|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 12/10/2017 Measured TD: 17105 ft. Vertical TD: 7654 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 12/10/2017 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 11/15/2017 | Prop Depth/Form: | 14922 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 640, Drill Unit: GWA | Casing: | String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 400 ft., Weight: 30 , Citings Type: PLANNED | Cement: | Sacks: 350, Top: 0 ft., Bottom: 400 ft. | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2085 ft., Weight: 40 , Citings Type: PLANNED | Cement: | Sacks: 573, Top: 0 ft., Bottom: 2085 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: , Top: 0 ft., Depth: 17067 ft., Weight: 2 , Citings Type: PLANNED | Cement: | Sacks: 2705, Top: , Bottom: 17067 ft. | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 14921 ft., Weight: 13.5 , Citings Type: PLANNED | Cement: | Sacks: 266, Top: 7921 ft., Bottom: 14921 ft. |
| | |
Wellbore Completed | Completion Date: | 5/23/2017 | Spud Date: | 4/24/2017 | Spud Date Is: | ACTUAL | Measured TD: | 17105 ft. | Measured PB depth: | 17066 ft. | True Vertical TD: | 7654 ft. | True Vertical PB depth: | 7657 ft. | Top PZ Location: | Sec:29 Twp: 1N 68W | Footage: 950 FSL 223 FWL | Depth | Bottom Hole Location: | Sec:20 Twp: 1N 68W | Footage: 467 FNL 202 FWL | Depth | Log Types: | MWD, Mud, CBL, CAL, (Pulsed Neutron in 123-38129) | Casing: | String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 401 ft., Weight: 54.5 , Citings Type: ACTUAL | Cement: | Sacks: 301, Top: 0 ft., Bottom: 401 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2146 ft., Weight: 40 , Citings Type: ACTUAL | Cement: | Sacks: 511, Top: 0 ft., Bottom: 2146 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 17081 ft., Weight: 20 , Citings Type: ACTUAL | Cement: | Sacks: 2873, Top: 0 ft., Bottom: 17081 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4747 ft. | | | | SHANNON | 5414 ft. | | | | TEEPEE BUTTES | 7020 ft. | | | | SHARON SPRINGS | 7728 ft. | | | | NIOBRARA | 7774 ft. | | | |
Formation NBRR Formation Classification: OW Status: PR - 12/10/2017 Interval Top: 7973 ft. Interval Bottom: 16991 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 11/6/2017 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 9/11/2017 | Treatment End Date: | 9/24/2017 | Treatment Summary: | 355052 bbl water, 283 bbl additives (FRP-4K, ACI-97 and ASF-67) and 48 bbl HCl in a
48 stage frac with 8097500 lb of silica quartz proppant | Total fluid used in treatment (bbls): | 355383 | Max pressure during treatment (psi): | 8971 | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | Type Of gas: | | Number Of staged intervals: | 48 | Total acid used in treatment (bbls): | 48 | Min frac gradient (psi/ft): | 0.83 | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 3616 | Fresh water used in treatment (bbls): | 355052 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 8097500 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7949 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 12/10/2017 | Test Method: | flowing | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 623 | BBLS_OIL | 500 | BTU_GAS | 1231 | CALC_BBLS_H2O | 623 | CALC_BBLS_OIL | 500 | CALC_GOR | 2106 | CALC_MCF_GAS | 1053 | CASING_PRESS | 2400 | GRAVITY_OIL | 48 | MCF_GAS | 1053 | TUBING_PRESS | 1950 |
| Perforation Data: | Interval Top: | 7973 ft. | # Of Holes: | 1116 | Interval Bottom: | 16991 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 12708 |
Total Gas Produced (MCF) | 131434 |
GOR | 10342 |
GOR Determination | BOE |
Average BOE per Day | 96.641 |
Average MCFE per Day | 560.505 |
Federal Financial Assurance | i | |
|
|