Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-37797
Well Classification: OW Status: PR - 3/1/2022
Well Name/No:Boyd #3F-19H-M368
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/1/2022
FacilityID:433816LocationID:433811
County:WELD #123Location:SWSW 19 3N68W 6
Field:WATTENBERG - #90750Elevation:5004 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1019FSL  612 FWLLat/Long: 40.206470 / -105.052980Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.206461 / -105.052990Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/6/2014
End Date: 9/10/2014
Reported: 10/28/2014
Days to report: 48
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 3/1/2022             Measured TD: 11399 ft.    Vertical TD: 7048 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 3/1/2022
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:8/7/2015
Proposed Top PZ Location:Sec:19 Twp: 3N 68W Footage: 601 FSL  737 FWL
Bottom Hole Location:Sec:19 Twp: 3N 68W Footage: 560 FSL  491 FEL
Proposed Depth/Form:11603 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED
Cement:Sacks: 80, Top: , Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 800 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 100, Top: , Bottom: 800 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7410 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 418, Top: 500 ft., Bottom: 7410 ft.
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11602 ft., Weight: 13.5 , Citings Type: PLANNED
Cement:Sacks: 172, Top: 7110 ft., Bottom: 11602 ft.

Wellbore Completed
Completion Date:7/6/2014
Spud Date:6/18/2014Spud Date Is:ACTUAL
Measured TD:11399 ft.Measured PB depth:11331 ft.
True Vertical TD:7048 ft.True Vertical PB depth:7051 ft.
Top PZ Location:Sec:19 Twp: 3N 68WFootage: 601 FSL  737 FWL
Bottom Hole Location:Sec:19 Twp: 3N 68WFootage: 560 FSL  491 FEL
Log Types:CBL, MWD, Open-hole logs for this pad were run on the Boyd 3C-19H-M368 well.
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 16 in., Top: 0 ft., Depth: 93 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 114, Top: 0 ft., Bottom: 93 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 854 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 290, Top: 0 ft., Bottom: 854 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7379 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 625, Top: 800 ft., Bottom: 7379 ft., Determination Method: CBL
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11399 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: 335, Top: 6379 ft., Bottom: 11399 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
FOX HILLS BASE217 ft.
SUSSEX3690 ft.
SHANNON4180 ft.
TEEPEE BUTTES5703 ft.
SHARON SPRINGS6564 ft.
NIOBRARA6655 ft.
FORT HAYS6927 ft.
CODELL7022 ft.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 5/1/2017                  Interval Top: 10033 ft.    Interval Bottom: 11399 ft.

 Completed Information for Formation CODELL
1st Production Date:10/15/2014Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/6/2014Treatment End Date:9/10/2014
Treatment Summary:10033’ – 11399' MD
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:10033 ft.# Of Holes:
Interval Bottom:11399 ft.Hole Size:

Formation NBFHC                   Formation Classification:  OW                   Status:  PR - 3/1/2022                  Interval Top: 7396 ft.    Interval Bottom: 11399 ft.

 Completed Information for Formation NIOBRARA-FT HAYS-CODELL
1st Production Date:10/15/2014Choke Size:14.000 in.
Formation Name:NIOBRARA-FT HAYS-CODELLCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/6/2014Treatment End Date:9/10/2014
Treatment Summary:• Stages 1-26 treated with 24,825 bbl fresh water, 188 bbl additives and 2,460,329 lbs 40/70 sand proppant.
Total fluid used in treatment (bbls):38132Max pressure during treatment (psi):8799
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:26
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.43
Recycled water used in treatment (bbls):13307Total flowback volume recovered (bbls):3400
Fresh water used in treatment (bbls):24825Disposition method For flowback:DISPOSAL
Total proppant used (lbs):2460329Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7050 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/22/2014Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 319
BBLS_OIL 144
BTU_GAS 1298
CALC_BBLS_H2O 319
CALC_BBLS_OIL 144
CALC_GOR 548
CALC_MCF_GAS 79
CASING_PRESS 2028
GRAVITY_OIL 50
MCF_GAS 79
TUBING_PRESS 1401
Perforation Data:
Interval Top:7396 ft.# Of Holes:676
Interval Bottom:11399 ft.Hole Size:0.38 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 5/1/2017                  Interval Top: 7243 ft.    Interval Bottom: 10033 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:10/15/2014Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/6/2014Treatment End Date:9/10/2014
Treatment Summary:7243’ – 7524’ MD & 9207’ – 10033’ MD
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:7243 ft.# Of Holes:
Interval Bottom:10033 ft.Hole Size:

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 5/1/2017                  Interval Top: 6715 ft.    Interval Bottom: 9207 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/15/2014Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/6/2014Treatment End Date:9/10/2014
Treatment Summary:6715’ – 7243’ MD & 7524’ – 9207’ MD
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6715 ft.# Of Holes:
Interval Bottom:9207 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)2317
Total Gas Produced (MCF)7115
GOR3070
GOR DeterminationBOE
Average BOE per Day9.718
Average MCFE per Day56.349

 Federal Financial Assurance  i 

 Tribal Well  i No