|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 8/2/2014 Measured TD: 11694 ft. Vertical TD: 7538 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 8/2/2014 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 9/16/2015 | | Proposed Top PZ Location: | Sec:34 Twp: 2n 66w | Footage: 1882 623 | | Bottom Hole Location: | Sec:34 Twp: 2n 66w | Footage: 2600 460 | | Proposed Depth/Form: | 12224 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA | | Casing: | String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED | | Cement: | Sacks: 80, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1102 ft., Weight: 40 , Citings Type: PLANNED | | Cement: | Sacks: 138, Top: 0 ft., Bottom: 1102 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7934 ft., Weight: 26 , Citings Type: PLANNED | | Cement: | Sacks: 450, Top: 802 ft., Bottom: 7934 ft. | | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 12224 ft., Weight: 13.5 , Citings Type: PLANNED | | Cement: | Sacks: 176, Top: 7634 ft., Bottom: 12224 ft. |
| | |
| Wellbore Completed | | Completion Date: | 4/14/2014 | | Spud Date: | 4/2/2014 | Spud Date Is: | ACTUAL | | Measured TD: | 11694 ft. | Measured PB depth: | 11676 ft. | | True Vertical TD: | 7538 ft. | True Vertical PB depth: | 7538 ft. | | Top PZ Location: | Sec:34 Twp: 2n 66w | Footage: 2671 FNL 1203 FEL | | Bottom Hole Location: | Sec:34 Twp: 2n 66w | Footage: 2610 FNL 491 FWL | | Log Types: | CBL/MWD/(NEU, IND, DENS run in API: 123-09005, and IND, DENS, CAL run in API: 123-33312) | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 16 in., Top: 0 ft., Depth: 97 ft., Weight: 30 , Citings Type: ACTUAL | | Cement: | Sacks: 432, Top: 0 ft., Bottom: 97 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1136 ft., Weight: 40 , Citings Type: ACTUAL | | Cement: | Sacks: 461, Top: 0 ft., Bottom: 1150 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8076 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 651, Top: 990 ft., Bottom: 8087 ft., Determination Method: CBL | | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11680 ft., Weight: 13.5 , Citings Type: ACTUAL | | Cement: | Sacks: 375, Top: 6076 ft., Bottom: 11694 ft., Determination Method: CALC | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SHARON SPRINGS | 7304 ft. | | | | | NIOBRARA | 7363 ft. | | | | | CODELL | 7972 ft. | | | |
Formation CODL Formation Classification: OW Status: PR - 8/2/2014 Interval Top: 8083 ft. Interval Bottom: 11630 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 7/26/2014 | Choke Size: | | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 6/14/2014 | Treatment End Date: | 6/18/2014 | | Treatment Summary: | 24 stage frac treated with a total of 53187 bbl fresh water, 2792 bbl recycled water and 1810641 lb 40/70 sand proppant. | | Total fluid used in treatment (bbls): | 55979 | Max pressure during treatment (psi): | 7638 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 24 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.43 | | Recycled water used in treatment (bbls): | 2792 | Total flowback volume recovered (bbls): | 2250 | | Fresh water used in treatment (bbls): | 53187 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 1810641 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7779 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/2/2014 | Test Method: | flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 271 | | BBLS_OIL | 326 | | BTU_GAS | 1298 | | CALC_BBLS_H2O | 271 | | CALC_BBLS_OIL | 326 | | CALC_GOR | 1049 | | CALC_MCF_GAS | 342 | | CASING_PRESS | 2008 | | GRAVITY_OIL | 50 | | MCF_GAS | 342 | | TUBING_PRESS | 1327 |
| | Perforation Data: | | Interval Top: | 8083 ft. | # Of Holes: | 648 | | Interval Bottom: | 11630 ft. | Hole Size: | 0.375 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 2505 |
| Total Gas Produced (MCF) | 30701 |
| GOR | 12255 |
| GOR Determination | BOE |
| Average BOE per Day | 21.245 |
| Average MCFE per Day | 123.205 |
| Federal Financial Assurance | i | |
|
|