|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 10/1/2022 Measured TD: 12087 ft. Vertical TD: 7473 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 10/1/2022 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 8/6/2015 | Proposed Top PZ Location: | Sec:31 Twp: 1N 65W | Footage: 588 FNL 1319 FWL | Bottom Hole Location: | Sec:31 Twp: 1N 65W | Footage: 460 FSL 1322 FWL | Proposed Depth/Form: | 12079 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA | Casing: | String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED | Cement: | Sacks: 80, Top: 0 ft., Bottom: 80 ft. | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1320 ft., Weight: 40 , Citings Type: PLANNED | Cement: | Sacks: 165, Top: 0 ft., Bottom: 1320 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7854 ft., Weight: 26 , Citings Type: PLANNED | Cement: | Sacks: 445, Top: 1020 ft., Bottom: 7854 ft. | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 12078 ft., Weight: 13.5 , Citings Type: PLANNED | Cement: | Sacks: 173, Top: 7554 ft., Bottom: 12078 ft. |
| | |
Wellbore Completed | Completion Date: | 1/5/2014 | Spud Date: | 12/24/2013 | Spud Date Is: | ACTUAL | Measured TD: | 12087 ft. | Measured PB depth: | 12073 ft. | True Vertical TD: | 7473 ft. | True Vertical PB depth: | 7473 ft. | Top PZ Location: | Sec:31 Twp: 1N 65W | Footage: 588 FNL 1319 FWL | Bottom Hole Location: | Sec:31 Twp: 1N 65W | Footage: 460 S 1322 W | Log Types: | MWD/CBL/(IND and DENS run in API:123-18761) | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 16 in., Top: 0 ft., Depth: 114 ft., Weight: 65 , Citings Type: ACTUAL | Cement: | Sacks: 432, Top: 0 ft., Bottom: 114 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1490 ft., Weight: 40 , Citings Type: ACTUAL | Cement: | Sacks: 397, Top: 0 ft., Bottom: 1504 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7811 ft., Weight: 26 , Citings Type: ACTUAL | Cement: | Sacks: 712, Top: 1255 ft., Bottom: 7821 ft., Determination Method: CBL | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 7821 ft., Depth: 12076 ft., Weight: 13.5 , Citings Type: ACTUAL | Cement: | Sacks: 304, Top: 6810 ft., Bottom: 12087 ft., Determination Method: CALC | Formation | Interval Top | Log Bottom | Cored | DSTs | CODELL | | 7774 ft. | | | NIOBRARA | | 7668 ft. | | | SHARON SPRINGS | | 7089 ft. | | | SUSSEX | | 4670 ft. | | | TEEPEE BUTTES | | 6000 ft. | | |
Formation CODL Formation Classification: OW Status: PR - 10/1/2022 Interval Top: 7832 ft. Interval Bottom: 12025 ft. Completed Information for Formation CODELL | 1st Production Date: | 5/29/2014 | Choke Size: | | Formation Name: | CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 5/7/2014 | Treatment End Date: | 5/10/2014 | Treatment Summary: | Stage 1 - Stage 41 treated with a total of: 102,193 bbls of Slickwater Frac (ChemRock), 4,340 bbls of Pump Down No Chemicals, 2,421,210 lbs of 40/70 Proppant | Total fluid used in treatment (bbls): | 106533 | Max pressure during treatment (psi): | 8499 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | Type Of gas: | | Number Of staged intervals: | 41 | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.85 | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 2682 | Fresh water used in treatment (bbls): | 106553 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 2421210 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7552 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 6/6/2014 | Test Method: | Flows from well | Hours Tested: | 24 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 49 | BBLS_OIL | 40 | BTU_GAS | 1298 | CALC_BBLS_H2O | 49 | CALC_BBLS_OIL | 40 | CALC_GOR | 1100 | CALC_MCF_GAS | 44 | CASING_PRESS | 1949 | GRAVITY_OIL | 50 | MCF_GAS | 44 | TUBING_PRESS | 1114 |
| Perforation Data: | Interval Top: | 7832 ft. | # Of Holes: | 1011 | Interval Bottom: | 12025 ft. | Hole Size: | 0.4375 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 1138 |
Total Gas Produced (MCF) | 7826 |
GOR | 6876 |
GOR Determination | BOE |
Average BOE per Day | 6.805 |
Average MCFE per Day | 39.478 |
Federal Financial Assurance | i | |
|
|