|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 8/1/2025 Measured TD: 15187 ft. Vertical TD: 7396 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 8/1/2025 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 8/6/2015 | | Proposed Top PZ Location: | Sec:5 Twp: 2N 67W | Footage: 2719 FNL 1706 FWL | | Bottom Hole Location: | Sec:8 Twp: 2N 67W | Footage: 504 FSL 1820 FWL | | Proposed Depth/Form: | 15142 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 560, Drill Unit: GWA | | Casing: | String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED | | Cement: | Sacks: 80, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 800 ft., Weight: 40 , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 800 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7738 ft., Weight: 26 , Citings Type: PLANNED | | Cement: | Sacks: 438, Top: 500 ft., Bottom: 7738 ft. | | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 15142 ft., Weight: 13.5 , Citings Type: PLANNED | | Cement: | Sacks: 293, Top: 7438 ft., Bottom: 15142 ft. |
| | |
| Wellbore Completed | | Completion Date: | 5/6/2014 | | Spud Date: | 1/29/2014 | Spud Date Is: | ACTUAL | | Measured TD: | 15187 ft. | Measured PB depth: | 15167 ft. | | True Vertical TD: | 7396 ft. | True Vertical PB depth: | 7396 ft. | | Top PZ Location: | Sec:5 Twp: 2N 67W | Footage: 2719 FNL 1706 FWL | | Bottom Hole Location: | Sec:8 Twp: 2N 67W | Footage: 504 FSL 1820 FWL | | Log Types: | CBL/MWD | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 16 in., Top: 0 ft., Depth: 108 ft., Weight: 65.0 , Citings Type: ACTUAL | | Cement: | Sacks: 432, Top: 0 ft., Bottom: 108 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 850 ft., Weight: 40.0 , Citings Type: ACTUAL | | Cement: | Sacks: 360, Top: 0 ft., Bottom: 865 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 9.625 in., Top: 0 ft., Depth: 7609 ft., Weight: 26.0 , Citings Type: ACTUAL | | Cement: | Sacks: 612, Top: 865 ft., Bottom: 7625 ft., Determination Method: CBL | | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 15170 ft., Weight: 13.5 , Citings Type: ACTUAL | | Cement: | Sacks: 570, Top: 7625 ft., Bottom: 15187 ft., Determination Method: CALC | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SHARON SPRINGS | 7069 ft. | 7148 ft. | | | | NIOBRARA | 7149 ft. | 7366 ft. | | | | FORT HAYS | 7367 ft. | 7446 ft. | | | | CODELL | 7447 ft. | 15187 ft. | | |
Formation CODL Formation Classification: OW Status: PR - 8/1/2025 Interval Top: 7774 ft. Interval Bottom: 15120 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 10/26/2014 | Choke Size: | | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 7/30/2014 | Treatment End Date: | 8/11/2014 | | Treatment Summary: | Stage 1 - Stage 50 treated with a total of: 112,161 bbls freshwater, 5,052,193 lbs of 40/70 Sand proppant. | | Total fluid used in treatment (bbls): | 112161 | Max pressure during treatment (psi): | 8087 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 50 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.87 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 1040 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 5052193 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7461 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/5/2014 | Test Method: | | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 56 | | BBLS_OIL | 681 | | BTU_GAS | 1298 | | CALC_BBLS_H2O | 56 | | CALC_BBLS_OIL | 681 | | CALC_GOR | 495 | | CALC_MCF_GAS | 337 | | CASING_PRESS | 2235 | | GRAVITY_OIL | 50 | | MCF_GAS | 337 | | TUBING_PRESS | 959 |
| | Perforation Data: | | Interval Top: | 7774 ft. | # Of Holes: | 1297 | | Interval Bottom: | 15120 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 2630 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 1.258 |
| Average MCFE per Day | 7.290 |
| Federal Financial Assurance | i | |
|
|