Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-37829
Well Classification: OW Status: PR - 12/1/2023
Well Name/No:ZIEMER #34N-5HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/1/2023
FacilityID:433874LocationID:433878
County:WELD #123Location:NWNW 5 1N65W 6
Field:WATTENBERG - #90750Elevation:4957 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:286FNL  287 FWLLat/Long: 40.086805 / -104.696074Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.086805 / -104.696074Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/9/2014
End Date: 4/13/2014
Reported: 6/6/2014
Days to report: 54
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 12/1/2023             Measured TD: 11593 ft.    Vertical TD: 7087 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 12/1/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:8/13/2015
Proposed Top PZ Location:Sec:5 Twp: 1N 65W Footage: 634 FNL  250 FWL
Bottom Hole Location:Sec:5 Twp: 1N 65W Footage: 460 FSL  250 FWL
Proposed Depth/Form:11600 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1000 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 380, Top: 0 ft., Bottom: 1000 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7476 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 790, Top: 0 ft., Bottom: 7476 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6472 ft., Depth: 11600 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:12/1/2013
Spud Date:10/24/2013Spud Date Is:ACTUAL
Measured TD:11593 ft.Measured PB depth:11567 ft.
True Vertical TD:7087 ft.True Vertical PB depth:7088 ft.
Top PZ Location:Sec:5 Twp: 1N 65WFootage: 650 FNL  247 FWL
Bottom Hole Location:Sec:5 Twp: 1N 65WFootage: 485 FSL  283 FWL
Log Types:CBL, GR, MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1106 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 460, Top: 0 ft., Bottom: 1106 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7507 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 730, Top: 810 ft., Bottom: 7507 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6512 ft., Depth: 11578 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7038 ft.
NIOBRARA7093 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 12/1/2023                 Interval Top: 7545 ft.    Interval Bottom: 11593 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/30/2014Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/9/2014Treatment End Date:4/13/2014
Treatment Summary:COMPLETED THROUGH AN OPEN HOLE LINER FROM 7545-11593. 80729 BBL CROSSLINK GEL,1655 BBL LINEAR GEL,34860 BBL SLICKWATER,117244 BBL TOTAL FLUID. 7802889# 30/50 OTTAWA/ST. PETERS SAND,355223# 40/70 GENOA/SAND HILLS,8158112# TOTAL SAND.
Total fluid used in treatment (bbls):117244Max pressure during treatment (psi):7652
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:32
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.95
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):7113
Fresh water used in treatment (bbls):117244Disposition method For flowback:RECYCLE
Total proppant used (lbs):8158112Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/4/2014Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 78
BTU_GAS 1380
CALC_BBLS_OIL 78
CALC_GOR 1359
CALC_MCF_GAS 106
CASING_PRESS 1625
GRAVITY_OIL 45
MCF_GAS 106
Perforation Data:
Interval Top:7545 ft.# Of Holes:0
Interval Bottom:11593 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)2443
Total Gas Produced (MCF)47873
GOR19595
GOR DeterminationMCFE
Average BOE per Day29.110
Average MCFE per Day168.822

 Federal Financial Assurance  i 

 Tribal Well  i No