Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-37793
Well Classification: OW Status: PR - 10/22/2014
Well Name/No:Boyd #3B-19H-M368
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/22/2014
FacilityID:433812LocationID:433811
County:WELD #123Location:SWSW 19 3N68W 6
Field:WATTENBERG - #90750Elevation:5005 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1059FSL  612 FWLLat/Long: 40.206570 / -105.052980Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.206588 / -105.052987Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/2/2014
End Date: 9/8/2014
Reported: 10/28/2014
Days to report: 50
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 10/22/2014             Measured TD: 11588 ft.    Vertical TD: 7065 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 10/22/2014
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:8/7/2015
Proposed Top PZ Location:Sec:19 Twp: 3N 68W Footage: 1996 FSL  613 FWL
Bottom Hole Location:Sec:19 Twp: 3N 68W Footage: 1976 FSL  501 FEL
Proposed Depth/Form:11664 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED
Cement:Sacks: 80, Top: , Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 800 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 100, Top: , Bottom: 800 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7464 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 422, Top: 500 ft., Bottom: 7464 ft.
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11664 ft., Weight: 13.5 , Citings Type: PLANNED
Cement:Sacks: 172, Top: 7164 ft., Bottom: 11664 ft.

Wellbore Completed
Completion Date:8/11/2014
Spud Date:6/14/2014Spud Date Is:ACTUAL
Measured TD:11588 ft.Measured PB depth:11536 ft.
True Vertical TD:7065 ft.True Vertical PB depth:7065 ft.
Top PZ Location:Sec:19 Twp: 3N 68WFootage: 1996 FSL  613 FWL
Bottom Hole Location:Sec:19 Twp: 3N 68WFootage: 1976 FSL  501 FEL
Log Types:CBL, MWD, Open-hole logs for this pad were run on the Boyd 3C-19H-M368 well.
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 16 in., Top: 0 ft., Depth: 93 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 114, Top: 0 ft., Bottom: 93 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 860 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 305, Top: 0 ft., Bottom: 860 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7461 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 615, Top: 922 ft., Bottom: 7443 ft., Determination Method: CBL
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11588 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: 345, Top: 7443 ft., Bottom: 11577 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
FOX HILLS BASE217 ft.
SUSSEX3690 ft.
SHANNON4180 ft.
TEEPEE BUTTES5703 ft.
SHARON SPRINGS6579 ft.
NIOBRARA6667 ft.
CODELL6965 ft.
CARLILE7264 ft.

Formation CD-CRL                 Formation Classification:  OW                 Status:  PR - 10/22/2014                Interval Top: 7456 ft.    Interval Bottom: 11529 ft.

 Completed Information for Formation CODELL-CARLILE
1st Production Date:10/15/2014Choke Size:14.000 in.
Formation Name:CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/30/2014Treatment End Date:9/8/2014
Treatment Summary:24,083 fresh water, 2,708,580 lbs of sand.
Total fluid used in treatment (bbls):43723Max pressure during treatment (psi):7965
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:28
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.64
Recycled water used in treatment (bbls):19640Total flowback volume recovered (bbls):2241
Fresh water used in treatment (bbls):24083Disposition method For flowback:DISPOSAL
Total proppant used (lbs):2708580Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7218 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/22/2014Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 136
BBLS_OIL 62
BTU_GAS 1298
CALC_BBLS_H2O 136
CALC_BBLS_OIL 62
CALC_GOR 709
CALC_MCF_GAS 44
CASING_PRESS 2300
GRAVITY_OIL 50
MCF_GAS 44
TUBING_PRESS 1319
Perforation Data:
Interval Top:7456 ft.# Of Holes:730
Interval Bottom:11529 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 4/26/2017                 Interval Top: 7456 ft.    Interval Bottom: 11529 ft.

 Completed Information for Formation CODELL
1st Production Date:10/15/2014Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:Yes
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7456 ft.# Of Holes:
Interval Bottom:11529 ft.Hole Size:

Formation CARL                     Formation Classification:  OW                     Status:  CM - 4/26/2017                 Interval Top: 7264 ft.    Interval Bottom: 11335 ft.

 Completed Information for Formation CARLILE
1st Production Date:10/15/2014Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/30/2014Treatment End Date:9/8/2014
Treatment Summary:7264’ – 8342’ MD & 10978’ – 11335’ MD.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:7264 ft.# Of Holes:
Interval Bottom:11335 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)1251
Total Gas Produced (MCF)23764
GOR18996
GOR DeterminationMCFE
Average BOE per Day14.620
Average MCFE per Day84.797

 Federal Financial Assurance  i 

 Tribal Well  i No