Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-37812
Well Classification: OW Status: PR - 1/1/2024
Well Name/No:Bailey #6-26-8-60
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:VERDAD RESOURCES LLC - 10651
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/1/2024
FacilityID:433843LocationID:432951
County:WELD #123Location:SWSW 26 8N60W 6
Field:DJ HORIZONTAL NIOBRARA - #16950Elevation:4876 ft.
Planned Location:337FSL  1319 FWLLat/Long: 40.627020 / -104.063750Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.627020 / -104.063750Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/16/2014
End Date: 1/17/2014
Reported: 1/31/2014
Days to report: 14
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 1/1/2024             Measured TD: 10515 ft.    Vertical TD: 6208 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 1/1/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:8/12/2015
Prop Depth/Form:10691 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 535-362 , Unit Acreage: 640, Drill Unit: ALL
Casing:String Type: CONDUCTOR, Hole Size: 16 in., Size: 15.25 in., Top: 0 ft., Depth: 60 ft., Weight: 65 , Citings Type: PLANNED
Cement:Sacks: 6, Top: 0 ft., Bottom: 60 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1443 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 534, Top: 0 ft., Bottom: 1443 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6388 ft., Weight: 23 , Citings Type: PLANNED
Cement:Sacks: 546, Top: 0 ft., Bottom: 6388 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.25 in., Size: 4.5 in., Top: 5653 ft., Depth: 10691 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:9/4/2013
Spud Date:8/26/2013Spud Date Is:ACTUAL
Measured TD:10515 ft.Measured PB depth:10450 ft.
True Vertical TD:6208 ft.True Vertical PB depth:6208 ft.
Top PZ Location:Sec:26 Twp: 8N 60WFootage: 674 FSL  1082 FWLDepth
Bottom Hole Location:Sec:26 Twp: 8N 60WFootage: 651 FNL  1088 FWLDepth
Log Types:MWD with Gamma Ray, CBL; No open-hole logs ran.
Casing:String Type: CONDUCTOR, Hole Size: 18 in., Size: 16 in., Top: 0 ft., Depth: 60 ft., Weight: 36.9 , Citings Type: ACTUAL
Cement:Sacks: 8, Top: 0 ft., Bottom: 60 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1458 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 684, Top: 0 ft., Bottom: 1458 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6387 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 579, Top: 1770 ft., Bottom: 6387 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 5515 ft., Depth: 10500 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PIERRE552 ft.NN
PARKMAN3649 ft.3886 ft.NN
SUSSEX4270 ft.4490 ft.NN
SHARON SPRINGS6080 ft.6196 ft.NN
NIOBRARA6196 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 1/1/2024                  Interval Top: 6536 ft.    Interval Bottom: 10515 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:1/26/2014Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/16/2014Treatment End Date:1/17/2014
Treatment Summary:Fracture stimulated through a 14 stage port and packer system with 3,613,311 lbs of sand and 54,355 bbls of fresh water. Swell Packer set at 6536' Isolating top production interval.
Total fluid used in treatment (bbls):54355Max pressure during treatment (psi):4778
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:14
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.86
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):17393
Fresh water used in treatment (bbls):54355Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3613311Green completions techniques utilized:No
Reason green techniques Not utilized: PIPELINE
Tubing Size:2.375 in.Tubing Setting Depth:5600 ft.
Tubing Packer Depth:5600 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/26/2014Test Method:
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 1379
BBLS_OIL 208
CALC_BBLS_H2O 1379
CALC_BBLS_OIL 208
CASING_PRESS 350
GRAVITY_OIL 36
Perforation Data:
Interval Top:6536 ft.# Of Holes:
Interval Bottom:10515 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)1670
Total Gas Produced (MCF)5574
GOR3337
GOR DeterminationBOE
Average BOE per Day7.194
Average MCFE per Day41.729

 Federal Financial Assurance  i 

 Tribal Well  i No