Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-37796
Well Classification: OW Status: SI - 11/1/2022
Well Name/No:Boyd #3D-19H-M368
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date11/1/2022
FacilityID:433815LocationID:433811
County:WELD #123Location:SWSW 19 3N68W 6
Field:WATTENBERG - #90750Elevation:5005 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1039FSL  612 FWLLat/Long: 40.206520 / -105.052980Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.206516 / -105.052998Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/11/2014
End Date: 9/15/2014
Reported: 10/28/2014
Days to report: 43
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 11/1/2022             Measured TD: 11485 ft.    Vertical TD: 7049 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 11/1/2022
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:8/7/2015
Proposed Top PZ Location:Sec:19 Twp: 3N 68W Footage: 1314 FSL  614 FWL
Bottom Hole Location:Sec:19 Twp: 3N 68W Footage: 1270 FSL  482 FEL
Proposed Depth/Form:11603 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA

Wellbore Completed
Completion Date:7/25/2014
Spud Date:6/16/2014Spud Date Is:ACTUAL
Measured TD:11485 ft.Measured PB depth:11416 ft.
True Vertical TD:7049 ft.True Vertical PB depth:7049 ft.
Top PZ Location:Sec:19 Twp: 3N 68WFootage: 1314 FSL  614 FWL
Bottom Hole Location:Sec:19 Twp: 3N 68WFootage: 1270 FSL  482 FEL
Log Types:CBL, MWD, Open-hole logs for this pad were run on the Boyd 3C-19H-M368 well.
Casing:String Type: CONDUCTOR, Hole Size: , Size: , Top: 0 ft., Depth: 93 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 114, Top: 0 ft., Bottom: 93 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 950 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 290, Top: 0 ft., Bottom: 950 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: , Top: 0 ft., Depth: 7308 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 600, Top: 1010 ft., Bottom: 7308 ft., Determination Method: CBL
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11467 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: 332, Top: 6308 ft., Bottom: 11467 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
FOX HILLS BASE217 ft.
SUSSEX3690 ft.
SHANNON5180 ft.
TEEPEE BUTTES5703 ft.
SHARON SPRINGS6573 ft.
NIOBRARA6678 ft.
FORT HAYS6934 ft.
CODELL6958 ft.
CARLILE9368 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 6/27/2017                 Interval Top: 9368 ft.    Interval Bottom: 9410 ft.

 Completed Information for Formation CARLILE
1st Production Date:10/15/2014Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:Yes
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:9368 ft.# Of Holes:
Interval Bottom:9410 ft.Hole Size:

Formation CD-CRL                 Formation Classification:  OW                 Status:  SI - 11/1/2022                 Interval Top: 7328 ft.    Interval Bottom: 11416 ft.

 Completed Information for Formation CODELL-CARLILE
1st Production Date:10/15/2014Choke Size:14.000 in.
Formation Name:CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/10/2014Treatment End Date:9/14/2014
Treatment Summary:• Stages 1-28 treated with 28,378 bbl fresh water, 206 bbl additives and 2,887,059 lbs 40/70 sand proppant.
Total fluid used in treatment (bbls):42912Max pressure during treatment (psi):7677
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:28
Total acid used in treatment (bbls):206Min frac gradient (psi/ft):0.90
Recycled water used in treatment (bbls):14328Total flowback volume recovered (bbls):3775
Fresh water used in treatment (bbls):28378Disposition method For flowback:DISPOSAL
Total proppant used (lbs):2887059Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7082 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/22/2014Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 267
BBLS_OIL 121
BTU_GAS 1298
CALC_BBLS_H2O 267
CALC_BBLS_OIL 121
CALC_GOR 677
CALC_MCF_GAS 82
CASING_PRESS 1928
GRAVITY_OIL 50
MCF_GAS 82
TUBING_PRESS 1267
Perforation Data:
Interval Top:7328 ft.# Of Holes:757
Interval Bottom:11416 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 6/27/2017                 Interval Top: 7328 ft.    Interval Bottom: 11416 ft.

 Completed Information for Formation CODELL
1st Production Date:10/15/2014Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:Yes
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7328 ft.# Of Holes:
Interval Bottom:11416 ft.Hole Size:
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI)YLast Production
10/31/2022
Low ProducingYProduction Period
01/2025 - 12/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No