Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-38034
Well Classification: OW Status: PR - 3/1/2025
Well Name/No:HOWARD #16N-33HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/1/2025
FacilityID:434222LocationID:434221
County:WELD #123Location:NWSE 28 1N67W 6
Field:WATTENBERG - #90750Elevation:5022 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1594FSL  1374 FELLat/Long: 40.019199 / -104.890970Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.019200 / -104.890972Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/16/2014
End Date: 4/19/2014
Reported: 6/16/2014
Days to report: 58
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 3/1/2025             Measured TD: 12752 ft.    Vertical TD: 7373 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 3/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:9/12/2015
Proposed Top PZ Location:Sec:33 Twp: 1N 67W Footage: 50 FNL  650 FEL
Bottom Hole Location:Sec:33 Twp: 1N 67W Footage: 460 FSL  650 FEL
Proposed Depth/Form:12772 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 200, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1000 ft., Weight: 36.0 , Citings Type: PLANNED
Cement:Sacks: 380, Top: 0 ft., Bottom: 1000 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8014 ft., Weight: 26.0 , Citings Type: PLANNED
Cement:Sacks: 850, Top: 0 ft., Bottom: 8014 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7014 ft., Depth: 12772 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:2/4/2014
Spud Date:10/4/2013Spud Date Is:ACTUAL
Measured TD:12752 ft.Measured PB depth:6500 ft.
True Vertical TD:7373 ft.True Vertical PB depth:6373 ft.
Top PZ Location:Sec:28 Twp: 1N 67WFootage: 182 FSL  636 FEL
Bottom Hole Location:Sec:33 Twp: 1N 67WFootage: 485 FSL  686 FEL
Log Types:CBL, GR, RES, MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1224 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 436, Top: 0 ft., Bottom: 1224 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7781 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 855, Top: 50 ft., Bottom: 7781 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6662 ft., Depth: 12737 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SUSSEX5004 ft.
SHANNON5480 ft.
SHARON SPRINGS7628 ft.
NIOBRARA7668 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 3/1/2025                  Interval Top: 7835 ft.    Interval Bottom: 12752 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:5/7/2014Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/16/2014Treatment End Date:4/19/2014
Treatment Summary:COMPLETED THROUGH AN OPEN HOLE LINER FROM 7835-12752. 95 BBL ACID,17356 BBL CROSSLINK GEL,16733 BBL LINEAR GEL,98223 BBL SLICKWATER,132407 BBL TOTAL FLUID. 516350# 30/50 ,3432170# 40/70 ,3948520# TOTAL SAND.
Total fluid used in treatment (bbls):132407Max pressure during treatment (psi):7887
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:37
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):0.87
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):4105
Fresh water used in treatment (bbls):132312Disposition method For flowback:RECYCLE
Total proppant used (lbs):3948520Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/2/2014Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 8
BBLS_OIL 15
BTU_GAS 1257
CALC_BBLS_H2O 8
CALC_BBLS_OIL 15
CALC_GOR 3266
CALC_MCF_GAS 49
CASING_PRESS 1500
GRAVITY_OIL 50
MCF_GAS 49
Perforation Data:
Interval Top:7835 ft.# Of Holes:0
Interval Bottom:12752 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)707
Total Gas Produced (MCF)7612
GOR10766
GOR DeterminationBOE
Average BOE per Day5.508
Average MCFE per Day31.947

 Federal Financial Assurance  i 

 Tribal Well  i No