|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 11/1/2022 Measured TD: 11485 ft. Vertical TD: 7049 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 11/1/2022 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 8/7/2015 | | Proposed Top PZ Location: | Sec:19 Twp: 3N 68W | Footage: 1314 FSL 614 FWL | | Bottom Hole Location: | Sec:19 Twp: 3N 68W | Footage: 1270 FSL 482 FEL | | Proposed Depth/Form: | 11603 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA |
| | |
| Wellbore Completed | | Completion Date: | 7/25/2014 | | Spud Date: | 6/16/2014 | Spud Date Is: | ACTUAL | | Measured TD: | 11485 ft. | Measured PB depth: | 11416 ft. | | True Vertical TD: | 7049 ft. | True Vertical PB depth: | 7049 ft. | | Top PZ Location: | Sec:19 Twp: 3N 68W | Footage: 1314 FSL 614 FWL | | Bottom Hole Location: | Sec:19 Twp: 3N 68W | Footage: 1270 FSL 482 FEL | | Log Types: | CBL, MWD, Open-hole logs for this pad were run on the Boyd 3C-19H-M368 well. | | Casing: | String Type: CONDUCTOR, Hole Size: , Size: , Top: 0 ft., Depth: 93 ft., Weight: 42 , Citings Type: ACTUAL | | Cement: | Sacks: 114, Top: 0 ft., Bottom: 93 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 950 ft., Weight: 40 , Citings Type: ACTUAL | | Cement: | Sacks: 290, Top: 0 ft., Bottom: 950 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: , Top: 0 ft., Depth: 7308 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 600, Top: 1010 ft., Bottom: 7308 ft., Determination Method: CBL | | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11467 ft., Weight: 13.5 , Citings Type: ACTUAL | | Cement: | Sacks: 332, Top: 6308 ft., Bottom: 11467 ft., Determination Method: CALC | | Formation | Interval Top | Log Bottom | Cored | DSTs | | FOX HILLS BASE | 217 ft. | | | | | SUSSEX | 3690 ft. | | | | | SHANNON | 5180 ft. | | | | | TEEPEE BUTTES | 5703 ft. | | | | | SHARON SPRINGS | 6573 ft. | | | | | NIOBRARA | 6678 ft. | | | | | FORT HAYS | 6934 ft. | | | | | CODELL | 6958 ft. | | | | | CARLILE | 9368 ft. | | | |
Formation CARL Formation Classification: OW Status: CM - 6/27/2017 Interval Top: 9368 ft. Interval Bottom: 9410 ft.| Completed Information for Formation CARLILE | | 1st Production Date: | 10/15/2014 | Choke Size: | | | Formation Name: | CARLILE | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | Yes |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CARL. |
| | Perforation Data: | | Interval Top: | 9368 ft. | # Of Holes: | | | Interval Bottom: | 9410 ft. | Hole Size: | |
|
Formation CD-CRL Formation Classification: OW Status: SI - 11/1/2022 Interval Top: 7328 ft. Interval Bottom: 11416 ft.| Completed Information for Formation CODELL-CARLILE | | 1st Production Date: | 10/15/2014 | Choke Size: | 14.000 in. | | Formation Name: | CODELL-CARLILE | Commingled: | No | | Production Method: | | | Open Hole Completion: | Yes |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 9/10/2014 | Treatment End Date: | 9/14/2014 | | Treatment Summary: | • Stages 1-28 treated with 28,378 bbl fresh water, 206 bbl additives and 2,887,059 lbs 40/70 sand proppant. | | Total fluid used in treatment (bbls): | 42912 | Max pressure during treatment (psi): | 7677 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 28 | | Total acid used in treatment (bbls): | 206 | Min frac gradient (psi/ft): | 0.90 | | Recycled water used in treatment (bbls): | 14328 | Total flowback volume recovered (bbls): | 3775 | | Fresh water used in treatment (bbls): | 28378 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 2887059 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7082 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/22/2014 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 267 | | BBLS_OIL | 121 | | BTU_GAS | 1298 | | CALC_BBLS_H2O | 267 | | CALC_BBLS_OIL | 121 | | CALC_GOR | 677 | | CALC_MCF_GAS | 82 | | CASING_PRESS | 1928 | | GRAVITY_OIL | 50 | | MCF_GAS | 82 | | TUBING_PRESS | 1267 |
| | Perforation Data: | | Interval Top: | 7328 ft. | # Of Holes: | 757 | | Interval Bottom: | 11416 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: OW Status: CM - 6/27/2017 Interval Top: 7328 ft. Interval Bottom: 11416 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 10/15/2014 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | Yes |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7328 ft. | # Of Holes: | | | Interval Bottom: | 11416 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI) | Y | Last Production 10/31/2022 |
| Low Producing | Y | Production Period 01/2025 - 12/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|