|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 8/1/2020 Measured TD: 12691 ft. Vertical TD: 6891 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 8/1/2020 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 9/18/2015 | Prop Depth/Form: | 12721 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 400, Drill Unit: GWA | Casing: | String Type: CONDUCTOR, Hole Size: 18.5 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: , Citings Type: PLANNED | Cement: | Sacks: 6, Top: 0 ft., Bottom: 100 ft. | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 590 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 290, Top: 0 ft., Bottom: 590 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7329 ft., Weight: 26 , Citings Type: PLANNED | Cement: | Sacks: 500, Top: 0 ft., Bottom: 7329 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7179 ft., Depth: 12721 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: , Top: 0 ft., Bottom: |
| | |
Wellbore Completed | Completion Date: | 7/2/2014 | Spud Date: | 6/22/2014 | Spud Date Is: | ACTUAL | Measured TD: | 12691 ft. | Measured PB depth: | 12691 ft. | True Vertical TD: | 6891 ft. | True Vertical PB depth: | 6891 ft. | Top PZ Location: | Sec:14 Twp: 6N 65W | Footage: 1669 FSL 788 FWL | Depth | Bottom Hole Location: | Sec:13 Twp: 6N 65W | Footage: 1650 FSL 783 FWL | Depth | Log Types: | USIT, MUD, GR/INDUCTION | Casing: | String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 16 in., Top: 0 ft., Depth: 130 ft., Weight: 42.05 , Citings Type: ACTUAL | Cement: | Sacks: 88, Top: 0 ft., Bottom: 130 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 637 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 321, Top: 0 ft., Bottom: 637 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7246 ft., Weight: 26 , Citings Type: ACTUAL | Cement: | Sacks: 605, Top: 307 ft., Bottom: 7246 ft., Determination Method: CBL | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7131 ft., Depth: 12676 ft., Weight: 11.60 , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: , Determination Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | PIERRE | 999 ft. | | | | PARKMAN | 3676 ft. | | | | SUSSEX | 4223 ft. | | | | SHANNON | 5043 ft. | | | | TEEPEE BUTTES | 6086 ft. | | | | NIOBRARA | 6965 ft. | | | |
Formation NBRR Formation Classification: OW Status: PR - 8/1/2020 Interval Top: 7377 ft. Interval Bottom: 12599 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 9/25/2014 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 8/30/2014 | Treatment End Date: | 9/4/2014 | Treatment Summary: | FRAC'D W/4639291 GALS SILVERSTIMAND SLICK WATER AND 5859500# OTTAWA SAND | Total fluid used in treatment (bbls): | 110459 | Max pressure during treatment (psi): | 6618 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | Type Of gas: | | Number Of staged intervals: | 27 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 1.00 | Recycled water used in treatment (bbls): | 6356 | Total flowback volume recovered (bbls): | 9108 | Fresh water used in treatment (bbls): | 104103 | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 5859500 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7096 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 10/8/2014 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 123 | BBLS_OIL | 253 | BTU_GAS | 1301 | CALC_BBLS_H2O | 123 | CALC_BBLS_OIL | 253 | CALC_GOR | 1588 | CALC_MCF_GAS | 402 | CASING_PRESS | 2190 | GRAVITY_OIL | 41 | MCF_GAS | 402 | TUBING_PRESS | 1450 |
| Perforation Data: | Interval Top: | 7377 ft. | # Of Holes: | 0 | Interval Bottom: | 12599 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 4287 |
Total Gas Produced (MCF) | 83976 |
GOR | 19588 |
GOR Determination | MCFE |
Average BOE per Day | 51.270 |
Average MCFE per Day | 297.337 |
Federal Financial Assurance | i | |
|
|