Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-38085
Well Classification: OW Status: PR - 12/1/2024
Well Name/No:Edith Ann-Duckworth #4H-21H O268
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/1/2024
FacilityID:434305LocationID:434300
County:WELD #123Location:SESE 21 2N68W 6
Field:WATTENBERG - #90750Elevation:4927 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:283FSL  1296 FELLat/Long: 40.117670 / -105.003420Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.117667 / -105.003417Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/19/2014
End Date: 11/26/2014
Reported: 1/5/2015
Days to report: 40
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 12/1/2024             Measured TD: 17064 ft.    Vertical TD: 7485 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 12/1/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:9/17/2015
Proposed Top PZ Location:Sec:22 Twp: 2N 68W Footage: 913 FSL  145 FWL
Bottom Hole Location:Sec:16 Twp: 2N 68W Footage: 787 FNL  94 FEL
Proposed Depth/Form:17347 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 640, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED
Cement:Sacks: 80, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 800 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 800 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8046 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 457, Top: 500 ft., Bottom: 8046 ft.
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 17346 ft., Weight: 13.5 , Citings Type: PLANNED
Cement:Sacks: 364, Top: 7746 ft., Bottom: 17346 ft.

Wellbore Completed
Completion Date:5/30/2014
Spud Date:4/28/2014Spud Date Is:ACTUAL
Measured TD:17064 ft.Measured PB depth:16962 ft.
True Vertical TD:7485 ft.True Vertical PB depth:7485 ft.
Top PZ Location:Sec:22 Twp: 2N 68WFootage: 913 FSL  145 FWL
Bottom Hole Location:Sec:16 Twp: 2N 68WFootage: 787 FNL  94 FEL
Log Types:CBL, MWD. Open hole logs were run on the Edith Ann-Duckworth 4D-21H O268, which satisfies the COGCC request of open hole log data in a quarter-quarter section where none previously existed.
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 16 in., Top: 0 ft., Depth: 115 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 110, Top: 0 ft., Bottom: 116 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 962 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 383, Top: 0 ft., Bottom: 8114 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8102 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 681, Top: 990 ft., Bottom: 8114 ft., Determination Method: CBL
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 17049 ft., Weight: 16.5 , Citings Type: ACTUAL
Cement:Sacks: 1000, Top: 6072 ft., Bottom: 17064 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SUSSEX4325 ft.
SHANNON4582 ft.
TEEPEE BUTTES4867 ft.
SHARON SPRINGS7385 ft.
NIOBRARA7500 ft.
FORT HAYS8123 ft.
CODELL10641 ft.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 6/27/2017                 Interval Top: 10547 ft.    Interval Bottom: 16962 ft.

 Completed Information for Formation CODELL
1st Production Date:1/14/2015Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/19/2014Treatment End Date:11/25/2014
Treatment Summary:Stages 1 - 32 & 34-37 treated with a total of: 91,510 bbls of fresh water, 443 bbls of additives and 4,608,329 lbs of 40/70 Sand Proppant Codell formation intervals : 10,547 - 11,307 & 11,557 - 16,962.
Total fluid used in treatment (bbls):91952Max pressure during treatment (psi):7747
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:39
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.44
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):4980
Fresh water used in treatment (bbls):91952Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4608329Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:10547 ft.# Of Holes:1213
Interval Bottom:16962 ft.Hole Size:0.38 in.

Formation CD-FH                   Formation Classification:  OW                   Status:  PR - 12/1/2024                 Interval Top: 8325 ft.    Interval Bottom: 16962 ft.

 Completed Information for Formation CODELL-FORT HAYS
1st Production Date:1/14/2015Choke Size:0.000 in.
Formation Name:CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/19/2014Treatment End Date:11/26/2014
Treatment Summary:Stages 1 - 49 treated with a total of: 114,974 bbls of fresh water, 556 bbls of additives and 5,789,952 lbs of 40/70 Sand Proppant
Total fluid used in treatment (bbls):114933Max pressure during treatment (psi):7747
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:49
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.44
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):4980
Fresh water used in treatment (bbls):114933Disposition method For flowback:DISPOSAL
Total proppant used (lbs):5789952Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7800 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/8/2015Test Method:Flows from well
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 256
BTU_GAS 1298
CALC_BBLS_OIL 256
CALC_GOR 2266
CALC_MCF_GAS 580
CASING_PRESS 2262
GRAVITY_OIL 50
MCF_GAS 580
TUBING_PRESS 1853
Perforation Data:
Interval Top:8325 ft.# Of Holes:1524
Interval Bottom:16962 ft.Hole Size:0.38 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 6/27/2017                 Interval Top: 8123 ft.    Interval Bottom: 11509 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:1/14/2015Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/24/2014Treatment End Date:11/26/2014
Treatment Summary:Stages 33 & 38-49 treated with a total of: 24,020 bbls of fresh water, 113 bbls of additives and 1,181,623 lbs of 40/70 Sand Proppant Fort Hays formation intervals 8,123 - 10,499 & 11,354 - 11,509.
Total fluid used in treatment (bbls):23578Max pressure during treatment (psi):7675
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:10
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.44
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):4980
Fresh water used in treatment (bbls):23578Disposition method For flowback:DISPOSAL
Total proppant used (lbs):1181623Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8123 ft.# Of Holes:311
Interval Bottom:11509 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)785
Total Gas Produced (MCF)7660
GOR9757
GOR DeterminationBOE
Average BOE per Day5.773
Average MCFE per Day33.481

 Federal Financial Assurance  i 

 Tribal Well  i No