|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 8/1/2023 Measured TD: 12952 ft. Vertical TD: 7797 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 8/1/2023 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 8/26/2015 | Proposed Top PZ Location: | Sec:33 Twp: 1N 67W | Footage: 50 FNL 2450 FWL | Bottom Hole Location: | Sec:33 Twp: 1N 67W | Footage: 460 FSL 2450 FWL | Proposed Depth/Form: | 12931 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 200, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1000 ft., Weight: 36.0 , Citings Type: PLANNED | Cement: | Sacks: 380, Top: 0 ft., Bottom: 1000 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8170 ft., Weight: 26.0 , Citings Type: PLANNED | Cement: | Sacks: 860, Top: 0 ft., Bottom: 8170 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6966 ft., Depth: 12931 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: , Top: , Bottom: |
| | |
Wellbore Completed | Completion Date: | 9/29/2013 | Spud Date: | 9/11/2013 | Spud Date Is: | ACTUAL | Measured TD: | 12952 ft. | Measured PB depth: | 12928 ft. | True Vertical TD: | 7797 ft. | True Vertical PB depth: | 7797 ft. | Top PZ Location: | Sec:33 Twp: 1N 67W | Footage: 5 FNL 2428 FWL | Bottom Hole Location: | Sec:33 Twp: 1N 67W | Footage: 463 S 2452 W | Log Types: | CBL, GR, MUD | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1053 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 393, Top: 0 ft., Bottom: 1053 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8145 ft., Weight: 26 , Citings Type: ACTUAL | Cement: | Sacks: 794, Top: 290 ft., Bottom: 8145 ft., Determination Method: CBL | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7151 ft., Depth: 12937 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: , Determination Method: CALC | Formation | Interval Top | Log Bottom | Cored | DSTs | SHARON SPRINGS | 7415 ft. | | | | NIOBRARA | 7440 ft. | | | | FORT HAYS | 8420 ft. | | | | CODELL | 8948 ft. | | | |
Formation CARL Formation Classification: OW Status: CM - 10/1/2020 Interval Top: 10554 ft. Interval Bottom: 11615 ft. Completed Information for Formation CARLILE | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CARLILE | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 10/1/2020 | Treatment End Date: | N/A | Treatment Summary: | 10554-11615 | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CARL. |
| Perforation Data: | Interval Top: | 10554 ft. | # Of Holes: | 0 | Interval Bottom: | 11615 ft. | Hole Size: | 0 in. |
|
Formation CODL Formation Classification: OW Status: CM - 9/30/2020 Interval Top: 8939 ft. Interval Bottom: 12952 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Type: | | Treatment Date: | 10/1/2020 | Treatment End Date: | N/A | Treatment Summary: | 8939-10554, 11615-12952 | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 8939 ft. | # Of Holes: | 0 | Interval Bottom: | 12952 ft. | Hole Size: | 0 in. |
|
Formation FTHYS Formation Classification: OW Status: CM - 10/1/2020 Interval Top: 8423 ft. Interval Bottom: 8939 ft. Completed Information for Formation FORT HAYS | 1st Production Date: | N/A | Choke Size: | | Formation Name: | FORT HAYS | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 10/1/2020 | Treatment End Date: | N/A | Treatment Summary: | 8423-8939 | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation FTHYS. |
| Perforation Data: | Interval Top: | 8423 ft. | # Of Holes: | 0 | Interval Bottom: | 8939 ft. | Hole Size: | 0 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 10/1/2020 Interval Top: 8190 ft. Interval Bottom: 8423 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 10/1/2020 | Treatment End Date: | N/A | Treatment Summary: | 8190-8423 | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 8190 ft. | # Of Holes: | 0 | Interval Bottom: | 8423 ft. | Hole Size: | 0 in. |
|
Formation NFCC Formation Classification: OW Status: PR - 8/1/2023 Interval Top: 8190 ft. Interval Bottom: 12952 ft. Completed Information for Formation NIOBRARA-FORT HAYS-CODELL-CARLILE | 1st Production Date: | 5/7/2014 | Choke Size: | | Formation Name: | NIOBRARA-FORT HAYS-CODELL-CARLILE | Commingled: | No | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 4/1/2014 | Treatment End Date: | 4/3/2014 | Treatment Summary: | COMPLETED THROUGH AN OPEN HOLE LINER FROM 8190-12952.
48 BBL ACID,7760 BBL CROSSLINK GEL,1267 BBL LINEAR GEL,88169 BBL SLICKWATER,97244 BBL TOTAL FLUID.
230820# 30/50 OTTAWA/ST. PETERS SAND,2350900# 40/70 OTTAWA/ST. PETERS SAND,2581720# TOTAL SAND. | Total fluid used in treatment (bbls): | 97244 | Max pressure during treatment (psi): | 7132 | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | Type Of gas: | | Number Of staged intervals: | 36 | Total acid used in treatment (bbls): | 48 | Min frac gradient (psi/ft): | 0.79 | Recycled water used in treatment (bbls): | 2876 | Total flowback volume recovered (bbls): | 635 | Fresh water used in treatment (bbls): | 94320 | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 2581720 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 5/9/2014 | Test Method: | Flowing | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 293 | BTU_GAS | 1351 | CALC_BBLS_OIL | 293 | CALC_GOR | 1420 | CALC_MCF_GAS | 416 | CASING_PRESS | 2000 | GRAVITY_OIL | 50 | MCF_GAS | 416 |
| Perforation Data: | Interval Top: | 8190 ft. | # Of Holes: | 0 | Interval Bottom: | 12952 ft. | Hole Size: | 0 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 2131 |
Total Gas Produced (MCF) | 45224 |
GOR | 21221 |
GOR Determination | MCFE |
Average BOE per Day | 27.051 |
Average MCFE per Day | 156.906 |
Federal Financial Assurance | i | |
|
|