Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-38121
Well Classification: OW Status: PR - 1/7/2019
Well Name/No:Waste Connections #3B-29H-M168
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/7/2019
FacilityID:434369LocationID:434375
Municipality/County:ERIE / WELD #123Location:NWSW 29 1N68W 6
Field:WATTENBERG - #90750Elevation:5148 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1509FSL  1311 FWLLat/Long: 40.018904 / -105.032230Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.018906 / -105.032229Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/24/2017
End Date: 10/27/2017
Reported: 11/14/2017
Days to report: 18
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 1/7/2019             Measured TD: 17140 ft.    Vertical TD: 7918 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 1/7/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:11/15/2017
Proposed Top PZ Location:Sec:29 Twp: 1N 68@ Footage: 950 FSL  490 FEL
Bottom Hole Location:Sec:20 Twp: 1N 68W Footage: 464 FNL  575 FEL
Proposed Depth/Form:17093 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBFHC , Formation: NIOBRARA-FT HAYS-CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 350 ft., Weight: 54.4 , Citings Type: PLANNED
Cement:Sacks: 320, Top: 0 ft., Bottom: 350 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2077 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 571, Top: 0 ft., Bottom: 2077 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 17125 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2715, Top: , Bottom: 17125 ft.
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 17093 ft., Weight: 13.5 , Citings Type: PLANNED
Cement:Sacks: 340, Top: 8133 ft., Bottom: 17093 ft.

Wellbore Completed
Completion Date:6/7/2017
Spud Date:4/26/2017Spud Date Is:ACTUAL
Measured TD:17140 ft.Measured PB depth:16877 ft.
True Vertical TD:7918 ft.True Vertical PB depth:7921 ft.
Top PZ Location:Sec:29 Twp: 1N 68@Footage: 950 FSL  490 FEL
Bottom Hole Location:Sec:20 Twp: 1N 68WFootage: 464 FNL  575 FEL
Log Types:MWD, Mud, CBL, (Pulsed Neutron Log in 123-38129)
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 421 ft., Weight: 55 , Citings Type: ACTUAL
Cement:Sacks: 302, Top: 0 ft., Bottom: 421 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2087 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 549, Top: 0 ft., Bottom: 2087 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 16894 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 3330, Top: 2980 ft., Bottom: 16894 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4785 ft.
SHANNON5365 ft.
TEEPEE BUTTES6959 ft.
SHARON SPRINGS7635 ft.
NIOBRARA7679 ft.
FORT HAYS8277 ft.
CODELL8633 ft.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 11/2/2018                 Interval Top: 8633 ft.    Interval Bottom: 16853 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:11/2/2018Treatment End Date:N/A
Treatment Summary:Perfs at: 8633-11633; 12085-15409; 16801-16853
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8633 ft.# Of Holes:728
Interval Bottom:16853 ft.Hole Size:

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 11/2/2018                 Interval Top: 8277 ft.    Interval Bottom: 16800 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:11/2/2018Treatment End Date:N/A
Treatment Summary:Perfs at: 8277-8632; 11634-12084; 15410-16800
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8277 ft.# Of Holes:728
Interval Bottom:16800 ft.Hole Size:

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 11/2/2018                 Interval Top: 8249 ft.    Interval Bottom: 8276 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:11/2/2018Treatment End Date:N/A
Treatment Summary:Perfs at 8249-8276
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:8249 ft.# Of Holes:728
Interval Bottom:8276 ft.Hole Size:

Formation NBFHC                   Formation Classification:  OW                   Status:  PR - 1/7/2019                  Interval Top: 7947 ft.    Interval Bottom: 16853 ft.

 Completed Information for Formation NIOBRARA-FT HAYS-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-FT HAYS-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:9/24/2017Treatment End Date:10/27/2017
Treatment Summary:Corrected treatment date(s).
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 678
BBLS_OIL 487
BTU_GAS 1250
CALC_BBLS_H2O 678
CALC_BBLS_OIL 487
CALC_GOR 2117
CALC_MCF_GAS 1031
CASING_PRESS 3000
GRAVITY_OIL 48
MCF_GAS 1031
TUBING_PRESS 2300
Perforation Data:
Interval Top:7947 ft.# Of Holes:728
Interval Bottom:16853 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)15326
Total Gas Produced (MCF)157903
GOR10302
GOR DeterminationBOE
Average BOE per Day116.560
Average MCFE per Day676.057

 Federal Financial Assurance  i 

 Tribal Well  i No