Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-38104
Well Classification: OW Status: PR - 1/7/2019
Well Name/No:Woolley Sosa #2A-7H-E168
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/7/2019
FacilityID:434333LocationID:305447
County:WELD #123Location:SWNW 7 1N68W 6
Field:WATTENBERG - #90750Elevation:4994 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2242FNL  506 FWLLat/Long: 40.066855 / -105.053657Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.066855 / -105.053657Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/19/2017
End Date: 6/30/2017
Reported: 11/15/2017
Days to report: 138
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 1/7/2019             Measured TD: 15880 ft.    Vertical TD: 7787 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 1/7/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:11/4/2017
Proposed Top PZ Location:Sec:7 Twp: 1N 68W Footage: 2100 FNL  82 FWL
Bottom Hole Location:Sec:18 Twp: 1N 68W Footage: 506 FSL  111 FWL
Proposed Depth/Form:15949 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBFHC , Formation: NIOBRARA-FT HAYS-CODELL , Order: , Unit Acreage: 560, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED
Cement:Sacks: 80, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1755 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 674, Top: 0 ft., Bottom: 1755 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 15950 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 3773, Top: , Bottom: 15950 ft.
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 15949 ft., Weight: 13.5 , Citings Type: PLANNED
Cement:Sacks: 310, Top: 7786 ft., Bottom: 15949 ft.

Wellbore Completed
Completion Date:4/1/2017
Spud Date:10/18/2016Spud Date Is:ACTUAL
Measured TD:15880 ft.Measured PB depth:15815 ft.
True Vertical TD:7787 ft.True Vertical PB depth:7787 ft.
Top PZ Location:Sec:7 Twp: 1N 68WFootage: 2100 FNL  82 FWL
Bottom Hole Location:Sec:18 Twp: 1N 68WFootage: 506 FSL  111 FWL
Log Types:MWD, Mud, CBL, (Triple Combo in 123-38111)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 98 ft., Weight: 55 , Citings Type: ACTUAL
Cement:Sacks: 114, Top: 0 ft., Bottom: 98 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1805 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 835, Top: 0 ft., Bottom: 1805 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 15860 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2343, Top: 0 ft., Bottom: 15860 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4492 ft.NN
SHANNON5064 ft.NN
TEEPEE BUTTES6600 ft.NN
SHARON SPRINGS7399 ft.NN
NIOBRARA7458 ft.NN
FORT HAYS8172 ft.NN
CODELL8373 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 10/4/2018                 Interval Top: 8726 ft.    Interval Bottom: 15768 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/4/2018Treatment End Date:N/A
Treatment Summary:Perfs: 8373-9384, 11166-11801, 11966-12532, 15014-15768
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8726 ft.# Of Holes:654
Interval Bottom:15768 ft.Hole Size:0.41 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 10/4/2018                 Interval Top: 8173 ft.    Interval Bottom: 15013 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/4/2018Treatment End Date:N/A
Treatment Summary:Perfs: 8172-8372, 9385-11117, 11801-11965, 12533-15013
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8173 ft.# Of Holes:654
Interval Bottom:15013 ft.Hole Size:0.41 in.

Formation NBFHC                   Formation Classification:  OW                   Status:  PR - 1/7/2019                  Interval Top: 7841 ft.    Interval Bottom: 15768 ft.

 Completed Information for Formation NIOBRARA-FT HAYS-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-FT HAYS-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:6/19/2017Treatment End Date:6/30/2017
Treatment Summary:Corrected treatment date(s).
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/7/2017Treatment End Date:6/30/2017
Treatment Summary:188140 bbl water, 162 bbl additives (FRP-4K, ACI-97 and ASF-67) and 48 bbl HCl in a 28 stage frac with 4778545 lb of silica quartz proppant
Total fluid used in treatment (bbls):188350Max pressure during treatment (psi):7952
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:28
Total acid used in treatment (bbls):48Min frac gradient (psi/ft):0.87
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):8296
Fresh water used in treatment (bbls):188140Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4778545Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 286
BBLS_OIL 289
BTU_GAS 1298
CALC_BBLS_H2O 286
CALC_BBLS_OIL 289
CALC_GOR 3159
CALC_MCF_GAS 913
CASING_PRESS 2200
GRAVITY_OIL 50
MCF_GAS 913
Perforation Data:
Interval Top:7841 ft.# Of Holes:654
Interval Bottom:15768 ft.Hole Size:0.41 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 10/4/2018                 Interval Top: 7841 ft.    Interval Bottom: 8171 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/4/2018Treatment End Date:N/A
Treatment Summary:Perfs: 7841-8171
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7841 ft.# Of Holes:654
Interval Bottom:8171 ft.Hole Size:0.41 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)9880
Total Gas Produced (MCF)68432
GOR6926
GOR DeterminationBOE
Average BOE per Day59.380
Average MCFE per Day344.422

 Federal Financial Assurance  i 

 Tribal Well  i No