Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-38111
Well Classification: OW Status: PR - 1/7/2019
Well Name/No:Woolley Becky #2A-7H-E168
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/7/2019
FacilityID:434340LocationID:305447
County:WELD #123Location:SWNW 7 1N68W 6
Field:WATTENBERG - #90750Elevation:4994 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2242FNL  559 FWLLat/Long: 40.066854 / -105.053469Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.066854 / -105.053470Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/25/2017
End Date: 6/4/2017
Reported: 11/14/2017
Originally Reported: 11/13/2017
Days to report: 163
Days to report: 162
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 1/7/2019             Measured TD: 14830 ft.    Vertical TD: 7615 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 1/7/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:11/4/2017
Proposed Top PZ Location:Sec:7 Twp: 1N 68W Footage: 2100 FNL  158 FWL
Bottom Hole Location:Sec:6 Twp: 1N 68W Footage: 484 FNL  42 FWL
Proposed Depth/Form:14682 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NB-FH , Formation: NIOBRARA-FT HAYS , Order: , Unit Acreage: 480, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED
Cement:Sacks: 80, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1753 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 674, Top: 0 ft., Bottom: 1753 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 14989 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2295, Top: , Bottom: 14989 ft.
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 14682 ft., Weight: 13.5 , Citings Type: PLANNED
Cement:Sacks: 263, Top: 7781 ft., Bottom: 14682 ft.

Wellbore Completed
Completion Date:11/29/2016
Spud Date:10/29/2016Spud Date Is:ACTUAL
Measured TD:14830 ft.Measured PB depth:14762 ft.
True Vertical TD:7615 ft.True Vertical PB depth:7621 ft.
Top PZ Location:Sec:7 Twp: 1N 68WFootage: 2100 FNL  158 FWL
Bottom Hole Location:Sec:6 Twp: 1N 68WFootage: 484 FNL  42 FWL
Log Types:CBL, MWD, Mud, Triple Combination
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 98 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 114, Top: 0 ft., Bottom: 98 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1788 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 835, Top: 0 ft., Bottom: 1788 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 14816 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2495, Top: 0 ft., Bottom: 14816 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4469 ft.NN
SHANNON5043 ft.NN
TEEPEE BUTTES6581 ft.NN
SHARON SPRINGS7383 ft.NN
NIOBRARA7445 ft.NN
FORT HAYS8142 ft.NN

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 10/4/2018                 Interval Top: 8142 ft.    Interval Bottom: 14462 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/4/2018Treatment End Date:N/A
Treatment Summary:Perfs: 8142-11522, 11600-14462
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8142 ft.# Of Holes:576
Interval Bottom:14462 ft.Hole Size:0.41 in.

Formation NB-FH                   Formation Classification:  OW                   Status:  PR - 1/7/2019                  Interval Top: 7903 ft.    Interval Bottom: 14713 ft.

 Completed Information for Formation NIOBRARA-FT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-FT HAYSCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:5/25/2017Treatment End Date:6/4/2017
Treatment Summary:Corrected treatment date(s).
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/6/2017Treatment End Date:6/4/2017
Treatment Summary:164267 bbl water, 159 bbl additives (FRP-4K, ACI-97 and ASF-67) and 60 bbl HCl in a 25 stage frac with 4149114 lb of silica quartz proppant
Total fluid used in treatment (bbls):164486Max pressure during treatment (psi):8384
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:25
Total acid used in treatment (bbls):60Min frac gradient (psi/ft):0.76
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):8681
Fresh water used in treatment (bbls):164267Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4149114Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 308
BBLS_OIL 441
BTU_GAS 1298
CALC_BBLS_H2O 308
CALC_BBLS_OIL 441
CALC_GOR 1664
CALC_MCF_GAS 734
CASING_PRESS 2613
GRAVITY_OIL 50
MCF_GAS 734
TUBING_PRESS 2000
Perforation Data:
Interval Top:7903 ft.# Of Holes:576
Interval Bottom:14713 ft.Hole Size:0.41 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 10/4/2018                 Interval Top: 7903 ft.    Interval Bottom: 14713 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/4/2018Treatment End Date:N/A
Treatment Summary:Perfs: 7903-8141, 11523-11550, 14463-14713
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7903 ft.# Of Holes:576
Interval Bottom:14713 ft.Hole Size:0.41 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)7472
Total Gas Produced (MCF)80291
GOR10745
GOR DeterminationBOE
Average BOE per Day58.356
Average MCFE per Day338.469

 Federal Financial Assurance  i 

 Tribal Well  i No