|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 8/2/2014 Measured TD: 11510 ft. Vertical TD: 7554 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 8/2/2014 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 9/16/2015 | | Proposed Top PZ Location: | Sec:34 Twp: 2n 66w | Footage: 1198 655 | | Bottom Hole Location: | Sec:34 Twp: 2n 66w | Footage: 1225 460 | | Proposed Depth/Form: | 12144 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA | | Casing: | String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED | | Cement: | Sacks: 80, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1096 ft., Weight: 40 , Citings Type: PLANNED | | Cement: | Sacks: 137, Top: 0 ft., Bottom: 1096 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8007 ft., Weight: 26 , Citings Type: PLANNED | | Cement: | Sacks: 454, Top: 796 ft., Bottom: 8004 ft. | | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 12144 ft., Weight: 13.5 , Citings Type: PLANNED | | Cement: | Sacks: 170, Top: 7704 ft., Bottom: 12144 ft. |
| | |
| Wellbore Completed | | Completion Date: | 4/25/2014 | | Spud Date: | 4/15/2014 | Spud Date Is: | ACTUAL | | Measured TD: | 11510 ft. | Measured PB depth: | 11496 ft. | | True Vertical TD: | 7554 ft. | True Vertical PB depth: | 7553 ft. | | Top PZ Location: | Sec:34 Twp: 2n 66w | Footage: 1266 FNL 1261 FEL | | Bottom Hole Location: | Sec:34 Twp: 2N 66W | Footage: 1221 FNL 526 FWL | | Log Types: | CCL/MWD/(NEU, IND, DENS run in API: 123-09005, and IND, DENS, CAL run in API: 123-33312) | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 16 in., Top: 0 ft., Depth: 97 ft., Weight: 30 , Citings Type: ACTUAL | | Cement: | Sacks: 432, Top: 0 ft., Bottom: 97 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1138 ft., Weight: 40 , Citings Type: ACTUAL | | Cement: | Sacks: 497, Top: 0 ft., Bottom: 1150 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7985 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 655, Top: 800 ft., Bottom: 8003 ft., Determination Method: CBL | | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11500 ft., Weight: 13.5 , Citings Type: ACTUAL | | Cement: | Sacks: 305, Top: 7904 ft., Bottom: 11510 ft., Determination Method: CALC | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SHARON SPRINGS | 7224 ft. | | | | | NIOBRARA | 7281 ft. | | | | | CODELL | 7996 ft. | | | |
Formation CODL Formation Classification: OW Status: PR - 8/2/2014 Interval Top: 7996 ft. Interval Bottom: 11451 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 7/26/2014 | Choke Size: | | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 6/9/2014 | Treatment End Date: | 6/13/2014 | | Treatment Summary: | 23 stage frac treated with 21919 bbl revcycled water and 8989 bbl fresh water, 1693837 lb of 40/70 sand proppant. | | Total fluid used in treatment (bbls): | 30908 | Max pressure during treatment (psi): | 7837 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 23 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.43 | | Recycled water used in treatment (bbls): | 21919 | Total flowback volume recovered (bbls): | 2100 | | Fresh water used in treatment (bbls): | 8989 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 1693837 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7585 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/2/2014 | Test Method: | flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 258 | | BBLS_OIL | 310 | | BTU_GAS | 1298 | | CALC_BBLS_H2O | 258 | | CALC_BBLS_OIL | 310 | | CALC_GOR | 1358 | | CALC_MCF_GAS | 421 | | CASING_PRESS | 2014 | | GRAVITY_OIL | 50 | | MCF_GAS | 421 | | TUBING_PRESS | 1319 |
| | Perforation Data: | | Interval Top: | 7996 ft. | # Of Holes: | 621 | | Interval Bottom: | 11451 ft. | Hole Size: | 0.375 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 1744 |
| Total Gas Produced (MCF) | 33589 |
| GOR | 19259 |
| GOR Determination | MCFE |
| Average BOE per Day | 20.656 |
| Average MCFE per Day | 119.804 |
| Federal Financial Assurance | i | |
|
|