Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-37868
Well Classification: OW Status: PR - 10/1/2022
Well Name/No:HOWARD #3C-29HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/1/2022
FacilityID:433950LocationID:434013
County:WELD #123Location:SENW 32 1N67W 6
Field:WATTENBERG - #90750Elevation:5049 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2439FNL  1835 FWLLat/Long: 40.008137 / -104.917192Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.008138 / -104.917198Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/29/2015
End Date: 5/9/2015
Reported: 7/6/2015
Days to report: 58
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 10/1/2022             Measured TD: 15438 ft.    Vertical TD: 7805 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 10/1/2022
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:8/17/2015
Proposed Top PZ Location:Sec:32 Twp: 1N 67W Footage: 1991 FNL  2084 FWL
Bottom Hole Location:Sec:29 Twp: 1N 67W Footage: 1 FNL  2100 FWL
Proposed Depth/Form:15484 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 280, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 925 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 330, Top: 0 ft., Bottom: 925 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8213 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 870, Top: 0 ft., Bottom: 8213 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7187 ft., Depth: 15484 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:8/29/2014
Spud Date:6/17/2014Spud Date Is:ACTUAL
Measured TD:15438 ft.Measured PB depth:15383 ft.
True Vertical TD:7805 ft.True Vertical PB depth:7805 ft.
Top PZ Location:Sec:32 Twp: 1N 67WFootage: 1892 FNL  2077 FWL
Bottom Hole Location:Sec:29 Twp: 1N 67WFootage: 26 FNL  2083 FWL
Log Types:CBL, GR, MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 978 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 421, Top: 0 ft., Bottom: 978 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8291 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 800, Top: 296 ft., Bottom: 8291 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7182 ft., Depth: 15432 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 550, Top: 7182 ft., Bottom: 15432 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4828 ft.N
SHARON SPRINGS7416 ft.N
NIOBRARA7443 ft.N
FORT HAYS7981 ft.N
CODELL8014 ft.N
CARLILE8099 ft.

Formation CD-CRL                 Formation Classification:  OW                 Status:  PR - 10/1/2022                 Interval Top: 8302 ft.    Interval Bottom: 15372 ft.

 Completed Information for Formation CODELL-CARLILE
1st Production Date:5/15/2015Choke Size: 
Formation Name:CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/29/2015Treatment End Date:5/9/2015
Treatment Summary:PERF AND FRAC FROM 8302-15,372. 123,214 BBL SLICKWATER, 6,049 BBL WATER, - 129,263 BBL TOTAL FLUID 3,678,859# 40/70 GENOA/SAND HILLS, - 3,678,859# TOTAL SAND ENTERED CODELL 8012-8098; 8290-10,998; 11,374-15,372 CARLILE 8099-8289; 10,999-11,373; THIS IS A DESIGNATED SOURCE OF SUPPLY WELL; (SEE ATTACHMENT)
Total fluid used in treatment (bbls):129263Max pressure during treatment (psi):7322
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:24
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.83
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):1518
Fresh water used in treatment (bbls):129263Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3678859Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/20/2015Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 790
BBLS_OIL 172
BTU_GAS 1133
CALC_BBLS_H2O 790
CALC_BBLS_OIL 172
CALC_GOR 1372
CALC_MCF_GAS 236
CASING_PRESS 400
GRAVITY_OIL 50
MCF_GAS 236
Perforation Data:
Interval Top:8302 ft.# Of Holes:972
Interval Bottom:15372 ft.Hole Size:0.37 in.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 12/9/2016                 Interval Top: 8099 ft.    Interval Bottom: 11373 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:12/9/2016Treatment End Date:N/A
Treatment Summary:CARLILE 8099-8289; 10,999-11,373
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:8099 ft.# Of Holes:972
Interval Bottom:11373 ft.Hole Size:0.37 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 12/9/2016                 Interval Top: 8012 ft.    Interval Bottom: 15372 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:12/9/2016Treatment End Date:N/A
Treatment Summary:ENTERED CODELL 8012-8098; 8290-10,998; 11,374-15,372
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8012 ft.# Of Holes:972
Interval Bottom:15372 ft.Hole Size:0.37 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)204
Total Gas Produced (MCF)9741
GOR47750
GOR DeterminationMCFE
Average BOE per Day5.154
Average MCFE per Day29.903

 Federal Financial Assurance  i 

 Tribal Well  i No