Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-38048
Well Classification: OW Status: PR - 1/1/2020
Well Name/No:File FED #3O-32H-K268
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/1/2020
FacilityID:434242LocationID:434248
Municipality/County:FREDERICK / WELD #123Location:NESW 32 2N68W 6
Field:WATTENBERG - #90750Elevation:4970 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1760FSL  1732 FWLLat/Long: 40.092574 / -105.030717Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.092574 / -105.030716Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/31/2018
End Date: 4/14/2018
Reported: 5/8/2018
Days to report: 24
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 1/1/2020             Measured TD: 18778 ft.    Vertical TD: 7357 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 1/1/2020
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:9/15/2015
Proposed Top PZ Location:Sec:32 Twp: 2N 68W Footage: 1762 FSL  1466 FWL
Bottom Hole Location:Sec:20 Twp: 2N 68W Footage: 2175 FSL  1525 FWL
Proposed Depth/Form:13823 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 800, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED
Cement:Sacks: 80, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 857 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 349, Top: 0 ft., Bottom: 857 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18880 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2709, Top: 0 ft., Bottom: 18880 ft.

Wellbore Completed
Completion Date:12/29/2017
Spud Date:1/8/2015Spud Date Is:ACTUAL
Measured TD:18778 ft.Measured PB depth:18729 ft.
True Vertical TD:7357 ft.True Vertical PB depth:7356 ft.
Top PZ Location:Sec:32 Twp: 2N 68WFootage: 1762 FSL  1466 FWL
Bottom Hole Location:Sec:20 Twp: 2N 68WFootage: 2175 FSL  1525 FWL
Log Types:
Log Types:Mud Log, MWD/LWD, CBL, (Pulsed Neutron in 123-38072)
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 16 in., Top: 0 ft., Depth: 141 ft., Weight: 42.09 , Citings Type: ACTUAL
Cement:Sacks: 160, Top: 0 ft., Bottom: 141 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 813 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 346, Top: 0 ft., Bottom: 813 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 18761 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2920, Top: 1032 ft., Bottom: 18778 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4344 ft.
SHANNON4951 ft.
SHARON SPRINGS7405 ft.
NIOBRARA7621 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 1/1/2020                  Interval Top: 7718 ft.    Interval Bottom: 18722 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:9/16/2018Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/31/2018Treatment End Date:4/14/2018
Treatment Summary:57 stages pumped into the Upper Cretaceous Niobrara Fm using: 431,494 bbls fresh water, 61 bbls 15% Hcl. 413 bbls FRP-4K (friction reducer) and 9,610,979 lbs 40/70 mesh proppant.
Total fluid used in treatment (bbls):431968Max pressure during treatment (psi):8540
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:57
Total acid used in treatment (bbls):61Min frac gradient (psi/ft):0.91
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):981
Fresh water used in treatment (bbls):431494Disposition method For flowback:DISPOSAL
Total proppant used (lbs):9610979Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7449 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/16/2018Test Method:Flowback
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 287
BBLS_OIL 550
BTU_GAS 1251
CALC_BBLS_H2O 287
CALC_BBLS_OIL 550
CALC_GOR 1684
CALC_MCF_GAS 926
CASING_PRESS 2145
GRAVITY_OIL 47
MCF_GAS 926
TUBING_PRESS 1695
Perforation Data:
Interval Top:7718 ft.# Of Holes:1356
Interval Bottom:18722 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
March 2025 - February 2026i
Total Oil Produced (Barrels)4325
Total Gas Produced (MCF)176349
GOR40774
GOR DeterminationMCFE
Average BOE per Day95.306
Average MCFE per Day552.775

 Federal Financial Assurance  i 

 Tribal Well  i No