack form 5. | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 130 ft., Weight: 42.05 , Citings Type: ACTUAL | | Cement: | Sacks: 88, Top: 0 ft., Bottom: 130 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 1154 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 489, Top: 0 ft., Bottom: 1154 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7352 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 598, Top: 895 ft., Bottom: 7352 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PIERRE | 1371 ft. | | | | | PARKMAN | 4006 ft. | | | | | SUSSEX | 4371 ft. | | | | | SHANNON | 5140 ft. | | | | | NIOBRARA | 6941 ft. | | | | | No formation data to display. |
Sidetrack #01 Wellbore Classification: OW Status: SI - 11/1/2023 Measured TD: 14611 ft. Vertical TD: 7005 ft.| Wellbore Data for Sidetrack #01 | Wellbore Classification: OW SI - 11/1/2023 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 4/6/2016 | | Proposed Top PZ Location: | Sec:10 Twp: 2N 64W | Footage: 2104 FNL 75 FWL | | Bottom Hole Location: | Sec:3 Twp: 2N 64W | Footage: 75 FNL 75 FWL | | Proposed Depth/Form: | 14607 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 556, Drill Unit: GWA | | Casing: | String Type: CONDUCTOR, Hole Size: 18.5 in., Size: 16 in., Top: 0 ft., Depth: 130 ft., Weight: 42 , Citings Type: PLANNED | | Cement: | Sacks: 6, Top: 0 ft., Bottom: 130 ft. | | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 1154 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 500, Top: 0 ft., Bottom: 1154 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7352 ft., Weight: 26 , Citings Type: PLANNED | | Cement: | Sacks: 500, Top: 0 ft., Bottom: 7352 ft. | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7499 ft., Depth: 14607 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 4/11/2014 | | Spud Date: | 3/29/2014 | Spud Date Is: | ACTUAL | | Measured TD: | 14611 ft. | Measured PB depth: | 14611 ft. | | True Vertical TD: | 7005 ft. | True Vertical PB depth: | 7005 ft. | | Top PZ Location: | Sec:10 Twp: 2N 64W | Footage: 1992 FNL 47 FWL | | Bottom Hole Location: | Sec:3 Twp: 2N 64W | Footage: 6 FNL 15 FWL | | Log Types: | CBL/Mud/Gamma | | Casing: | String Type: CONDUCTOR, Hole Size: , Size: , Top: 0 ft., Depth: 130 ft., Weight: 42.05 , Citings Type: ACTUAL | | Cement: | Sacks: 88, Top: 0 ft., Bottom: 130 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 1154 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 489, Top: 0 ft., Bottom: 1154 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: , Top: 0 ft., Depth: 7352 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 598, Top: 895 ft., Bottom: 7352 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7206 ft., Depth: 14606 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PIERRE | 1371 ft. | | | | | PARKMAN | 4006 ft. | | | | | SUSSEX | 4371 ft. | | | | | SHANNON | 5140 ft. | | | | | NIOBRARA | 6941 ft. | | | |
Formation NBRR Formation Classification: OW Status: SI - 11/1/2023 Interval Top: 7479 ft. Interval Bottom: 14507 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 6/23/2014 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 5/24/2014 | Treatment End Date: | 5/27/2014 | | Treatment Summary: | Frac'd the Niobrara w/ 5865347 gals of Silverstim and Slick Water with 7488140#'s of Ottawa sand. | | Total fluid used in treatment (bbls): | 139651 | Max pressure during treatment (psi): | 8210 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 37 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.98 | | Recycled water used in treatment (bbls): | 7908 | Total flowback volume recovered (bbls): | 324 | | Fresh water used in treatment (bbls): | 131743 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 7488140 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 7167 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/1/2014 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 913 | | BBLS_OIL | 421 | | BTU_GAS | 1462 | | CALC_BBLS_H2O | 913 | | CALC_BBLS_OIL | 421 | | CALC_GOR | 1128 | | CALC_MCF_GAS | 475 | | CASING_PRESS | 2325 | | GRAVITY_OIL | 42 | | MCF_GAS | 475 | | TUBING_PRESS | 1301 |
| | Perforation Data: | | Interval Top: | 7479 ft. | # Of Holes: | 0 | | Interval Bottom: | 14507 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 03/31/2029 |
| Inactive Exception | N | |
| Noticed Inactive | Y | Noticed Date 02/25/2025 |
| Defined Inactive (SI ) | Y | Defined Inactive 10/31/2023 |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|