Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-38016
Well Classification: OW Status: PR - 7/1/2023
Well Name/No:PETTINGER #2C-18HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/1/2023
FacilityID:434199LocationID:434202
County:WELD #123Location:SWSE 18 1N65W 6
Field:WATTENBERG - #90750Elevation:4997 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:495FSL  1673 FELLat/Long: 40.045527 / -104.703053Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.045529 / -104.703059Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/25/2014
End Date: 5/30/2014
Reported: 7/28/2014
Days to report: 59
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 7/1/2023             Measured TD: 12406 ft.    Vertical TD: 7388 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 7/1/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:9/12/2015
Proposed Top PZ Location:Sec:18 Twp: 1N 65W Footage: 650 FSL  1950 FEL
Bottom Hole Location:Sec:18 Twp: 1N 65W Footage: 1 FNL  1950 FEL
Proposed Depth/Form:12165 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 200, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1170 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 380, Top: 0 ft., Bottom: 1000 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7761 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 820, Top: 0 ft., Bottom: 7761 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6759 ft., Depth: 12432 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:2/28/2014
Spud Date:11/30/2013Spud Date Is:ACTUAL
Measured TD:12406 ft.Measured PB depth:12343 ft.
True Vertical TD:7388 ft.True Vertical PB depth:7386 ft.
Top PZ Location:Sec:18 Twp: 1N 65WFootage: 664 FSL  1961 FEL
Bottom Hole Location:Sec:18 Twp: 1N 65WFootage: 26 FNL  1964 FEL
Log Types:CBL, GR, MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1195 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 444, Top: 0 ft., Bottom: 1195 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7788 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 720, Top: 912 ft., Bottom: 7788 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6697 ft., Depth: 12391 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 355, Top: 6697 ft., Bottom: 12391 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS
PARKMAN4193 ft.
SUSSEX4577 ft.
NIOBRARA7114 ft.
FORT HAYS7581 ft.
CODELL7728 ft.

Formation CODL                     Formation Classification:  OW                     Status:  PR - 7/1/2023                  Interval Top: 7798 ft.    Interval Bottom: 12209 ft.

 Completed Information for Formation CODELL
1st Production Date:7/7/2014Choke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/25/2014Treatment End Date:5/30/2014
Treatment Summary:PERF AND FRAC FROM 7798-12209. 89589 BBL SLICKWATER,3464 BBL WATER,93053 BBL TOTAL FLUID. 2450213# 40/70 GENOA/SAND HILLS,2450213# TOTAL SAND.
Total fluid used in treatment (bbls):93053Max pressure during treatment (psi):7484
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:23
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.91
Recycled water used in treatment (bbls):2363Total flowback volume recovered (bbls):510
Fresh water used in treatment (bbls):90690Disposition method For flowback:RECYCLE
Total proppant used (lbs):2450213Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/10/2014Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1
BBLS_OIL 209
BTU_GAS 1375
CALC_BBLS_H2O 1
CALC_BBLS_OIL 209
CALC_GOR 1421
CALC_MCF_GAS 297
CASING_PRESS 1800
GRAVITY_OIL 48
MCF_GAS 297
Perforation Data:
Interval Top:7798 ft.# Of Holes:546
Interval Bottom:12209 ft.Hole Size:0.37 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)3477
Total Gas Produced (MCF)33682
GOR9687
GOR DeterminationBOE
Average BOE per Day25.405
Average MCFE per Day147.357

 Federal Financial Assurance  i 

 Tribal Well  i No