Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-38026
Well Classification: OW Status: PR - 3/1/2022
Well Name/No:HIGHWAY 160 #15C-2HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/1/2022
FacilityID:434212LocationID:434216
County:WELD #123Location:NWNE 2 1N66W 6
Field:WATTENBERG - #90750Elevation:5102 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:696FNL  1532 FELLat/Long: 40.085449 / -104.740312Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.085448 / -104.740321Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/1/2014
End Date: 5/10/2014
Reported: 7/2/2014
Days to report: 53
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 3/1/2022             Measured TD: 12690 ft.    Vertical TD: 7555 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 3/1/2022
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:9/12/2015
Proposed Top PZ Location:Sec:2 Twp: 1N 66W Footage: 504 FNL  2398 FEL
Bottom Hole Location:Sec:2 Twp: 1N 66W Footage: 2 FSL  2548 FEL
Proposed Depth/Form:12542 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 400, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1219 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 460, Top: 0 ft., Bottom: 1219 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8009 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 850, Top: 0 ft., Bottom: 8009 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7011 ft., Depth: 12542 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:12/30/2013
Spud Date:10/26/2013Spud Date Is:ACTUAL
Measured TD:12690 ft.Measured PB depth:12667 ft.
True Vertical TD:7555 ft.True Vertical PB depth:7555 ft.
Top PZ Location:Sec:2 Twp: 1N 66WFootage: 504 FNL  2398 FEL
Bottom Hole Location:Sec:2 Twp: 1N 66WFootage: 2 FSL  2548 FEL
Log Types:CBL, GR, MUD , RES
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1249 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 468, Top: 0 ft., Bottom: 1249 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8025 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 790, Top: 1400 ft., Bottom: 8025 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7063 ft., Depth: 12680 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
PARKMAN4497 ft.
SUSSEX5566 ft.
SHARON SPRINGS7292 ft.
NIOBRARA7440 ft.
FORT HAYS7795 ft.
CODELL7883 ft.

Formation CODL                     Formation Classification:  OW                     Status:  PR - 3/1/2022                  Interval Top: 8052 ft.    Interval Bottom: 12690 ft.

 Completed Information for Formation CODELL
1st Production Date:6/25/2014Choke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/1/2014Treatment End Date:5/10/2014
Treatment Summary:COMPLETED THROUGH AN OPEN HOLE LINER FROM 8052-12690. 14758 BBL CROSSLINK GEL,3439 BBL LINEAR GEL,70568 BBL SLICKWATER,88765 BBL TOTAL FLUID. 423658# 30/50 OTTAWA/ST. PETERS,1824147# 40/70 OTTAWA/ST. PETERS,2247805# TOTAL SAND.
Total fluid used in treatment (bbls):88765Max pressure during treatment (psi):7386
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:40
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.77
Recycled water used in treatment (bbls):2242Total flowback volume recovered (bbls):657
Fresh water used in treatment (bbls):86523Disposition method For flowback:RECYCLE
Total proppant used (lbs):2247805Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/28/2014Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 447
BTU_GAS 1377
CALC_BBLS_OIL 447
CALC_GOR 1564
CALC_MCF_GAS 699
CASING_PRESS 1600
GRAVITY_OIL 47
MCF_GAS 699
Perforation Data:
Interval Top:8052 ft.# Of Holes:0
Interval Bottom:12690 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)2670
Total Gas Produced (MCF)74358
GOR27849
GOR DeterminationMCFE
Average BOE per Day42.438
Average MCFE per Day246.127

 Federal Financial Assurance  i 

 Tribal Well  i No